网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The ()is pumped onto the ship at the loading port by shore pumps.
A
oil
B
gas
C
water and fuel
D
timber
参考答案
参考解析
解析:
暂无解析
更多 “单选题The ()is pumped onto the ship at the loading port by shore pumps.A oilB gasC water and fuelD timber” 相关考题
考题
Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION
考题
My ship is ______ No.5 Berth for loading.A.onto the wharfB.moved asternC.into the dockD.moored alongside
考题
If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses ______.A.applyB.complyC.supplyD.reply
考题
Oil slick caused by spillage of oil from tanker ship is ______.A.a drop of oilB.the emulsion of oil at sea surfaceC.the weathered oilD.the oil floating on the surface of the sea water
考题
The international shore connection required on a ship is designed to ______.A.Permit discharge of waste oilB.Allow hook up of fire fighting water from a dock or another vesselC.Satisfy pollution prevention requirementsD.Allow emergency use of the fire main for deballasting
考题
The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber
考题
翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes
考题
At the ()port, tankers pump the oil ashore using her own pumps.A、dischargingB、loadC、loadingD、charging
考题
单选题A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().A
holding its slops onboard until they can be pumped into the city sewer systemB
circulating them through the lube oil purifier to remove water and debrisC
holding its slops onboard until they can be discharged to a shore side reception facilityD
pumping them into a settling tank for separation before pumping the oily water residue overboard
考题
单选题The port State control officer may ensure that()are exhibited in conspicuous places throughout the ship.A
survey planning documentB
muster listsC
bulk carrier bookletD
bulk carrier loading triangle
考题
单选题When the ship security alert system is activated, it shall not()A
initiate a ship-to-shore security alertB
transmit a ship-to-shore security alertC
initiate an alert identifying the ship, its locationD
raise a security alarm on-board the ship indicating that the ship is under threat
考题
单选题Sea water temporarily pumped into tanks to simulate the increased vertical loading of environmental forces is termed().A
preloadB
liquid variable loadC
fixed loadD
basic load
考题
单选题A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship?().A
Bill of GoodsB
Bill of LadingC
Cargo ManifestD
Cargo Receipt
考题
单选题If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().A
applyB
complyC
supplyD
reply
考题
单选题The oil is usually pumped into ship at the loading port by().A
ship’s own pumpsB
shore pumpsC
large pipesD
large tubes
考题
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A
in the loading placeB
in the port or dockC
in the loading spotD
in the discharging spot
考题
问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port
考题
单选题The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().A
the port of destinationB
the next port of callC
the port of arrivalD
the last port of call
考题
单选题The loading of the ship must be done in accordance with().A
the ship’s instructionsB
the terminal’s instructionsC
the port captain’s instructionsD
the charterer’s instructions
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A
INTERNATIONAL LOAD LINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION
考题
单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A
beforeB
whenC
afterD
during
考题
单选题If there are a number of survivors in the water after abandoning ship,they should().A
tie themselves to the unit so they won't drift with the currentB
form a small circular group to create a warmer pocket of water in the center of the circleC
send the strongest swimmer to shore for assistanceD
form a raft by lashing their life preservers together
考题
单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().A
the port of destinationB
the next port of callC
the port of arrivalD
the last port of call
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ().A
INTERNATIONAL LOADLINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION