网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()
A
rg1 is configured with a delayed fallback timer
B
Settling time policy has not been configured for rg1
C
Node1 does not have sufficient resources to support rg1
D
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A rg1 is configured with a delayed fallback timerB Settling time policy has not been configured for rg1C Node1 does not have sufficient resources to support rg1D Node2 is the first in the ’Default Node Priority’ list for resource group rg1” 相关考题
考题
A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A、rg1 is configured with a delayed fallback timerB、Settling time policy has not been configured for rg1C、Node1 does not have sufficient resources to support rg1D、Node2 is the first in the ’Default Node Priority’ list for resource group rg1
考题
Company.com has a three-node cluster (Node ’A’, Node ’B’, and Node ’C’) with three resource Groups (rg1, rg2, and rg3). Node ’A’ has twice as many CPUs and twice as much memory as the two test add development Nodes ’B’ and ’C’. During normal production processing, all resource groups are active on Node ’A’. What is most efficient way to configure the cluster to manage the workload?() A、 Use thee cascading resource groups where ’rg1’ and ’rg2’ fallover to Node ’B’ and ’rg3’ falls over to Node ’C’B、 Use Dynamic Node Priority resource groups with a priority chain consisting of Node ’A’ then Node ’B’ then Node ’C’C、 Use three rotating resource groups with ’rg1’ and ’rg2’ falling over to node ’B’ and ’rg3’ falling over to Node ’C’D、 Upgrade Nodes ’B’ and ’C’ to be equal to Node ’A in CPU and memory resources to enable the cluster to synchronize three resource groups
考题
Company.com has a six-node concurrent resource group with an application that is accessed by a web connection to the cluster nodes. How is the workload moved to another cluster node during a node failure?() A、 The concurrent application must control the web interface through application monitoring.B、 A second resource group will be required to move the web application and IP label to a new node during a node failure.C、 The concurrent resource group can support multiple IP labels through IP aliasing so all IP labels are defined in the concurrent resource group.D、 The dynamic node priority facility in HACMP will relocate the web application and the IP label,if it is correctly defined in the application start and stop script.
考题
The IP subsystem fallover behavior of a two-node cluster is being testing in a large client organization. One of the tests is to simulate a network_down event and verify that HACMP movesthe single resource group to the standby node. What is the best way to simulate a network down condition?() A、 Turn off the IP core switch connecting the two nodes.B、 Issue the command "stopsrc -g inetd" on the node that has the resource group.C、 Issue the command "sh /etc/rc.tcpclean" on the node that has the resource group.D、 Simultaneously unplug all network cables from the node that has the resource group.
考题
An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()A、RG1 is Online RG2 is OnlineB、RG1 is Online RG2 is OfflineC、RG1 is Offline RG2 is OnlineD、RG1 is Offline RG2 is Offline
考题
Company.com has a three-node cluster with six resource groups. There are two resource groups for each node. A new hardware component will be added to one of the nodes. The customer wants to move the resource groups to other nodes,but not necessarily in the normal fallover order. Also,the resource groups must be moved at night when there is no one in the computer center. What can be done so that the resource group is moved at the most convenient normal fallover order. Also,the resource groups must be moved at night when there is no one in the computer center. What can be done so that the resource group is moved at the most convenient time for the customer?() A、 Create a custom resource group with a custom fallback timer to cause the system shutdown at he appropriate time.B、 Set the system to stop with "shutdown" command at the appropriate time and allow HACMP to relocate the resources.C、 Use a script that calls the cIRGmove command and place it in the cron or a queue to execute at the appropriate time.D、 Change the existing resource groups to a custom type and add a timer to perform a "shutdown -h" command at the appropriate time.
考题
A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?() A、 The resource group DNP has been configured.B、 The resource group option CWOF has been enabled.C、 The resource group option Inactive Takeover is set.D、 A resource group fallback timer has been configured.
考题
An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()A、The operating system crashedB、A disk failure forced a volume group off lineC、The System Resource Controller executed a system haltD、The topology services daemon has crashed due to an ODM mismatch
考题
A resource group, MY_APP, has the following configuration: Resource Group NameMY_APP Participating Node Name(s)Alpha Beta GammaStartup Policy Online On Home Node Only Fallover Policy Fallover To Next Priority Node In The List Fallback Policy Fallback To Higher Priority Node InThe List MY_APP is currently running on node Beta. MY_APP is then moved to node Gamma using C-SPOC.Nodes Alpha and Beta are shutdown and restarted. Node Alpha stabilizes approx 60 seconds before nodeBeta. What happens to the resource group, MY_APP, when nodes Alpha and Beta are restarted?()A、It moves to BetaB、It stays on GammaC、It moves to AlphaD、It moves to Alpha, then to Beta
考题
An enterprise has three nodes: -Node ’A’ is a production database, -Node ’B’ is a production Application server, and -Node ’C’ is a test and development node. Node ’C’ is used by six programmers to develop and the production application as business critical and would like to make it highly available with HACMP. Application development and testing is not business critical. Which of the following describes the best solution?() A、 There is not an adequate solution because HACMP should not be configured in this environment without a dedicated standby node.B、 Nodes ’A’ and ’B’ should be configured in a cluster with mutual fallover of two cascading resource groups to provide both nodes will deliver acceptable response time with both resource groups.C、 Nodes ’A’ and ’C’ should be configured in one cluster, and Nodes ’B’ and ’C’ in another cluster to prevent both the database and application server from falling over to Node ’C’ at the same time.D、 Nodes ’A’, ’B’, and ’C’ should be configured in a cluster with Node ’C’ the hot standby for both the database and application server resource groups. Workload Manager (WLM) must be configured on database and application developers from over utilizing the CPU resources.
考题
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
考题
An administrator is configuring a PowerHA cluster consisting of two nodes across two physical Power systems,570-1 and 570-2. Node1 is an LPAR on 570-1Node2 is an LPAR on 570-2. Dev1 is an LPAR on 570-2 (this LPAR is not part of the cluster). The cluster will manage a single resource group, RG1, with a single application server, APP1. The resourcegroup will have a home node of Node1. Node1 is configured with 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processorsNode2 isconfigured with 0.4 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors Dev1 is configuredwith 4.0 CPU desired, 0.4 minimum, 4.0 maximum, and 4 virtual processors When the resource group RG1 is acquired by Node2 the administrator would like to dynamically move 3.6processor entitlement units from Dev1 to Node2. How could the administrator achieve this in the PowerHAcluster?()A、Create a custom event script to perform the change to CPU entitlementB、Modify the extended performance tuning parameters for the cluster to modify CPU entitlement uponresource group acquisitionC、Customize the resource group attributes of RG1 so that the CPU entitlement is modified for Node2 uponresource group acquisitionD、Customize the application server attributes of APP1 so that the CPU entitlement is modified for Node2upon resource group acquisition
考题
An HACMP cluster has three nodes of unequal size. The largest node is Node ’A’. The primary application on Node ’A’ has two components. One component is memory intensive, the other is IO intensive. Nodes ’B’ and ’C’ are running web servers and databases that access information produced by applications on Node ’A’. The customer requires the most performance from the primary application and wants all nodes available for fallover processing. Which of the following is the best solution for meeting the customer requirements?() A、 Use nodes of equal size.B、 Create multiple resource groups and use loadlever.C、 Use dynamic node priority to manage resource groups.D、 Use an ordered list to manage resource group fallover.
考题
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?() A、 Change the cluster to a rotating design.B、 Change the Cascading without Fallback flag to true.C、 Change the Inactive Takeover field to false in the cluster configuration.D、 Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
考题
单选题An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()A
Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00B
Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00C
Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1D
Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
考题
单选题An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()A
RG1 is Online RG2 is OnlineB
RG1 is Online RG2 is OfflineC
RG1 is Offline RG2 is OnlineD
RG1 is Offline RG2 is Offline
考题
单选题A new administrator is performing fallover testing on a two-node cluster and is concerned that the cascading resource group belonging to Node ’A’ did not reintegrate properly after the cluster was restarted on Node ’A’. A stable cluster is reported by clstat,and clRGinfo reports the resource group online on Node ’B’. What type of configuration would cause this type of behavior?()A
The resource group DNP has been configured.B
The resource group option CWOF has been enabled.C
The resource group option Inactive Takeover is set.D
A resource group fallback timer has been configured.
考题
单选题An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()A
Configure the resource group with a fallback policy of Fallback to Higher Priority Node Restart Node1 at20:00B
Configure the resource group with a fallback policy of Never Fallback Manually move the resource groupfrom Node2 to Node1 at 20:00C
Configure the resource group with a fallback policy of Fallback To Higher Priority Node Create aDelayed Fallback Timer policy to meet the requirements Allocate this delayed timer policy to theresource group RG1D
Configure the resource group with a fallback policy of Never Fallback Create a Delayed Fallback Timerpolicy to meet the requirement Specify this delayed timer policy as a Fallback Override to the resourcegroup RG1
考题
单选题An administrator has configured a two node cluster, Node1 and Node2 with two resource groups, RG1 andRG2. The resource groups are configured as follows: RG1: Participating Nodes: Node1, Node2 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy Never Fallback RG2: Participating Nodes: Node2, Node1 Startup Policy: Online On Home Node Only Fallover Policy: Fallover To Next Priority Node In The List Fallback Policy: Fallback To Higher Priority NodeIn The List An Online on Different Nodes Dependency has been configured as:High Priority Resource Groups: RG2 Intermediate Priority Resource Group: RG1 The cluster has been running without any problems with both resource groups on their home nodes whenNode1 suffers a critical operating system problem causing the node to halt.What is the status of the resource groups?()()A
RG1 is Online RG2 is OnlineB
RG1 is Online RG2 is OfflineC
RG1 is Offline RG2 is OnlineD
RG1 is Offline RG2 is Offline
考题
单选题A node in a three-node cluster was started, ad it acquired the following three cascading resourcegroups: ’rg1’, ’rg12’, and ’rg3’. The cluster design is to have ’rg1’ normally Node ’A’, ’rg2’ normally on Node ’B’, and rg3’ normally on Node ’C’. How can the administrator reposition the resource groups and correct the problem?()A
Change the cluster resource group definitions from cascading to rotating,synchronize the cluster,and restart HACMPB
Edit the /urs/es/sbin/utilities/clhosts file to reflect he desired node-to-resource group relationships and restart HACMPC
Use the clRGMove utility move rg2 o Node ’B’ and rg3 to Node ’C’,then start the cluster manager on Nodes ’B’ and ’C’ with the clstart utilityD
Disable Inactive Node Takeover,check the node priority list in the resource groups definitions,synchronize the cluster,and start HACMP on Nodes ’B’ and ’C’
考题
单选题You have a server that runs Windows Server 2008 Enterprise Edition. The server has the FailoverClustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster hasa dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 isunable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functionswithout errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()A
Remove the MSDTC resource from Group1B
Select NODE3 as a preferred owner for Group1C
Remove NODE3 as a possible owner from all cluster resources in Group1D
Onfigure NODE3 as a possible owner for all cluster resources in Group1
考题
单选题You have a server that runs Windows Server 2008 Enterprise Edition. The server has the Failover Clustering feature installed. The server has three nodes named NODE1, NODE2, and NODE3. The Microsoft Distributed Transaction Coordinator (MSDTC) resource is installed on the cluster. The cluster has a dedicated cluster group named Group1 that includes the MSDTC resource. You discover that Group1 is unable to failover to NODE3 from NODE1 or NODE2. The failover from NODE1 to NODE2 functions without errors. You need to configure Group1 to support the failover between all cluster nodes. What should you do?()A
Remove the MSDTC resource from Group1.B
Select NODE3 as a preferred owner for Group1.C
Remove NODE3 as a possible owner from all cluster resources in Group1.D
Configure NODE3 as a possible owner for all cluster resources in Group1.
考题
单选题Company.com has a three-node cluster (Node ’A’, Node ’B’, and Node ’C’) with three resource Groups (rg1, rg2, and rg3). Node ’A’ has twice as many CPUs and twice as much memory as the two test add development Nodes ’B’ and ’C’. During normal production processing, all resource groups are active on Node ’A’. What is most efficient way to configure the cluster to manage the workload?()A
Use thee cascading resource groups where ’rg1’ and ’rg2’ fallover to Node ’B’ and ’rg3’ falls over to Node ’C’B
Use Dynamic Node Priority resource groups with a priority chain consisting of Node ’A’ then Node ’B’ then Node ’C’C
Use three rotating resource groups with ’rg1’ and ’rg2’ falling over to node ’B’ and ’rg3’ falling over to Node ’C’D
Upgrade Nodes ’B’ and ’C’ to be equal to Node ’A in CPU and memory resources to enable the cluster to synchronize three resource groups
考题
单选题The IP subsystem fallover behavior of a two-node cluster is being testing in a large client organization. One of the tests is to simulate a network_down event and verify that HACMP movesthe single resource group to the standby node. What is the best way to simulate a network down condition?()A
Turn off the IP core switch connecting the two nodes.B
Issue the command stopsrc -g inetd on the node that has the resource group.C
Issue the command sh /etc/rc.tcpclean on the node that has the resource group.D
Simultaneously unplug all network cables from the node that has the resource group.
考题
单选题The en0 interface on Node1 of a two-node cluster has failed. This adapter is configured with a boot addressand under stable operations also has the service address of the cluster’s single resource group. The resourcegroup is configured with the fallback option. The HA network was configured for IPAT via aliasing and now theservice address is on the en1 interface in the cluster. The en0 interface has already been physically replacedand configured with the boot address. Which of the following will return the cluster to its original state andminimize cluster downtime?()A
Run cluster synchronization.B
Restart cluster services on Node1.C
Perform a swap_adapter using C-SPOCD
Restart cluster services on both nodes
考题
单选题Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()A
Change the cluster to a rotating design.B
Change the Cascading without Fallback flag to true.C
Change the Inactive Takeover field to false in the cluster configuration.D
Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
考题
单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A
rg1 is configured with a delayed fallback timerB
Settling time policy has not been configured for rg1C
Node1 does not have sufficient resources to support rg1D
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
考题
单选题An administrator is notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 has been powered off. Upon restarting Node1 the administrator checks the AIXerror log and the cluster.log Which of the following is the most likely cause of the failure of Node1?()A
The operating system crashedB
A disk failure forced a volume group off lineC
The System Resource Controller executed a system haltD
The topology services daemon has crashed due to an ODM mismatch
热门标签
最新试卷