网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
When using the Tivoli Dynamic Workload Console, which monitor tasks are available to the user?()
A
all those that have been created by all users
B
just those created by the user in the current session
C
all those created by the user and shared with user’s login group
D
just those where the connection engine specifies the user’s logon
参考答案
参考解析
解析:
暂无解析
更多 “单选题When using the Tivoli Dynamic Workload Console, which monitor tasks are available to the user?()A all those that have been created by all usersB just those created by the user in the current sessionC all those created by the user and shared with user’s login groupD just those where the connection engine specifies the user’s logon” 相关考题
考题
多选题Which two commands are used to migrate IBM Tivoli Workload Scheduler to version 8.5 on a UNIX system?()Alaunch.shBwdinstspbCSETUP.binDtwsinst -migrateESETUP.bin -silent
考题
多选题In an environment that includes both a Master Domain Manager (MDM) and Backup Master Domain Manger (BMDM), which two options are appropriate for the location of the database? ()Alocal database installed on the MDM onlyBlive local database installed on the BMDM onlyCsingle database on a clustered machine remote from the MDM and BMDMDlive database installed on a single Fault Tolerant Agent within IBM Tivoli Workload Scheduler networkElive database on MDM and High Availability Disaster Recovery/Data Guard standby database on BMDM
考题
单选题How can a Job with EXEC as Internal Status be stopped in the Job Scheduling Console?()A
select Kill from the menuB
select Release from the menuC
select Cancel Job from the menuD
select Cancel Pending from the menu
考题
单选题When building the job stream MASTER#NEW_STREAM in the composer command line, which option should be used to apply the settings in the Variable Table "LIVE_VARS" to be associated to the jobs in the job stream?()A
AB
BC
CD
D
考题
单选题An IBM Tivoli Workload Scheduler administrator finds that most of the job streams are carried forward during each production day. Which action should the administrator take to ensure that only a few job streams need to be carried forward? ()A
change start of dayB
disable the Carry Forward optionC
cancel all job streams before start of dayD
Administrator does not have to take any action
考题
单选题When using the Tivoli Dynamic Workload Console, which monitor tasks are available to the user?()A
all those that have been created by all usersB
just those created by the user in the current sessionC
all those created by the user and shared with user’s login groupD
just those where the connection engine specifies the user’s logon
考题
单选题Which report will provide information on the most recently completed plan?()A
Report 08 - Job HistogramB
Report 07 - Job History ListingC
Report 10B - Actual Production DetailD
Report 11 - Planned Production Schedule
考题
单选题Which report will provide information on the most recently completed plan?()A
Report 08 - Job HistogramB
Report 07 - Job History ListingC
Report 10B - Actual Production DetailD
Report 11 - Planned Production Schedule
考题
多选题What are two circumstances for which it may be advisable to use the silent uninstallation method instead of an interactive method?()AThe Administrator is unable to successfully export DISPLAY to a remote server.BIBM Tivoli Workload Scheduler is installed on a server for which there is no console access.CDNS is not working properly and the server cannot be accessed remotely to run the uninstallation script.DTCP on the server on which IBM Tivoli Workload Scheduler is installed is configured for half-duplex rather than full-duplex.EThe remote IBM Tivoli Workload Scheduler server is multi-homed, thus the return connection to IBM Tivoli Workload Scheduler cannot be established thereby requiring the use of the silent uninstaller.
热门标签