网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The safe working load of the ()is 100 tons.

  • A、single derrick
  • B、derrick
  • C、heavy derrick
  • D、deck

参考答案

更多 “The safe working load of the ()is 100 tons.A、single derrickB、derrickC、heavy derrickD、deck” 相关考题
考题 What ________ the safe working load of the derrick?A.isB.beC.areD.has

考题 Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years

考题 The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post

考题 When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

考题 材料:An aircraft lift on board RFA Argus was loaded beyond its safe working load of 18.4 tonnes.There were no injuries to any personnel,or material damage to the ship or its equipment.During a planned stay in port,500 compressed CO2 cylinders were required to be landed.These were normally stowed on a lower deck and needed to be transferred to the weather deck before being taken ashore.Before the vessels arrival in port,the planned operation was discussed between various officers and senior ratings,one of whom was to supervise final discharge of the cylinders from the ship.Once in port,a senior rating gave instructions to three juniors to transfer a number of cylinders to the weather deck.He then left them alone to load the cylinders onto the platform. of an aircraft lift.The cylinders weighed 19.95 tonnes,which was greater than they had been instructed to load.In addition to this excess weight they added a fork lift truck weighing 5.5 tonnes.The lift was then raised.When it reached the weather deck,the lift was unable to stow at the correct level.When investigated it was discovered that the load of both CO2 bottles and the fork lift truck was greater than its safe working load(SWL)and this had prevented the locking cleats at the flight deck(weather deck)engaging.问题:The lift was taken out of service for testing and inspection. The safe working load of the aircraft lift is ________ tonnes.A.18.4B.19.95C.5.5D.500The aircraft lift was overloaded by a weight which is ________ more than its SWLA.1.55B.3.95C.5.5D.7.05It is implied in the passage that ________.A.the lift should be raised slowly to avoid the accidentB.the aircraft lift on board RFA Argus should be driven by super powerC.the senior rating should give instructions in more detail to the three juniors to transfer a number of cylinders to the weather deckD.if the unloading operation was supervised by an officer who has sufficient experience of the loads,lifting equipment and the overall operation,the accident would had been avoidedIt was the ________ that had prevented the locking cleats at the flight deck(weather deck)engaging.A.fork liftB.CO2 bottlesC.overloaded weightD.the three juniors请帮忙给出每个问题的正确答案和分析,谢谢!

考题 A bridle for an ocean tow consists of ______.A.two chains of equal lengthB.a single nylon pendant rove through a heavy ring free to move on the pendantC.two long legs of wire rope shackled to a fishplateD.a single length of heavy chain with both ends secured on deck to welded pad eyes

考题 In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load

考题 A ()is used for lifting long heavy cargo.A、derrickB、craneC、jumbo boomD、boom

考题 The()(千斤索) is a wire used to take the weight off.A、light derrickB、union purchaseC、topping liftD、heavy derrick

考题 I think you’d better use the ()(岸吊).A、derrickB、heavy derrickC、shore craneD、floating crane

考题 This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick

考题 The ()(千斤滑车) can run the gooseneck.A、heavy derrickB、pulley blockC、topping lift blockD、guy tackle

考题 The bosun is scraping the ()on deck.A、loose paintB、bollardC、derrickD、bridge

考题 The safe working load of the derrick is ().A、5 tonsB、5 metresC、5 feetD、5 years

考题 The ()(重吊杆) can lift heavy cargo.A、heavy cargo derrickB、heavy deckC、jumbo boomD、heavy block

考题 A ()(重吊杆)is used for lifting long heavy cargo.A、derrickB、craneC、jumbo boornD、special crane

考题 Swing the ()to starboard side, please.A、winchB、derrickC、craneD、deck

考题 双层底()A、heavy derrickB、single tankC、double tankD、double bottom

考题 Containers are loaded and discharged by().A、heavy derrickB、special cranesC、fork trucksD、winch

考题 There is no power for the ().A、derrickB、winchC、blockD、heavy derrick

考题 “SWL” means ().A、safe working loadB、safe work loadC、safe worked loadD、safely working load

考题 起重机()A、derrickB、heavy derrickC、craneD、boom

考题 单选题The safe working load of the derrick is ().A 5 tonsB 5 metresC 5 feetD 5 mile

考题 单选题A bridle for an ocean tow consists of().A two chains of equal lengthB a single nylon pendant rove through a heavy ring free to move on the pendantC two long legs of wire rope shackled to a fishplateD a single length of heavy chain with both ends secured on deck to welded pad eyes

考题 单选题The safe working load of the ()is 100 tons.A single derrickB derrickC heavy derrickD deck

考题 单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().A yearB two yearsC four yearsD five years

考题 单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().A winch speedB boom strengthC load radiusD cable strength