网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The running wheel runs along ()on top of the hatch coaming.
A
the guide rail
B
the guide rope
C
the side coaming
D
the guide roller
参考答案
参考解析
解析:
暂无解析
更多 “单选题The running wheel runs along ()on top of the hatch coaming.A the guide railB the guide ropeC the side coamingD the guide roller” 相关考题
考题
()our food (), we had to walk to a village for help.
A、Since; runs outB、Because; run outC、With; running ourD、For; running out
考题
______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed
考题
What prevents water running along the shaft of a leaking centrifugal pump from entering the shaft bearing ________.A.Shaft sealB.Water flingerC.Drain holeD.Lantern ring
考题
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
考题
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
考题
The running wheel runs along ()on top of the hatch coaming.A、the guide railB、the guide ropeC、the side coamingD、the guide roller
考题
If you click the Configure button along the top of Cisco SDM is graphical interface,which Tasks buttonpermits you to configure such features as SSH, NTP, SNMP, and syslog?()A、Interfaces and ConnectionsB、Intrusion PreventionC、Security AuditD、Additional Tasks
考题
单选题请把吊杆甩到舱口上方好吗?()A
Will you please swing the heavy derrick over the hatch?B
Will you please swing the derrick over the hatch?C
Will you please lower the derrick over the hatch?D
Will you please top the heavy derrick over the hatch?
考题
单选题Tell me(),please.A
which hatch will be loaded firstB
will which hatch be loaded firstC
will hatch of which be loaded firstD
first will which hatch be loaded
考题
单选题Your company has a server that runs Windows Server 2008 R2. The server runs an instance of Active Directory Lightweight Directory Services (AD LDS). You need to replicate the AD LDS instance on a test computer that is located on the network. What should you do()A
Run the repadmin /kcc command on the test computer.B
Create a naming context by running the Dsmgmt command on the test computer.C
Create a new directory partition by running the Dsmgmt command on the test computer.D
Create and install a replica by running the AD LDS Setup wizard on the test computer.
考题
单选题我船配有自动舱盖。()A
Our ship is equipped with automatic hatch covers.B
Our ship is equipped with folding-type hatch covers.C
Our ship is equipped with side-rolling hatch covers.D
Our ship is equipped with rolling-type hatch covers.
考题
单选题A vessel has an amidships superstructure. Which location would be most suitable for ondeck stowage of automobiles?().A
On top of No.1 hatchB
Beside the hatches, forward of the midships houseC
On top of the hatch immediately forward of the midships houseD
On top of the hatch immediately aft of the midships house
考题
单选题Tonnage openings must be closed by means of().A
Press boardB
Steel hatch boardsC
Steel platesD
Wooden hatch boards
考题
单选题The()(侧滚式舱盖) runs along the guide rail.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题A vessel has an amidships superstructure. Which location would be most suitable for on-deck stowage of automobiles?().A
On top of No.1 hatchB
Beside the hatches,forward of the midships houseC
On top of the hatch immediately forward of the midships houseD
On top of the hatch immediately aft of the midships house
考题
单选题()is the main center-line structural member,running fore and aft along the bottom of a ship,sometimes referred to as the backbone.A
FrameB
DeckbeamC
StringerD
Keel
考题
单选题How could lashing gear used aboard Ro-Ro vessels be stowed when not in use?()A
Drape along bracketsB
Hang vertically in a sheltered areaC
Stow in bins at hatch coming sideD
All of the above
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题每一个舱盖由两个或更多的盖板组成。()A
Each hatch consists of two panels.B
Each hatch cover consists of two panels.C
Each hatch consists of two or more panels.D
Each hatch cover consists of two or more panels.
考题
单选题()is known as a long hatch during loading operation.A
The largest hatch of a shipB
The hatch that is double riggedC
The hatch where a disproportionate amount of cargo is atowedD
The hatch where the most cargo is stowed
考题
单选题All the rings are slightly rounded on their external top and bottom edges to keep the oil film on the cylinder liner during () for new piston rings.A
the running-in periodB
the running processC
gas exchange processD
the boiler firing
考题
单选题The running wheel runs along the ()(导轨)on the hatch coaming top.A
guide ropeB
guide railC
side coamingD
side roller
考题
单选题You have a computer that runs Windows 7. You need to prevent ActiveX controls from running in WindowsInternet Explorer. Which Internet Explorer settings should you modify?()A
ContentB
EncodingC
SafetyD
Security
考题
单选题The()(折叠式舱盖) can fold slowly.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题In order to keep the oil film on the cylinder liner during the running-in period, the piston rings are slightly rounded()A
on both the external and internal top edgesB
on both the external top and bottom edgesC
on both the external and internal bottom edgesD
on all the four edges
考题
单选题A piston is said to be at top dead center when it is ()A
opening the exhaust portsB
placed on top of the engine along its centerlineC
farthest from the cylinder headD
nearest to the cylinder head
热门标签
最新试卷