网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A short splice in a line().
A

decreases the size of the line

B

should be used if the line is going through a block

C

should only be used in wire rope

D

doubles the size of the line


参考答案

参考解析
解析: 暂无解析
更多 “单选题A short splice in a line().A decreases the size of the lineB should be used if the line is going through a blockC should only be used in wire ropeD doubles the size of the line” 相关考题
考题 The best method of protecting that portion of a fiber anchor line nearest the anchor from chafing on the bottom is by ______.A.using a small scope ratioB.replacing that portion with a short length of chainC.using a hockle to keep that portion of the anchor line off the bottomD.using a synthetic line

考题 Many people are struggling at the ______ line, short of food and shelter.A、povertyB、poorC、hungerD、hungry

考题 Areas enclosed by a long and short dashed magenta line indicate ______.A.cable areasB.dumping groundsC.fish trap areasD.precautionary areas

考题 If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.A.when the line pull reaches the rated winch capacityB.after the line pull exceeds the rated winch capacityC.after a short build-up of torqueD.immediately

考题 A whipping on a fiber line ______.A.keeps the ends from frayingB.strengthens itC.protects your handsD.becomes part of a splice

考题 Each line has a large eye splice().A、in the endB、on the endC、at the endD、to the end

考题 Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .A、bitB、guardC、quayD、bollard

考题 JavaScript中splice方法可以截取数组。()

考题 public class returnIt (    returnType methodA(byte x, double y) (   return (short) x/y * 2;   )  )   What is the valid returnType for methodA in line 2?()A、 IntB、 ByteC、 LongD、 ShortE、 FloatF、 Double

考题 单选题You need to make a fixed loop at the end of a line in order to use the line as a mooring line. You have insufficient time to make a splice. Which knot should you use?().A Clove hitchB Fisherman's bendC BowlineD Round-turn and two half hitches

考题 单选题A long splice in a line().A is used in running riggingB doubles the size of the lineC is only used on fiber ropeD is very weak

考题 单选题Each line has a large eye splice().A in the endB on the endC at the endD to the end

考题 单选题The short-long dashed magenta line around Gardiners Island marks().A A regulated anchorageB Fish trap areasC An area closed to the publicD Underwater cables

考题 单选题To prevent vibration damage to the fuel supply line of a diesel engine, you may use ().A a short length of heavy duty clear plastic tubingB a length of approved flexible nonmetallic hoseC welded flange connections for all jointsD aluminum piping with expansion loops

考题 单选题public class returnIt (    returnType methodA(byte x, double y) (   return (short) x/y * 2;   )  )   What is the valid returnType for methodA in line 2?()A  IntB  ByteC  LongD  ShortE  FloatF  Double

考题 单选题Areas enclosed by a long and short dashed magenta line indicate ().A cable areasB dumping groundsC fish trap areasD precautionary areas

考题 单选题A splice that can be used in running rigging,where the line will pass through blocks,is a().A short spliceB long spliceC back spliceD spindle splice

考题 单选题A “stopper” is().A a short length of line used for temporarily holding another lineB a snatch block for handling a topping liftC an engine order telegraphD the brake on a cargo winch

考题 单选题A whipping on a fiber line().A keeps the ends from frayingB strengthens itC protects your handsD becomes part of a splice

考题 单选题The best method of protecting that portion of a fiber anchor line nearest the anchor from chafing on the bottom is by().A Using a small scope ratioB Replacing that portion with a short length of chainC Using a hockle to keep that portion of the anchor line off the bottomD Using a synthetic line

考题 单选题A tug is towing three manned barges in line in fog. The first vessel of the tow should sound ().A no fog signalB one short blastC one prolonged and three short blastsD one prolonged,one short,and one prolonged blast

考题 单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().A when the line pull reaches the rated winch capacityB after the line pull exceeds the rated winch capacityC after a short build-up of torqueD immediately

考题 单选题class A {   public byte getNumber () {   return 1;   }   }   class B extends A {   public short getNumber() {   return 2;   }    public static void main (String args) {   B b = new B ();    System.out.printIn(b.getNumber())  }   }   What is the result?()A  Compilation succeeds and 1 is printed.B  Compilation succeeds and 2 is printed.C  An error at line 8 causes compilation to fail.D  An error at line 14 causes compilation to fail.E  Compilation succeeds but an exception is thrown at line 14.

考题 单选题1. class A {  2. public byte file Number ( ) { 3. return l;  4. }  5. }  6.  7. Class B extends A {  8. public short getNumber( ) {  9.  return 2;  10. }  11.  12. public short getNumber( ) {  13. B b = new B( );  14. System.out.printIn(b.getNumber( ));  15. }  16. }   What is the result()?A  Compilation succeeds and l is printed.B  Compilation succeeds and 2 printed.C  An error at line 8 cause compilation to fail.D  An error at line 14 cause complication to fail.E  Complication succeeds but an exception is thrown at line 14.

考题 单选题The cargo is now and()found short during discharging at your port.A thanB thenC when the line pull reaches the breaking strengh of the fallD while

考题 单选题When two lines are spliced together,().A The size of the lines at the splice decreasesB They are stronger than if knotted togetherC The overall strength of each line is increasedD The bitter ends will resist rotting

考题 单选题The splice designed to pass easily through a block is called a(n)().A eye spliceB short spliceC long spliceD block splice