网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
If the hatch cover does not move, ()should be checked.
A

the open valve

B

the stop valve

C

the steam valve

D

the close valve


参考答案

参考解析
解析: 暂无解析
更多 “单选题If the hatch cover does not move, ()should be checked.A the open valveB the stop valveC the steam valveD the close valve” 相关考题
考题 58. Which is the correct way to act in an earthquake?A. Run downstairs and cover your head and neck with your arms.B. Drive your car quickly through the overpass and get out of it.C. When you stay under a strong piece of furniture, you should hold on to it and be prepared to move with it.D. Climb over the back of the seat and cover your head and neck with your arms.

考题 (b) Draft a report as at today’s date advising Cutlass Inc on its proposed activities. The report should cover thefollowing issues:(i) The rate at which the profits of Cutlass Inc will be taxed. This section of the report should explain:– the company’s residency position and what Ben and Amy would have to do in order for the companyto be regarded as resident in the UK under the double tax treaty;– the meaning of the term ‘permanent establishment’ and the implications of Cutlass Inc having apermanent establishment in Sharpenia;– the rate at which the profits of Cutlass Inc will be taxed on the assumption that it is resident in theUK under the double tax treaty and either does or does not have a permanent establishment inSharpenia. (9 marks)

考题 Does the supplier of material ____ all kinds of risks for transportation ____ sea? A. take;on B. cover;by C. receive;by D. overtake;at

考题 According to New Standard, the learning objectives should try to cover( ) areas. A、 three B、 four C、 five D、 six

考题 很多船上在每个舱口处都有两个吊杆及两台起货机。()A、Many ships have two derricks at each hatch.B、Many ships have two winches at each hatch.C、Many ships have two derricks and two winches at each hatch.D、Many ships have two derricks and two winches at each hatch cover.

考题 为了避免震动,用低速控制钮减低移动舱盖的速度。()A、To avoid shock, reduce the speed of moving hatch cover by inching control.B、To avoid shock, reduce the speed of moving hatch cover by control levers.C、To avoid shock, reduce the position of moving hatch cover by inching control.D、To avoid shock, reduce the course of moving hatch cover by control levers.

考题 If the hatch cover does not move, ()should be checked.A、the open valveB、the stop valveC、the steam valveD、the close valve

考题 This is a()(侧滚动)type hatch cover.A、foldingB、rollingC、side-rollingD、unfolding

考题 If there is a fire in a hold, what should you do?()A、Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B、Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C、Close the hatch, accesses and ventilators at once. Flood water into hold.D、Open the hatch, accesses and ventilators at once. Flood water into hold.

考题 ()the track of hatch cover, please.A、CleanedB、CleanC、To cleanD、Cleaning

考题 You should release the ()(重型螺栓)on top of the cover.A、lock inB、heavy boltC、socketD、heavy cleat

考题 The()(自动舱盖) is operated by electric or hydraulic power.A、automatic hatch coverB、folding type coverC、hatch coamingD、side-rolling type cover

考题 FPA provides a more limited cover than WA, since it does not include()losses and damages.A、totalB、intentionalC、partialD、accidental

考题 If an external monitor is attached to a laptop and it does not work, which of the following actions should a technician take FIRST?()A、Re-install the operating system.B、Open and close the cover.C、Use the function key to activate the monitor.D、Install new software for the keyboard.

考题 Your company has an Active Directory forest. Not all domain controllers in the forest are configured as Global Catalog Servers. Your domain structure contains one root domain and one child domain. You modify the folder permissions on a file server that is in the child domain. You discover that some Access Control entries start with S-1-5-21 and that no account name is listed. You need to list the account names. What should you do?()A、Move the RID master role in the child domain to a domain controller that holds the Global CatalogB、Modify the schema to enable replication of the friendlynames attribute to the Global Catalog.C、Move the RID master role in the child domain to a domain controller that does not hold the Global Catalog.D、Move the infrastructure master role in the child domain to a domain controller that does not hold the Global Catalog

考题 单选题为了避免震动,用低速控制钮减低移动舱盖的速度。()A To avoid shock, reduce the speed of moving hatch cover by inching control.B To avoid shock, reduce the speed of moving hatch cover by control levers.C To avoid shock, reduce the position of moving hatch cover by inching control.D To avoid shock, reduce the course of moving hatch cover by control levers.

考题 单选题hatch cover()A 舱口B 舱盖C 舱壁D 密封舱

考题 单选题The()(自动舱盖) is operated by electric or hydraulic power.A automatic hatch coverB folding type coverC hatch coamingD side-rolling type cover

考题 单选题The damage to the hatch cover was caused by your stevedores,and you ought to have known we never()lies.A sayB talkC tellD speak

考题 单选题Are you testing the()(液压舱盖)?A hydraulic hatch coverB hydraulic release unitC hydraulic oil jackD automatic hatch cover

考题 单选题This is a()(侧滚动)type hatch cover.A foldingB rollingC side-rollingD unfolding

考题 单选题Something has gone ()with the hatch cover.A rightB badC wrongD well

考题 单选题In order to inspect both piston and cylinder wall thoroughly, the cylinder cover should be taken off and the piston should be ().A craned outB rolled outC lifted outD turned out

考题 单选题The()(侧滚式舱盖) runs along the guide rail.A rolling type hatch coverB side-rolling hatch coverC folding type hatch coverD automatic hatch cover

考题 单选题每一个舱盖由两个或更多的盖板组成。()A Each hatch consists of two panels.B Each hatch cover consists of two panels.C Each hatch consists of two or more panels.D Each hatch cover consists of two or more panels.

考题 单选题The()(折叠式舱盖) can fold slowly.A rolling type hatch coverB side-rolling hatch coverC folding type hatch coverD automatic hatch cover

考题 单选题If an external monitor is attached to a laptop and it does not work, which of the following actions should a technician take FIRST?()A Re-install the operating system.B Open and close the cover.C Use the function key to activate the monitor.D Install new software for the keyboard.