网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The ()is pumped onto the ship at the loading port by shore pumps.
A

oil

B

gas

C

water and fuel

D

timber


参考答案

参考解析
解析: 暂无解析
更多 “单选题The ()is pumped onto the ship at the loading port by shore pumps.A oilB gasC water and fuelD timber” 相关考题
考题 43________.A.necessB.gasC.restD.water

考题 Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION

考题 My ship is ______ No.5 Berth for loading.A.onto the wharfB.moved asternC.into the dockD.moored alongside

考题 If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses ______.A.applyB.complyC.supplyD.reply

考题 Oil slick caused by spillage of oil from tanker ship is ______.A.a drop of oilB.the emulsion of oil at sea surfaceC.the weathered oilD.the oil floating on the surface of the sea water

考题 The international shore connection required on a ship is designed to ______.A.Permit discharge of waste oilB.Allow hook up of fire fighting water from a dock or another vesselC.Satisfy pollution prevention requirementsD.Allow emergency use of the fire main for deballasting

考题 The ()is pumped onto the ship at the loading port by shore pumps.A、oilB、gasC、water and fuelD、timber

考题 The common type of liquid cargo is ().A、oilB、chemicalC、gasD、timber

考题 翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

考题 The oil is usually pumped into ship at the loading port by().A、ship’s own pumpsB、shore pumpsC、large pipesD、large tubes

考题 At the ()port, tankers pump the oil ashore using her own pumps.A、dischargingB、loadC、loadingD、charging

考题 单选题A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().A holding its slops onboard until they can be pumped into the city sewer systemB circulating them through the lube oil purifier to remove water and debrisC holding its slops onboard until they can be discharged to a shore side reception facilityD pumping them into a settling tank for separation before pumping the oily water residue overboard

考题 单选题The port State control officer may ensure that()are exhibited in conspicuous places throughout the ship.A survey planning documentB muster listsC bulk carrier bookletD bulk carrier loading triangle

考题 单选题When the ship security alert system is activated, it shall not()A initiate a ship-to-shore security alertB transmit a ship-to-shore security alertC initiate an alert identifying the ship, its locationD raise a security alarm on-board the ship indicating that the ship is under threat

考题 单选题Sea water temporarily pumped into tanks to simulate the increased vertical loading of environmental forces is termed().A preloadB liquid variable loadC fixed loadD basic load

考题 单选题A vessel has completed loading cargo in the port of San Francisco. What document is signed by the Master stating the terms that goods were delivered by the shipper and were received by the ship?().A Bill of GoodsB Bill of LadingC Cargo ManifestD Cargo Receipt

考题 单选题If a chartered ship is prevented from,or delayed in,getting to the loading port by peril excepted during the voyage,the exception clauses().A applyB complyC supplyD reply

考题 单选题The oil is usually pumped into ship at the loading port by().A ship’s own pumpsB shore pumpsC large pipesD large tubes

考题 单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A in the loading placeB in the port or dockC in the loading spotD in the discharging spot

考题 问答题翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

考题 单选题The present voyage of my ship began at the port of Shanghai after loading 8 000 tons of Cargo on board and ended after discharging the Cargo at the port of Hong Kong,which was().A the port of destinationB the next port of callC the port of arrivalD the last port of call

考题 单选题The loading of the ship must be done in accordance with().A the ship’s instructionsB the terminal’s instructionsC the port captain’s instructionsD the charterer’s instructions

考题 单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A INTERNATIONAL LOAD LINE CERTIFICATEB PASSENGER SHIP SAFETY CERTIFICATEC CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED GENERAL DECLARATION

考题 单选题The port clearance for a ship should be granted()the completion of loading or discharging in the port.A beforeB whenC afterD during

考题 单选题If there are a number of survivors in the water after abandoning ship,they should().A tie themselves to the unit so they won't drift with the currentB form a small circular group to create a warmer pocket of water in the center of the circleC send the strongest swimmer to shore for assistanceD form a raft by lashing their life preservers together

考题 单选题The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().A the port of destinationB the next port of callC the port of arrivalD the last port of call

考题 单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ().A INTERNATIONAL LOADLINE CERTIFICATEB PASSENGER SHIP SAFETY CERTIFICATEC CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED GENERAL DECLARATION