ACCA考试里面决策树讲的什么意思呢?
发布时间:2021-03-12
ACCA考试里面决策树讲的什么意思呢?
最佳答案
决策树即通过一系列规则对数据进行分类的过程。是指在使用决策树来帮助决策的时候有两个步骤。
第一步,构造决策树。首先是标出我们所要解决的问题,并根据这个问题画出相应的解决方案(决策/解决步骤),然后根据不同的决策,画出某个决策可能产生的结果(financial outcomes)和可能性,(此文中主要是解决一些财经类问题,所以这里的结果泛指经济效果)。在这一过程中,需要运用到相关成本(relevant cost)和相关收入(relevant revenue)的概念,相对应每一个结果只考虑其相关成本和相关收入
第二步就是根据以上的数据对我们需要做的决策进行评估和建议。这一步的操作过程是倒推的过程。根据不同的决策可能产生的结果和可能性计算出不同的结果的应期望值,然后根据期望值倒推回不同的决策。最后根据以上的结论为管理层提供建议。下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。
(ii) Calculate the probability of the net profit being less than £75 million. (2 marks)
(d) Discuss the main benefits that might accrue from the successful implementation of a Total Quality
Management programme by the management of the combined entity. (5 marks)
(d) The benefits that might accrue from the successful implementation of a Total quality management programme by the
management of the combined entity include the following:
– There will be an increased awareness of all personnel within Quicklink Ltd of the need to establish a ‘quality culture’
within the company which will provide a basis of improved performance throughout the organisation.
– The successful adoption of a TQM philosophy would ensure that there is a real commitment to ‘continuous improvement’
in all processes.
– It would place a greater focus on customer satisfaction since at the heart of any TQM programme is a deep-seated
commitment to the satisfaction of every customer.
– There would be a greater emphasis upon teamwork which would be used in a number of forms e.g. quality circles which
could be established with a view to improving performance within every area of the business. The fostering of team spirit
will also improve communication within Quicklink Ltd.
– A major characteristic of a TQM programme is process-redesign which is used to simplify processes, systems,
procedures and the organisation itself. In this respect the adoption of a TQM philosophy will be invaluable since the
integration of the Quicklink Ltd and Celer Transport businesses will require, of necessity, a detailed review of those
processes currently employed.
– The adoption of a TQM philosophy will necessitate the monitoring of quality costs in order to measure whether the
objective of continuous improvement is being achieved. In this respect the aim will be to eliminate internal failure costs
such as late deliveries and lost items which are clearly detrimental to a business which operates in the transport and
haulage industry.
Cherry Blossom Co (Cherry) manufactures custom made furniture and its year end is 30 April. The company purchases its raw materials from a wide range of suppliers. Below is a description of Cherry’s purchasing system.
When production supervisors require raw materials, they complete a requisition form. and this is submitted to the purchase ordering department. Requisition forms do not require authorisation and no reference is made to the current inventory levels of the materials being requested. Staff in the purchase ordering department use the requisitions to raise sequentially numbered purchase orders based on the approved suppliers list, which was last updated 24 months ago. The purchasing director authorises the orders prior to these being sent to the suppliers.
When the goods are received, the warehouse department verifies the quantity to the suppliers despatch note and checks that the quality of the goods received are satisfactory. They complete a sequentially numbered goods received note (GRN) and send a copy of the GRN to the finance department.
Purchase invoices are sent directly to the purchase ledger clerk, who stores them in a manual file until the end of each week. He then inputs them into the purchase ledger using batch controls and gives each invoice a unique number based on the supplier code. The invoices are reviewed and authorised for payment by the finance director, but the actual payment is only made 60 days after the invoice is input into the system.
Required:
In respect of the purchasing system of Cherry Blossom Co:
(i) Identify and explain FIVE deficiencies; and
(ii) Recommend a control to address each of these deficiencies.
Note: The total marks will be split equally between each part.
Cherry Blossom Co’s (Cherry) purchasing system deficiencies and controls
(b) Discuss FOUR factors that distinguish service from manufacturing organisations and explain how each of
these factors relates to the services provided by the Dental Health Partnership. (5 marks)
(b) The major characteristics of services which distinguish services from manufacturing are as follows:
– Intangibility.
When a dentist provides a service to a client there are many intangible factors involved such as for example the
appearance of the surgery, the personality of the dentist, the manner and efficiency of the dental assistant. The output
of the service is ‘performance’ by the dentist as opposed to tangible goods.
– Simultaneity.
The service provided by the dentist to the patient is created by the dentist at the same time as the patient consumed it
thus preventing any advance verification of quality.
– Heterogeneity.
Many service organisations face the problem of achieving consistency in the quality of its output. Whilst each of the
dentists within the Dental Health Partnership will have similar professional qualifications there will be differences in the
manner they provide services to clients.
– Perishability.
Many services are perishable. The services of a dentist are purchased only for the duration of an appointment.
声明:本文内容由互联网用户自发贡献自行上传,本网站不拥有所有权,未作人工编辑处理,也不承担相关法律责任。如果您发现有涉嫌版权的内容,欢迎发送邮件至:contact@51tk.com 进行举报,并提供相关证据,工作人员会在5个工作日内联系你,一经查实,本站将立刻删除涉嫌侵权内容。
- 2021-01-12
- 2021-04-21
- 2021-03-11
- 2021-01-06
- 2021-01-01
- 2021-04-21
- 2021-03-11
- 2021-05-08
- 2021-03-11
- 2021-05-11
- 2021-05-09
- 2021-03-12
- 2021-05-21
- 2021-03-13
- 2021-03-10
- 2021-06-22
- 2021-03-12
- 2021-03-11
- 2021-03-11
- 2021-05-19
- 2021-03-12
- 2021-07-27
- 2021-01-01
- 2021-03-12
- 2021-01-06
- 2021-03-11
- 2021-06-02
- 2021-12-31
- 2021-07-01
- 2021-03-10