网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Clock Cycle
参考答案
更多 “Clock Cycle” 相关考题
考题
在VHDL中,用语句_表示clock的下降沿
A.clock’EVENTB.clock’EVENT AND clock=’1’C.clock=’0’D.clock’EVENT AND clock=’0’
考题
在VHDL中,用语句( )表示检测clock的上升沿。
A.clock’EVENTB.clock’EVENT AND clock=’1′C.Clok=’0′D.clock’EVENT AND clock=’0′
考题
将当前目录下的图形文件Clock.jpg装入图片框Picture1的语句是( )。A、 Picture = "Clock1.jpg"B、 Picture = LoadPicture("Clock1.jpg")C、 Picture1.Picture = "Clock1.jpg"D、 Picture1.picture = LoadPicture("Clock1.jpg")
考题
语句“newUiObject(newUiSelector().text("Clock"))”表示查找满足条件()的元素。
A.text属性为“Clock”B.class属性为“Clock”C.description属性为“Clock”D.id属性为“Clock”
考题
下面哪些句子表示"下午4点钟可以吗?"()
A、Is D o'clock in the afternoon OK/?B、Is D o'clock in the afternoon suit with you?C、Is D o'clock in the afternoon all right with you?D、Is D o'clock in the afternoon fine with you?
考题
Due to GPS roll over of the clock cycle,GPS receivers may give the wrong time and position or may lock up permanently on ______.A.21-Aug-99B.21-Sep-99C.October 31,1999D.31-Dec-99
考题
Decide on the correct stress pattern of the answer to the question: When shall we go to school?A.I think we should leave at seven o'clock.
B.I think we should leave at seven o'clock.
C.I think we should leave at seven o'clock.
D.I think we should leave at seven o'clock.
考题
The Cisco Smart Business Communications System offers support of third-party applications. When using TimeCard View, what device is used by employees to clock in and clock out?() A、 IP phoneB、 wireless access pointC、 secure routerD、 time clock
考题
One hertz is equal to one ( )A、cycle per centimeterB、cycle per meterC、cycle per secondD、cycle per eV
考题
关于CYCLE93指令,()(SIEMENS系统)。A、CYCLE93是切槽循环指令B、使用CYCLE93指令可以简化编程C、CYCLE93指令可实现断屑加工D、CYCLE93指令可用于切削圆锥面和圆弧面E、CYCLE93可用于径向沟槽的切削加工
考题
关于CYCLE83指令,下面说法正确的是()A、CYCLE83是深钻孔循环指令B、使用CYCLE83指令可以简化编程C、CYCLE83指令执行连续切削进给到孔的地步D、完成CYCLE83指令后刀具将返回到参考平面E、用CYCLE83指令钻孔切削到孔底后,刀具快速返回
考题
如果要在Visual FoxPro系统窗口的状态栏中显示时钟,应该执行的命令是()。A、SET CLOCK STATUSB、SET CLOCK TOC、SET CLOCK OND、AUTO CLOCK
考题
Which of the following is the definition of CAS latency?()A、 CAS latency is the ratio between the column access time and the clock cycle time.B、 CAS latency is the ratio between the row access time and the clock cycle time.C、 CAS latency is the ratio between the column access time and the data burst transfer time.D、 CAS latency is the ratio between the row access time and the data burst transfer time.
考题
Some xSeries servers support 4-way memory interleaving and some support 2-way interleaving. In both types of interleaving, the data is accessed 256 bits at a time. How is this 256-bit data access achieved with 2-way interleaving?()A、The DIMMs used for 2-way interleaving are double the width of DIMM used in 4-way interleaving.B、The DIMMs used for 2-way interleaving are 64-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.C、The DIMMs used for 2-way interleaving are 32-bit wide and data bits are accessed both on the rising edge and falling edge of the clock cycle.D、The DIMMs used for 2-way interleaving are double the width and data bits are accessed both on the rising edge and falling edge of the clock cycle.
考题
单选题Proper lubrication of the main bearing is more easily obtained in a single acting four-stroke/cycle diesel engine than in a single acting two-stroke/cycle diesel engine because ()A
bearing pressure in a four-stroke/cycle acting single diesel engine is continually reversedB
bearing pressure in a two-stroke/cycle single acting diesel engine is continually reversedC
the maximum bearing pressure is higher in a single acting two-stroke/cycle diesel engineD
two-stoke/cycle diesel engines require more complicated lubrication piping
考题
单选题When two AC generators are being paralleled, the breaker should be closed with the synchroscope pointer mating in the ()A
slow direction, just before the 12 o'clock positionB
fast direction, just after the 12 o'clock positionC
fast direction, just before the 12 o'clock positionD
slow direction, just after the 12 o'clock position
考题
单选题Due to GPS roll over of the clock cycle,GPS receivers may give the wrong time and position or may lock up permanently on().A
21-Aug-99B
21-Sep-99C
Octoer 31,1999D
31-Dec-99
考题
单选题The size of the exhaust valve opening is ()A
most critical in a four-stroke cycle diesel engineB
most critical in a two-stroke/cycle diesel engineC
most critical in a four-stroke/cycle diesel engine if it is turbochargedD
of equal importance in a two-stroke/cycle diesel engine as in a four-stroke/cycle diesel engine
考题
单选题Which of the following is the definition of CAS latency?()A
CAS latency is the ratio between the column access time and the clock cycle time.B
CAS latency is the ratio between the row access time and the clock cycle time.C
CAS latency is the ratio between the column access time and the data burst transfer time.D
CAS latency is the ratio between the row access time and the data burst transfer time.
考题
单选题Which of the following statements is true regarding the installation of piston rings on two-stroke/cycle, diesel engines as compared to four-stroke/cycle, diesel engines?()A
In a two-stroke/cycle engine, the rings run hotter, requiring the end gap to be greaterB
Some provision must be made in a two-stroke/cycle engine to keep the rings from binding in the portsC
No gap is required to exist between the ends of the ring when cold in a two-stroke/cycle engine, but a small gap is required in a four-stoke/cycle engineD
The gaps should be staggered on either side of a piston in a two-stroke/cycle engine, while staggering is not necessary in a four-stroke/cycle engine
考题
单选题In diesel engines, the four basic events (intake, compression, power and exhaust) are performed once in ().A
two crankshaft revolutions in a two-stroke/cycle engineB
two power strokes in a two-stroke/cycle engineC
one power stroke in a two-stroke/cycle engineD
two piston strokes in a two-stroke/cycle engine
热门标签
最新试卷