网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
______ is known as a long hatch during loading operation.
A.The largest hatch of a ship
B.The hatch that is double rigged
C.The hatch where a disproportionate amount of cargo is stowed
D.The hatch where the most cargo is stowed
参考答案
更多 “ ______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed ” 相关考题
考题
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to ______.A.remove an existing list that would slow down cargo operationsB.initiate loading in conjunction with unloading at the hatchC.improve stability during cargo operationsD.allow longshoremen easy access to the hatch
考题
WHEN CONTACT MADE WITH THE RADIO STATION OAS AT SAN JUAN,A PRE-STOWAGE HATCH LIST WITH SEQUENCE OF LOADING TO BE SENT TO LOAD PORT NOT LESS THAN 48 HRS IN ADVANCE.From this fax,the pre-stowage hatch list shall be sent to ______.A.THE RADIO STATIONB.SAN JUANC.OASD.LOAD PORT
考题
When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ______.A.Provide the proper trimB.Prevent negative stability from developingC.Prevent excessive longitudinal stressesD.Control list
考题
Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall
考题
Tonnage openings must be closed by means of ______.A.Press boardB.Steel hatch boardsC.Steel platesD.Wooden hatch boards
考题
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
考题
很多船上在每个舱口处都有两个吊杆及两台起货机。()A、Many ships have two derricks at each hatch.B、Many ships have two winches at each hatch.C、Many ships have two derricks and two winches at each hatch.D、Many ships have two derricks and two winches at each hatch cover.
考题
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
考题
为了避免震动,用低速控制钮减低移动舱盖的速度。()A、To avoid shock, reduce the speed of moving hatch cover by inching control.B、To avoid shock, reduce the speed of moving hatch cover by control levers.C、To avoid shock, reduce the position of moving hatch cover by inching control.D、To avoid shock, reduce the course of moving hatch cover by control levers.
考题
If there is a fire in a hold, what should you do?()A、Close the hatch, accesses and ventilators at once. Flood CO2 into hold.B、Open the hatch, accesses and ventilators at once. Flood CO2 into hold.C、Close the hatch, accesses and ventilators at once. Flood water into hold.D、Open the hatch, accesses and ventilators at once. Flood water into hold.
考题
The()(自动舱盖) is operated by electric or hydraulic power.A、automatic hatch coverB、folding type coverC、hatch coamingD、side-rolling type cover
考题
单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().A
remove an existing list that would slow down cargo operationsB
initiate loading in conjunction with unloading at the hatchC
improve stability during cargo operationsD
allow longshoremen easy access to the hatch
考题
单选题请把吊杆甩到舱口上方好吗?()A
Will you please swing the heavy derrick over the hatch?B
Will you please swing the derrick over the hatch?C
Will you please lower the derrick over the hatch?D
Will you please top the heavy derrick over the hatch?
考题
单选题The damage to the hatch cover was caused by your stevedores,and you ought to have known we never()lies.A
sayB
talkC
tellD
speak
考题
单选题Tell me(),please.A
which hatch will be loaded firstB
will which hatch be loaded firstC
will hatch of which be loaded firstD
first will which hatch be loaded
考题
单选题我船配有自动舱盖。()A
Our ship is equipped with automatic hatch covers.B
Our ship is equipped with folding-type hatch covers.C
Our ship is equipped with side-rolling hatch covers.D
Our ship is equipped with rolling-type hatch covers.
考题
单选题Are you testing the()(液压舱盖)?A
hydraulic hatch coverB
hydraulic release unitC
hydraulic oil jackD
automatic hatch cover
考题
单选题Tonnage openings must be closed by means of().A
Press boardB
Steel hatch boardsC
Steel platesD
Wooden hatch boards
考题
单选题The()(侧滚式舱盖) runs along the guide rail.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题每一个舱盖由两个或更多的盖板组成。()A
Each hatch consists of two panels.B
Each hatch cover consists of two panels.C
Each hatch consists of two or more panels.D
Each hatch cover consists of two or more panels.
考题
单选题()is known as a long hatch during loading operation.A
The largest hatch of a shipB
The hatch that is double riggedC
The hatch where a disproportionate amount of cargo is atowedD
The hatch where the most cargo is stowed
考题
单选题The()(折叠式舱盖) can fold slowly.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题Bonding cables are used during cargo transfer to().A
provide safe electrical power connection to barge equipmentB
keep the vessel from surging excessivelyC
prevent an accidental discharge of static electricityD
secure the cargo hose to a hatch when loading overall
考题
单选题When loading a cargo of taconite,proper sequencing of loading by hatch number is necessary to ().A
provide the proper trimB
prevent negative stability from developingC
prevent excessive longitudinal stressesD
control list
考题
单选题You can hardly complete the loading at No.2 hatch,()you?A
can'tB
canC
willD
won't
热门标签
最新试卷