网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
A
LCG
B
transverse moment
C
righting moment
D
inclining moment
参考答案
参考解析
解析:
暂无解析
更多 “单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A LCGB transverse momentC righting momentD inclining moment” 相关考题
考题
On a vessel, multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n) ______.A.transverse momentB.vertical momentC.righting momentD.inclining moment
考题
Where is the GMDSS Radio Logbook kept aboard ship?A.Attached to the Deck LogbookB.At the principal radio operating locationC.In the Chief Mate’s officeD.In the Master’s office
考题
The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load
考题
Floors aboard ship are ______.A.frames to which the tank top and bottom shell are fastened on a double bottomed shipB.transverse members of the ships frame which support the decksC.longitudinal beams in the extreme bottom of a ship from which the ship's ribs startD.longitudinal angle bars fastened to a surface for strength
考题
Aboard a vessel, dividing the sum of the longitudinal moments by total weight yields the vessel’s ______.A.inclining momentsB.righting momentsC.vertical momentsD.longitudinal position of the center of gravity
考题
Aboard a vessel, dividing the sum of the vertical moments by total weight yields the vessel’s_____.A.height of the center of gravityB.vertical momentsC.righting momentsD.inclining moments
考题
Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.A.LCGB.longitudinal momentC.righting momentD.inclining moment
考题
In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load
考题
从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.
考题
单选题The deadweight of a bulk carrier consists of().A
the weight of the ship's structure and its machineryB
bunker and other consumable loadsC
ballast loadsD
all those weights,such as the weight of the bunkers,ballast,provisions and cargo
考题
单选题Floors aboard ship are().A
frames to which the tank top and bottom shell are fastened on a double bottomed shipB
transverse members of the ships frame which support the decksC
longitudinal beams in the extreme bottom of a ship from which the ship's ribs startD
longitudinal angle bars fastened to a surface for strength
考题
单选题In relation to cargo gear,what does SWL mean?().A
Safe working loadB
Ship's working liftC
Starboard wing liftD
Stress,weight,load
考题
单选题Aboard a vessel,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A
TCGB
transverse momentC
righting momentD
transverse free surface moment
考题
单选题Aboard a vessel, dividing the sum of the vertical moments by the total weight yields the vessel’s().A
height of the center of gravity A.LCGB
vertical momentC
righting momentD
inclining moment
考题
单选题Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in th eload’s().A
TCGB
transverse momentC
righting momentD
transverse free surface moment
考题
单选题0n a vessel,multipiying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().A
transverse momentB
vertical momentC
righting momentD
inclining moment
考题
单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().A
winch speedB
boom strengthC
load radiusD
cable strength
考题
单选题An electrical device which employs a stationary armature and a rotating electromagnetic field is used aboard ship as a ().A
magnetic amplifierB
ship’s service alternatorC
three-wire DC generatorD
saturable core reactor
考题
单选题Aboard a vessel, dividing the sum of the vertical moment by the total weight yields the vessel’s().A
vertical momentB
transverse position of the center of gravityC
inclining momentD
righting moment
考题
单选题Traditionally,the signal for fire aboard ship is().A
more than 6 short blasts and 1 long blast on the whistle,and the same signal on the general alarmB
continuous sounding of the ship's whistle and the general alarm for at least 10 secondsC
1 short blast on the whistleD
alternating short and long blasts on the ship's whistle
考题
单选题Which statement regarding garbage disposal is correct?()A
Records for ground garbage disposal are not required when disposal into the sea occurs more than 25 miles offshoreB
Discharging or transfer of garbage while in port to a shore facility must he recordedC
Maintaining records for the incineration of garbage aboard ship is not requiredD
The recording of garbage disposal should include the approximate weight
考题
单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().A
maximum counter weight requiredB
minimum horsepower requiredC
hoist rope strengthD
allowable load
考题
单选题()is not a static load.A
Actual weight of the ship's structure,outfitting,equipment and machineryB
Ballast load(weight)C
Cargo loadD
Slamming and sloshing load
考题
单选题On a vessel,multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().A
transverse momentB
vertical momentC
righting momentD
inclining moment
考题
单选题Your assigned emergency station aboard ship can be found on the ship’s ()A
station billB
clearance papersC
certificate of inspectionD
permit to proceed
考题
单选题从水线到船底是“吃水”。()A
“From the centerline to the ship’s bottom” is “draft”.B
“From the keel to the ship’s bottom” is “draft”.C
The maximum distance from the waterline to the ship’s bottom is “draft”.D
“From the centerline to the ship’s main deck” is “draft”.
考题
单选题At the instant when a string of casing being run from a ship is landed in the well head,().A
the total weight in air of the casing string is removed from the shipB
the hook load (weight of the casing string) is removed from the shipC
the weight of the casing inside the riser is removed from the shipD
the weight of the casing string added to the weight of the fill-up mud is removed from the ship
热门标签
最新试卷