Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()
A
An administrative VLAN with port 1808
B
Port 657 which must remain open to TCP/IP and UDP traffic
C
Network addresses are provided by DHCP services on the network
D
DHCP on the HMC is required to be on to communicate between LPAR and HMC
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()A An administrative VLAN with port 1808B Port 657 which must remain open to TCP/IP and UDP trafficC Network addresses are provided by DHCP services on the networkD DHCP on the HMC is required to be on to communicate between LPAR and HMC” 相关考题
考题
A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()
A.Network installation managerB.Boot from installation mediaC.A migration installD.Copy the system using the HMC
考题
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()A、The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP addresses.B、A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.C、Network communications can be implemented through an open network. No private network is required but it is recommended.D、All p5 590 and 595 servers are shipped with one service processor card. A private network is required to manage DHCP addresses.
考题
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
考题
Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()A、An administrative VLAN with port 1808B、Port 657 which must remain open to TCP/IP and UDP trafficC、Network addresses are provided by DHCP services on the networkD、DHCP on the HMC is required to be on to communicate between LPAR and HMC
考题
Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A、Run the test and dev LPARs in an uncapped modeB、Activate COD resources if a failover should occurC、Use DLPAR to move resources between the test and dev and the HACMP LPARD、Stop the test and dev environments, bring up new profile for HACMP failover
考题
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A、The routes on the HMCB、The firewall setting of the LAN adapterC、The name resolution protocol on the p5 590 serverD、The subnet mask settings on the Ethernet adapters
考题
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
A customer has just received three enterprise systems that support a total of 48 LPARs. Which installation method expedite the process?()A、Network installation managerB、Boot from installation mediaC、A migration installD、Copy the system using the HMC
考题
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
考题
A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A、Implement a proxy server to provide multiple sources to one destination B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C、Purchase a network hub or switch so both p5 570s can connect to the single HMC D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used
考题
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()A、Utilize the integrated 10/100/1000 network interfaceB、Implement Virtual Ethernet to enable inter-partition communicationC、Implement shared Ethernet with the Ethernet adapters utilized in the other LPARsD、Implement a Point to Point protocol serial communication between the p5 595 serial ports
考题
Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()A、Enable DHCP server on the HMCB、Configure host name and IP address on DNS serverC、Manually set the IP address of the service processorD、Connect a RS-232 cable from the HMC to the service processor
考题
单选题A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A
Implement a proxy server to provide multiple sources to one destination B
Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C
Purchase a network hub or switch so both p5 570s can connect to the single HMC D
Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used
考题
单选题Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure communication between two of the LPARs within the p5 595 server. They do not have any unused Ethernet adapters. Which of the following recommendations will best meet this requirement?()A
Utilize the integrated 10/100/1000 network interfaceB
Implement Virtual Ethernet to enable inter-partition communicationC
Implement shared Ethernet with the Ethernet adapters utilized in the other LPARsD
Implement a Point to Point protocol serial communication between the p5 595 serial ports
考题
单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A
Purchase a second HMC and use this to manage the new servers.B
Connect all of the new servers to the existing private HMC network.C
Configure a second private network on their existing HMC for the new servers.D
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A
The resources must be unallocated in an LPARB
The microcode on the pSeries must be currentC
All network adapters on the LPAR must be definedD
Network connectivity and name resolution capability between HMC and LPARs
考题
单选题For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a private service network between HMC and the p5 590 required?()A
The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP addresses.B
A firewall is required to isolate the private network from any of the open networks to which the HMC is attached.C
Network communications can be implemented through an open network. No private network is required but it is recommended.D
All p5 590 and 595 servers are shipped with one service processor card. A private network is required to manage DHCP addresses.
考题
单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A
Purchase a second HMC and use this to manage the new servers.B
Connect all of the new servers to the existing private HMC network.C
Configure a second private network on their existing HMC for the new servers.D
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A
The resources must be unallocated in an LPARB
The microcode on the pSeries must be currentC
All network adapters on the LPAR must be definedD
Network connectivity and name resolution capability between HMC and LPARs
考题
单选题Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A
VIO ServerB
AIX 5.2 ML4C
Shared Ethernet AdapterD
AIX 5.3 with Advanced Power Virtualization
考题
单选题Companycom is installing a p5 590 with a HMC to manage LPARs. The customer is very concerned about security and wants to restrict network traffic that is not necessary. What is necessary for communication between the LPARs and the HMC?()A
An administrative VLAN with port 1808B
Port 657 which must remain open to TCP/IP and UDP trafficC
Network addresses are provided by DHCP services on the networkD
DHCP on the HMC is required to be on to communicate between LPAR and HMC
考题
单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A
Free up one HMC and update the software for use with the p5 570B
Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC
Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D
Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
单选题Companycom is trying to communicate with the service processor of the a new p5 590. However, the customer can not access the service processor. What needs to be done to fix this problem?()A
Enable DHCP server on the HMCB
Configure host name and IP address on DNS serverC
Manually set the IP address of the service processorD
Connect a RS-232 cable from the HMC to the service processor
考题
单选题A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A
The routes on the HMCB
The firewall setting of the LAN adapterC
The name resolution protocol on the p5 590 serverD
The subnet mask settings on the Ethernet adapters
考题
单选题Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A
Run the test and dev LPARs in an uncapped modeB
Activate COD resources if a failover should occurC
Use DLPAR to move resources between the test and dev and the HACMP LPARD
Stop the test and dev environments, bring up new profile for HACMP failover
考题
单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A
New install of AIXB
Migrate the 7040-61DC
Utilize alt_disk_installD
Use the enterprise back up strategy