网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The safe working load of the derrick is ().
- A、5 tons
- B、5 metres
- C、5 feet
- D、5 mile
参考答案
更多 “The safe working load of the derrick is ().A、5 tonsB、5 metresC、5 feetD、5 mile” 相关考题
考题
Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years
考题
The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post
考题
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength
考题
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
考题
The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨
考题
以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.A、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。D、以上都对
考题
英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t
考题
Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading
考题
单选题In determining a safe speed()shall not be among those taken into account.A
the characteristics,efficiency and limitation of the radar equipmentB
any constraints imposed by the radar range scale in useC
the effect on radar detection of the sea state,weather and other sources of interferenceD
the safe working load of the cranes both on board and ashore
考题
单选题The safe working load of the derrick is 5 tons.()A
吊杆的安全工作负荷量是5吨B
龙门吊的安全工作负荷量是5吨C
起货机的安全工作负荷量是5吨D
重吊杆的安全工作负荷量是5吨
考题
单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().A
yearB
two yearsC
four yearsD
five years
考题
单选题Blocks and falls used as lifeboat gear must be designed with a minimum safety factor of().A
4,based on the breaking strengthB
5,based on the maximum allowable stressC
6,based on the maximum working loadD
8,based on the normal working load
考题
单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().A
winch speedB
boom strengthC
load radiusD
cable strength
热门标签
最新试卷