网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The cargo is now and()found short during discharging at your port.
A

than

B

then

C

when the line pull reaches the breaking strengh of the fall

D

while


参考答案

参考解析
解析: 暂无解析
更多 “单选题The cargo is now and()found short during discharging at your port.A thanB thenC when the line pull reaches the breaking strengh of the fallD while” 相关考题
考题 All cargo booms are ready to ________.A.discharging cargoB.be dischargingC.discharge cargoD.be discharged cargo

考题 Who usually adjust the derricks during the loading and discharging?

考题 Ships’ masters are requested to ensure that during their call at this port,all discharging outlets are blocked .A.blockadedB.openedC.closedD.enclosed

考题 Which can be prevented only by segregating two lots of cargo into separate holds?A.Contamination of dry cargo by a wet cargoB.Contamination of a clean cargo by a dirty cargoC.Contamination of a food cargo by an odorous cargoD.Overcarriage,overstowage,and short landing

考题 Tested & inspected the steering systems & other navigational equipments & found them in good condition.L'dg & unl'dg finished.This remark is likely made by the OOW ______.A.at the beginning of his watchB.during his watchC.at the end of his watchD.in his cargo watch on deck

考题 After discharging,the above valves were inspected again and found them in ______ condition.A.detactB.contactC.intactD.contract

考题 Which safety precaution(s)should be observed during crane operations ________.A.Checking for proper lifting from beneath the load during cargo operationsB.Using the proper slings or other lifting devices during cargo operationsC.Relaying communications to port agents on the pier during cargo hoistsD.All of the above

考题 You are berthed at a cargo facility where you have just completed discharging a dangerous cargo from your barge.You must complete topside repairs on the barge involving hot work before sailing.Which statement is TRUE ________.A.You can make repairs with permission of the facility owner since you are empty and the cargo is on the facilityB.The repair area must be inspected by a marine surveyor to ensure that it can be done safelyC.Hot work repairs at such a facility are prohibitedD.The Captain of the Port may give specific approval to make hot work repairs

考题 What should be done after putting down the ramp on a Ro-Ro vessel,prior to loading or discharging cargo ________.A.Turn on red cargo lightB.Turn on ventilation for cargo holdsC.Call out the deck department for all handsD.None of the above

考题 材料:As with the duties of loading and stowing of the carrier under Hague Rules and national statutes incorporating one or other of those Rules,there is a difference of opinion as to whether the carrier may validly delegate its responsibility for discharging the cargo to another party,notably to the consignee.Despite some lower court expressions to the contrary,the more prevalent view is that loading,stowing and discharging are “non-delegable”obligations of the carrier of GOODs by sea.In consequence,while it may be permissible to transfer the responsibility for paying for loading,stowing and discharging to the shipper or consignee(e.g.by inserting an“FIOST”clause in the bill of lading),this or any other clauses which purport to also transfer the liability for fault or negligence in the conduct of these operations from the carrier to cargo are null and void,because they relieve or lessen the carriers obligations otherwise than as permitted by the Act.This position is well-founded,given the fundamental purpose of the Rules and the national statutes of protecting shippers and consignees against the superior bargaining power of carriers.While acceptable in charterparties,which are contracts of private carriage,such clauses are rightly set aside by courts in carriage under bills of lading.问题:According to this passage,“FIOST”clause in the bill of lading is ______.A.not accepted by courtsB.acceptable in courtsC.a non-delegable clause in the bill of ladingD.incorporated in the bill of lading to avoid superior bargaining by the carrier against the receiverThe prevalent view is that ______.A.the carrier may validly delegate its responsibility for discharging the cargo to another partyB.whether the carrier may validly delegate its responsibility for discharging the cargo to another party is still in disputeC.it is not necessary to consider whether the carrier may validly delegate its responsibility for discharging the cargo to another partyD.the carrier may mot validly delegate its responsibility for discharging the cargo to another partyIt can be inferred that the author ______ the opinion that the carrier may validly delegate its responsibility for discharging the cargo to another party.A.supportsB.does not supportC.has not indicated whether he supports or notD.has no interest in discussingIn the eyes of law,an“FIOST”clause in the bill of lading ______.A.does not transfer the responsibility for paying for loading,stowing and discharging to the shipper or consigneeB.has nothing to do with the responsibility of the carrierC.relieves or lessens the carrier's obligations otherwise than as permitted by the ActD.imposes more obligations to the carrier than as permitted by the Act请帮忙给出每个问题的正确答案和分析,谢谢!

考题 Do you require any further assistance? My ship is safe now and no assistance is necessary. This VHF communication generally takes place during ______.A.salvage operationB.cargo dischargingC.bunkeringD.towing operation

考题 Manifest and cargo plan are the two most important shipping papers required for ______.A.discharging planningB.safety inspectionC.entry reportD.provision order

考题 Your shipment of goods has been found short ( ) weight by CIQ. A. out B. onC.in D. with

考题 Your shipment of goods has been found short ( ) weight by CIQ. A. out B. on C. in D. with

考题 You ()use hooks when discharging bagged cargo.A、shouldB、shouldn’tC、mustD、can

考题 单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A allow greater than normal loads to be handled by the gearB act as an inboard guy in the event the inboard guy parts during cargo handlingC assist the outboard guy in supporting stresses during cargo handlingD prevent the inboard guy from parting due to stresses during cargo handling

考题 单选题You are kindly requested to supply the necessary tallymen to do()on board the ship during the discharging of the cargo.A the tallying workB the lashing workC the clean workD the work of opening and closing hatches

考题 单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A 150 millimeters of water pressureB 125 millimeters of water pressureC 100 millimeters of water pressureD 75 millimeters of water pressure

考题 单选题Which can be prevented only by segregating two lots of cargo into separate holds? ()A Contamination of dry cargo by a wet cargoB Contamination of a clean cargo by a dirty cargoC Contamination of a food cargo by an odorous cargoD Overcarriage,overstowage,and short landing

考题 单选题The ship will be responsible for the cargo loaded or unloaded().A only when the cargo is within its railB during the time when loading or ynloading is going onC after the cargo is checked by tallymenD as soon as loading or discharging begins

考题 单选题The stowage factor for a cargo is based upon().A one short tonB one short metric tonC one long tonD one long metric ton

考题 单选题Please tell your tallymen to()out the marks in the holds during discharging.A pickB chooseC sortD decide

考题 单选题Figure of cargo short-landed in().A disputeB argueC debateD discuss

考题 单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A 5 times the maximum working pressure on the hose during cargo transferB one half the designed working pressureC 4 times the pressure of the cargo pump used for transferringD 5 times the minimum working pressure on the hose during cargo transfer

考题 单选题Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()A Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holdsB Turn on ventilation for cargo holds,raise/open the stern door,lower the stern rampC Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern doorD Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds

考题 单选题Ships’ masters are requested to ensure that during their call at this port , all discharging outlets are().A blockadedB openedC closedD enclosed

考题 单选题我们正在装危险货。()A We are loading flammable cargo.B We are loading dangerous cargo.C We are discharging flammable cargo.D We are discharging dangerous cargo.