The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().
A

maximum counter weight required

B

minimum horsepower required

C

hoist rope strength

D

allowable load


参考答案

参考解析
解析: 暂无解析
更多 “单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load” 相关考题
考题 How should you signal the crane operator to lower the boom and raise the load ________.A.Extend arm and point finger in the direction to move the boomB.Extend arm with thumb pointing downward and flex fingers in and outC.With forearm vertical and forefinger pointing up,move hand in small horizontal circlesD.With arm extended downwards and forefinger pointing down,move hand in small horizontal circles

考题 The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

考题 The Master or person in charge of a ship shall ensure the crane record book shows the ______.A.Date and description of each failureB.Average load in pounds for each usageC.Total number of lifts for each usageD.All of the above

考题 When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

考题 Which statement comparing a shipboard crane to conventional gear is TRUE ________.A.Cranes are more difficult to secure for seaB.The spotting area of the conventional gear is largerC.A crane operator requires more training than the winch operator of a yard and stay rigD.The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes

考题 Which of the following statements is TRUE regarding crane operations ________.A.Radio communications allow the crane operator to disregard the use of hand signalsB.The crane operators and signalman must be familiar with the correct hand signalsC.The forward cranes can be operated from the bridgeD.The aft cranes can be operated from the aft steering station

考题 During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet

考题 It is the responsibility of the crane operator to, at all times, be aware of the location of the __.A.loadB.hookC.boomD.All of the above

考题 The ()(浮吊) can float on water used to load and unload the cargo.A、floating craneB、jumbo boomC、union purchaseD、crane

考题 单选题Which statement comparing a shipboard crane to conventional gear is TRUE().A Cranes are more difficult to secure for seaB The spotting area of the conventional gear is largerC A crane operator requires more training than the winch operator of a yard and stay rigD The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes

考题 单选题During which condition should the operator of a pedestal crane shutdown operations?()A Lightning in the vicinityB An approaching squall lineC A fire on the pierD All of the above

考题 单选题The diesel engine consumes considerably less fuel than the steam engine for equal output, () enables a motor-ship to load more cargo.A whyB whichC in whichD on which

考题 单选题Which of the following statements is TRUE regarding crane operations().A Radio communications allow the crane operator to disregard the use of hand signalsB The crane operators and signalman must be familiar with the correct hand signalsC The forward cranes can be operated from the bridgeD The aft cranes can be operated from the aft steering station

考题 单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().A winch speedB boom strengthC load radiusD cable strength

考题 单选题The crane is usually mounted on a pedestal to offer adequate () to the operator.A timeB spaceC lengthD visibility

考题 单选题During which condition should the operator of a pedestal crane shutdown operations?()A BunkeringB High windsC Potable water spill on deck

考题 单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()A Let go of both control levers and return to neutral positionB Press the emergency stopC Notify the mate on watchD All of the above

考题 单选题How should you signal the crane operator to move slowly().A Use one hand to give any motion signal,and place the other hand motionless in front of the hand giving the motion signaB Extend arm with the thumb pointing up,and flex the fingers in and out for as long as the load movement is desiredC First tap your elbow with one hand and then proceed to use regular signalsD First tap the top of your head with your fist and then proceed to use regular signals

考题 单选题How should you signal the crane operator to lower the boom and raise the load().A Extend arm and point finger in the direction to move the boomB Extend arm with thumb pointing downward and flex fingers in and outC With forearm vertical and forefinger pointing up,move hand in small horizontal circlesD With arm extended downwards and forefinger pointing down,move hand in small horizontal circles

考题 单选题The Master or person in charge of a ship shall ensure the crane record book shows the().A Date and description of each failureB Average load in pounds for each usageC Total number of lifts for each usageD All of the above

考题 单选题Annual inspection of vessel cranes shall be conducted by().A HASB the person in chargeC a qualified inspectorD the crane operator

考题 单选题The load chart of a crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load

考题 单选题The operator of the ship’s radiotelephone,if the radiotelephone is carried voluntarily,must hold at least a().A Mate's licenseB Restricted radiotelephone operator permitC Second-class radio operator's licenseD Seaman's document

考题 单选题How should you signal the crane operator to raise the boom and lower the load?().A Extend arm with the palm down and and hold this position rigidlyB Place both fists in front of the body with the thumbs pointing outward each otherC Clasp hands in front of you bodyD Extend arm with the thumb pointing up, and flex the finger s in and out for as long as the load movement is desired

考题 单选题What does “evel-luffing” accomplish during crane operations().A It prevents the load from swinging when the boom level is adjustedB Less power is needed when topping the boom with a load on the hookC It maintains the height of the load above the deckD All of the above

考题 单选题Your ship is solely to blame()the damage to my crane.A toB forC ofD on

考题 单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().A boom angleB boom strengthC load radiusD cable strength