网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
VACUUM GENERATOR的工作条件()
- A、在地面或空中低于16000英尺
- B、仅在地面
- C、仅在空中低于16000英尺
- D、飞机高度高于16000FT
参考答案
更多 “VACUUM GENERATOR的工作条件()A、在地面或空中低于16000英尺B、仅在地面C、仅在空中低于16000英尺D、飞机高度高于16000FT” 相关考题
考题
The frequency of an AC generator is controlled by theA.rheostatB.governorC.exciterD.capacitor
考题
In a modern three-phase A.C. synchronous brushes generator, the excitation winding is on the rotor. That means .A.The generator need not excitation.B.The winding on the rotor is for inputting excitation current.C.There are three phase windings on the rotor.D.The generator has no brushes.
考题
The frequency of an AC generator is controlled by the ___.A.rheostatB.governorC.exciterD.capacitor
考题
单选题The purpose of DC generator brushes is to ().A
neutralize armature reactionB
conduct electric current to an outside circuitC
convert DC current to AC currentD
provide excitation to a DC generator
考题
单选题A DC generator is used to supply direct current in order to maintain an AC generator field and is known as a/an ()A
rotorB
statorC
exciterD
armature
考题
单选题When securing an AC generator, you should FIRST ().A
open the generator circuit breakerB
switch the voltage regulator to “manual”C
decrease the field excitation to minimumD
reduce the load on the unit
考题
单选题The frequency of an AC generator is controlled by the ()A
rheostatB
governorC
exciterD
capacitor
考题
单选题An emergency diesel generator should automatically shut down in the event of ()A
dangerous over-speedingB
a loss of lube oil pressureC
activation of the fixed CO2 system for the emergency generator spaceD
all of the above
考题
单选题The crankcase of many diesel engines are kept under a slight vacuum by the ().A
scavenging action of the pistonB
piston type vacuum pump taking suction off a differential manometerC
gland exhausting manometerD
crankcase exhaust fan
考题
单选题Which one of the followings might not be employed to create vacuum for flash type evaporator? ()A
high-pressure steam-driven air-ejectorB
motor-driven vacuum pumpC
water-motivated air eductorD
centrifuge pump
考题
单选题A diesel generator has just been paralleled with an AC turbo-generator, but the load can not be properly divided.This could be caused by()A
an incorrect diesel generator governor speed droop adjustmentB
a faulty reverse power relay within the main circuit breaker assemblyC
unsynchronized isochronous load distribution adjustmentsD
a different speed setting on each unit
考题
单选题The initial voltage of self-excitation generator set up by()A
residual magnetismB
voltage regulatorC
electrical current for excitationD
the other running generator
考题
单选题Which of the following should be the FIRST step in removing a generator from parallel operation?()A
Trip the generator off the switchboardB
Turn off all electrical equipmentC
Remove the load from the off going generatorD
Increase the cycles of the generator staying on the line
考题
单选题A vacuum is initially created in a flash type distilling plant by().A
the flashing of the feed waterB
the condensation of the saltwater feedC
air ejectors, eductors, or a separate vacuum pumpD
condensation of the distillate
考题
单选题A vacuum is initially established in the first and second stages of a low pressure evaporator by the use of ()A
vacuum drag from the auxiliary condensate systemB
individual vacuum pumpsC
a single non-condensing air ejectorD
a two stage air ejector
考题
单选题In a modern three-phase A-Csynchronous brushless generator, the excitation winding is on the rotorThat means ().A
The generator needs not excitationB
The winding on the rotor is for inputting excitation currentC
There are three phase windings on the rotorD
The generator has brushes
考题
单选题What is TRUE of pressure/vacuum valves? ()A
They are designed to provide for the flow of small volumes of tank atmospheres caused by thermal variations in a cargo tankB
They should operate in advance of the pressure/vacuum breakersC
They should be kept in good working order by regular inspection and cleaningD
All of the above