ACCA考试学习的内容挺多,acca考试科目如下:
一、基础阶段课程列表
知识课程F1会计师与企业;F2管理会计;F3财务会计
技能课程F4公司法与商法;F5业绩管理P;F6税务;F7财务报告;F8审计与认证业务;F9财务管理
二、专业阶段课程列表
核心课程P1公司治理,风险管理及职业操守P2公司报告P3商务分析
选修课程P4高级财务管理P5高级业绩管理P6高级税务P7高级审计与认证业务


下面小编为大家准备了 ACCA考试 的相关考题,供大家学习参考。

(ii) Describe the evidence you would seek to support the assertion that development costs are technically

feasible. (3 marks)

正确答案:
(ii) Evidence supporting the assertion that development costs are technically feasible would include the following:
– Review the results of scientific tests performed on the products, for example, the results of animal or human testing
of the products.
– Discuss any detrimental results of these tests, e.g. harmful side effects, with the scientists working on the project
to determine what corrective action is being taken.
– Enquire whether any licences necessary for continued development and/or commercial production have been
granted by the appropriate regulatory body.
– Compare expected to actual development costs incurred per product being developed. Where actual costs are in
excess of expected costs investigate whether the extra costs have been incurred in order to make good any problems
identified in the development process.
– Review board minutes for relevant discussion of the product development taking place during the year.

(d) Explain to the management of Bailey’s why consideration should be given to resolving the problems through:

(i) job rotation; (5 marks)

正确答案:
(d) (i) Job rotation is the planned rotation of staff between jobs and tasks to reduce monotony and boredom and provide fresh opportunities and challenges. This could be a useful way of encouraging employees at Bailey’s alongside enrichment and enlargement. Rotation would encourage better understanding between employees at Bailey’s. It takes two forms,the transfer to another job after some time in an existing job and the introduction of another individual to the job being vacated, or as a form. of training where individuals are moved through different jobs to learn new skills.

(b) The management of Division C has identified the need to achieve cost savings in order to become more

competitive. They have decided that an analysis and investigation of quality costs into four sub-categories will

provide a focus for performance measurement and improvement.

Required:

Identify the FOUR sub-categories into which quality costs can be analysed and provide examples (which

must relate to Division C) of each of the four sub-categories of quality cost that can be investigated in order

that overall cost savings might be achieved and hence the performance improved. (8 marks)

正确答案:
(b) Quality costs may be monitored by measuring costs of non-conformance and costs of conformance.
Costs of non-conformance occur when the product fails to reach the design quality standards. Such costs may be subdivided
into internal failure costs and external failure costs.
Internal failure costs occur when the failure is detected before the transfer of the product to the customer.
External failure costs occur when the failure to reach the required standards is not detected until after the product has been
transferred to the customer.
Costs of conformance are those incurred in reducing or eliminating the costs of non-conformance. Such costs may be
subdivided into appraisal costs and prevention costs.
Appraisal costs are those associated with the evaluation of items such as purchased material and services in order to ensure
that they conform. to the agreed specification.
Prevention costs are those associated with the implementation of a quality improvement programme. Such costs are planned
in advance and their implementation should lead to continuous improvement.
Examples of quality costs relevant to Division C may include:
Internal failure costs: cost of materials scrapped due to poor receipt and storage procedures or losses of CC output due to poor
processing routines.
External failure costs: cost of quality problems with batch of CC not detected until it has reached Division B. This may require
free replacement of the batch and compensation for loss of output by Division B.
Appraisal costs: evaluation of purchased material and services in relation to the manufacture of CC to ensure that it conforms
to the agreed specification; e.g. inspection and testing before use.
Prevention costs: the cost of implementation of staff training and the costs of equipment testing to ensure that it conforms to
the specification standards required for the production of CC.
(Alternative relevant examples would be accepted)

(c) Explain the term ‘target costing’ and how it may be applied by GWCC. Briefly discuss any potential

limitations in its application. (8 marks)

正确答案:
(c) Target costing should be viewed as an integral part of a strategic profit management system. The initial consideration in target
costing is the determination of an estimate of the selling price for a new product which will enable a firm to capture its required
share of the market. In this particular example, Superstores plc, which on the face of it looks a powerful commercial
organisation, wishes to apply a 35% mark-up on the purchase price of each cake from GWCC. Since Superstores plc has
already decided on a launch price of £20·25 then it follows that the maximum selling price that can be charged by GWCC
is (100/135) x £20·25 which is £15·00.
This is clearly a situation which lends itself to the application of target costing/pricing techniques as in essence GWCC can
see the extent to which they fall short of the required level of return with regard to a contract with Superstores plc which ends
after twelve months. Thus it is necessary to reduce the total costs by £556,029 to this figure in order to achieve the desired
level of profit, having regard to the rate of return required on new capital investment. The deduction of required profit from
the proposed selling price will produce a target price that must be met in order to ensure that the desired rate of return is
obtained. Thus the main theme that underpins target costing can be seen to be ‘what should a product cost in order to achieve
the desired level of return’.
Target costing will necessitate comparison of current estimated cost levels against the target level which must be achieved if
the desired levels of profitability, and hence return on investment, are to be achieved. Thus where a gap exists between the
current estimated cost levels and the target cost, it is essential that this gap be closed.
The Directors of GWCC plc should be aware of the fact that it is far easier to ‘design out’ cost during the pre-production phase
than to ‘control out’ cost during the production phase. Thus cost reduction at this stage of a product’s life cycle is of critical
significance to business success.
A number of techniques may be employed in order to help in the achievement and maintenance of the desired level of target
cost. Attention should be focussed upon the identification of value added and non-value added activities with the aim of the
elimination of the latter. The product should be developed in an atmosphere of ‘continuous improvement’. In this regard, total
quality techniques such as the use of Quality circles may be used in attempting to find ways of achieving reductions in product
cost.
Value engineering techniques can be used to evaluate necessary product features such as the quality of materials used. It is
essential that a collaborative approach is taken by the management of GWCC and that all interested parties such as suppliers
and customers are closely involved in order to engineer product enhancements at reduced cost.
The degree of success that will be achieved by GWCC via the application of target costing principles will be very much
dependent on the extent of ‘flexibility’ in variable costs. Also the accuracy of information gathered by GWCC will assume
critical importance because the use of inaccurate information will produce calculated ‘cost gaps’ which are meaningless and
render the application of target costing principles of little value.