题目内容 (请给出正确答案)
单选题
On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().
A

winch speed

B

boom strength

C

load radius

D

cable strength


参考答案

参考解析
解析: 暂无解析
更多 “单选题On a ship’s crane,the load chart relates the allowable load to the combination of the boom length and().A winch speedB boom strengthC load radiusD cable strength” 相关考题
考题 The stevedores are going to load your ship in ________ daysA.fewB.a fewC.littleD.a little

考题 Which statement(s) is/are TRUE concerning crane cargo operations?A.Do not exceed rated load capacity of crane and container spreader or slingsB.During any cargo handling operation,the safety of personnel is paramountC.Cargo handlers must be outfitted with adequate protection from personal injuryD.All the above

考题 The document that certifies the correctness of the load line marks on a ship is called the ______.A.Certificate of InspectionB.Load line certificateC.Certificate of DocumentationD.SOLAS Certificate

考题 The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the ______.A.Maximum counter weight requiredB.Minimum horsepower requiredC.Hoist rope strengthD.Allowable load

考题 The Master or person in charge of a ship shall ensure the crane record book shows the ______.A.Date and description of each failureB.Average load in pounds for each usageC.Total number of lifts for each usageD.All of the above

考题 What does “evel-luffing” accomplish during crane operations ________.A.It prevents the load from swinging when the boom level is adjustedB.Less power is needed when topping the boom with a load on the hookC.It maintains the height of the load above the deckD.All of the above

考题 When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

考题 Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the mid-ship section results in the load’s ______.A.LCGB.longitudinal momentC.righting momentD.inclining moment

考题 The ()(浮吊) can float on water used to load and unload the cargo.A、floating craneB、jumbo boomC、union purchaseD、crane

考题 单选题Aboard a vessel,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A TCGB transverse momentC righting momentD transverse free surface moment

考题 单选题The reason for the obligation to load a full cargo()that otherwise the Shipowner would lose freight on account of some part of the ship’s carrying capacity not being utilized.A isB makesC hasD takes

考题 单选题Which system(s) in the hydraulic systems of crane always hold(s) single side of load?()A hoisting system onlyB hoisting system and luffing systemC hoisting system and slew and slewing systemD slewing system only

考题 单选题When ship is fouled, increasing the fuel injection for keeping the normal speed will cause the main engine ()A to work as overload characteristicB overspeedC over mechanical load onlyD over thermal load only

考题 单选题In cargo crane, () for lifting the load.A a hoisting motorB a luffing motorC a mooring motorD a slewing motor

考题 单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A LCGB transverse momentC righting momentD inclining moment

考题 单选题Which statement(s) is/are TRUE concerning crane cargo operations? ()A Do not exceed rated load capacity of crane and container spreader or slingsB During any cargo handling operation,the safety of personnel is paramountC Cargo handlers must be outfitted with adequate protection from personal injuryD All the above

考题 单选题The center of gravity of a freely swinging load suspended from a pedestal crane acts as if it were located at the().A counterweightB pedestalC longitudinal centerlineD point of suspension

考题 单选题The Master or person in charge of a ship shall ensure the crane record book shows the().A Date and description of each failureB Average load in pounds for each usageC Total number of lifts for each usageD All of the above

考题 单选题When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to().A winch speedB boom strengthC load radiusD cable strength

考题 单选题The load chart of a crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load

考题 单选题How should you signal the crane operator to raise the boom and lower the load?().A Extend arm with the palm down and and hold this position rigidlyB Place both fists in front of the body with the thumbs pointing outward each otherC Clasp hands in front of you bodyD Extend arm with the thumb pointing up, and flex the finger s in and out for as long as the load movement is desired

考题 单选题The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().A maximum counter weight requiredB minimum horsepower requiredC hoist rope strengthD allowable load

考题 单选题()is not a static load.A Actual weight of the ship's structure,outfitting,equipment and machineryB Ballast load(weight)C Cargo loadD Slamming and sloshing load

考题 单选题In a general cargo crane, () is fitted to lift the cargo load.A the slewing motorB the luffing motorC the hoisting motorD none of the above

考题 单选题What does “evel-luffing” accomplish during crane operations().A It prevents the load from swinging when the boom level is adjustedB Less power is needed when topping the boom with a load on the hookC It maintains the height of the load above the deckD All of the above

考题 单选题A disk with a horizontal line through its center,equivalent to the summer load line,is called the().A deadrise markB maximum allowable draft markC plimsoll markD tonnage mark

考题 单选题On a ship crane,the load chart relates the allowable load to the combination of boom length and().A boom angleB boom strengthC load radiusD cable strength