网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
When configuring a dual port gigabit Integrated Virtual Ethernet adapter (IVE), what value must be assigned to Multiple Core Scaling (MCS) to enable 8 logical ports in total? ()
A
2
B
4
C
8
D
16
参考答案
参考解析
解析:
暂无解析
更多 “单选题When configuring a dual port gigabit Integrated Virtual Ethernet adapter (IVE), what value must be assigned to Multiple Core Scaling (MCS) to enable 8 logical ports in total? ()A 2B 4C 8D 16” 相关考题
考题
A virtual port channel (vPC) allows links that are physically connected to two different Cisco Nexus devices to appear as a single port channel to a third device. Which are the mandatory steps for configuring vPC? () A、 Enable feature vPCB、 Define domainsC、 Establish peer keepalive connectivityD、 Create a peer linkE、 Configure the peer link as a trunk portF、 Create port channels and vPCsG、 Define port channel load-balancing methodH、 Make sure configurations are consistent
考题
When configuring Cisco IOS login enhancements for virtual connections, what is the "quiet period"?()A、The period of time in which virtual login attempts are blocked, following repeated failed login attemptsB、The period of time in which virtual logins are blocked as security services fully initializeC、A period of time when no one is attempting tolog inD、The period of time between successive login attempts
考题
Virtual PortChannels (vPCs) allow links that are physically connected to two different Cisco switches to appear to a third downstream device as coming from a single device and as part of a single port channel. Which of the following are components of a Virtual PortChannel system? ()A、 Two peer devices: the vPC peers of which one is primary and one is secondary and are part of a vPC domain.B、 A Layer 3 Gigabit Ethernet link called peer-keepalive link to resolve dual-active scenariosC、 A redundant 10 Gigabit Ethernet PortChannel called a peer link to carry traffic from one system to the other when neededD、 vPC member ports forming the PortChannelE、 A dot1q trunk between the vPC peersF、 A management port that can be used as peer-keepalive link to resolve dual-active scenarios.
考题
Which of the following offers the highest level of redundancy in the design of a storage system?()A、 A Dual Port HBA with a pair of Point-To-Point connections to the SAN.B、 Two Single Port HBAs connected to a fiber switch.C、 A Dual Port HBA with a Point-To-Point connection to a SAN.D、 Two Dual Port HBAs connected to a pair of fiber switches.
考题
Which three connection options are available when configuring a switch port to be part of a privateVLAN? ()(Choose three.)A、isolated modeB、switchport modeC、modular modeD、community modeE、promiscuous modeF、global mode
考题
Which three connection options are available when configuring a switch port to be part of aprivate VLAN? ()(Choose three.)A、is olated modeB、switchport modeC、modular modeD、community modeE、promiscuous modeF、global mode
考题
When configuring port security on a Cisco Catalyst switch port, what is the default action taken by the switch if a violation occurs? ()A、protect (drop packets with unknown source addresses)B、restrict (increment SecurityViolation counter)C、shut down (access or trunk port)D、transition (the access port to a trunking port)
考题
When configuring unified ports on a 5548 switch, which port ordering must be respected?()A、 Fibre Channel ports must be configured from the first port in the module.B、 Ethernet ports must be configured from the last port in the module.C、 Fibre Channel ports must be configured from the last port in the module.D、 Ethernet ports must be configured from the first port in the module.
考题
Which action increases server availability?()A、 configuring a second network card with a different IP addressB、 replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC、 using adapter teaming and configuring the second network card with the same IP address as the first network cardD、 installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
考题
A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()A、1B、7C、15D、31
考题
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)
考题
When configuring a dual port gigabit Integrated Virtual Ethernet adapter (IVE), what value must be assigned to Multiple Core Scaling (MCS) to enable 8 logical ports in total? ()A、2B、4C、8D、16
考题
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
考题
An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE adapter be set to 1. If this change is made, what is the maximum number of logical ports, across both port groups, that the IVE adapter can provide?()A、 4 B、 16 C、 20 D、 32
考题
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
考题
In Windows Server 2012 R2 Hyper-V,which of the following options allows two virtual machines to simultaneously share the same physical RAM?()A、Integrated ServicesB、Dynamic MemoryC、Resource MeteringD、Port MirroringE、Virtual Machine ChimneyF、Router guard
考题
When configuring dual VIO servers to connect to SAN based disk in failover mode, what setting must be applied? ()A、 algorithm = failoverB、 algorithm = round_robinC、 reserve_policy = no_reserveD、 reserve_policy = single_path
考题
Which of the following is a true statement when promiscuous mode is enabled on an Integrated Virtual Ethernet?()A、 The physical port can be used as part of a Shared Ethernet Adapter (SEA).B、 All physical ports on the Host Ethernet Adapter (HEA) default to promiscuous mode.C、 Multiple logical ports can be assigned to a physical port if that logical port is in promiscuous mode.D、 All physical ports that belong to the same port group will be set to promiscuous mode on the Host Ethernet Adapter (HEA).
考题
单选题An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE adapter be set to 1. If this change is made, what is the maximum number of logical ports, across both port groups, that the IVE adapter can provide?()A
4 B
16 C
20 D
32
考题
单选题Which of the following offers the highest level of redundancy in the design of a storage system?()A
A Dual Port HBA with a pair of Point-To-Point connections to the SAN.B
Two Single Port HBAs connected to a fiber switch.C
A Dual Port HBA with a Point-To-Point connection to a SAN.D
Two Dual Port HBAs connected to a pair of fiber switches.
考题
多选题A virtual port channel (vPC) allows links that are physically connected to two different Cisco Nexus devices to appear as a single port channel to a third device. Which are the mandatory steps for configuring vPC? ()AEnable feature vPCBDefine domainsCEstablish peer keepalive connectivityDCreate a peer linkEConfigure the peer link as a trunk portFCreate port channels and vPCsGDefine port channel load-balancing methodHMake sure configurations are consistent
考题
单选题When configuring Cisco IOS login enhancements for virtual connections, what is the "quiet period"?()A
The period of time in which virtual login attempts are blocked, following repeated failed login attemptsB
The period of time in which virtual logins are blocked as security services fully initializeC
A period of time when no one is attempting tolog inD
The period of time between successive login attempts
考题
多选题Virtual PortChannels (vPCs) allow links that are physically connected to two different Cisco switches to appear to a third downstream device as coming from a single device and as part of a single port channel. Which of the following are components of a Virtual PortChannel system? ()ATwo peer devices: the vPC peers of which one is primary and one is secondary and are part of a vPC domain.BA Layer 3 Gigabit Ethernet link called peer-keepalive link to resolve dual-active scenariosCA redundant 10 Gigabit Ethernet PortChannel called a peer link to carry traffic from one system to the other when neededDvPC member ports forming the PortChannelEA dot1q trunk between the vPC peersFA management port that can be used as peer-keepalive link to resolve dual-active scenarios.
考题
单选题Which action increases server availability?()A
configuring a second network card with a different IP addressB
replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC
using adapter teaming and configuring the second network card with the same IP address as the first network cardD
installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
考题
多选题Which three connection options are available when configuring a switch port to be part of a privateVLAN? ()(Choose three.)Aisolated modeBswitchport modeCmodular modeDcommunity modeEpromiscuous modeFglobal mode
考题
单选题When configuring dual VIO servers to connect to SAN based disk in failover mode, what setting must be applied? ()A
algorithm = failoverB
algorithm = round_robinC
reserve_policy = no_reserveD
reserve_policy = single_path
考题
多选题Which two of the following statements describe a routed switch port on a multilayer switch?()ALayer 2 switching and Layer 3 routing are mutually supported.BThe port will not be associated with any VLAN.CThe routed switch port supports VLAN subinterfaces.DThe routed switch port is used when a switch has only one port per VLAN or subnet.EThe routed switch port ensures that STP remains in the forwarding state.
热门标签
最新试卷