网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Two mooring lines may be placed on the same bollard and either one cast off first if().
A

the eye of the second line is dipped

B

the mooring lines are doubled

C

the bollard has two horns

D

one of the lines is a breast line


参考答案

参考解析
解析: 暂无解析
更多 “单选题Two mooring lines may be placed on the same bollard and either one cast off first if().A the eye of the second line is dippedB the mooring lines are doubledC the bollard has two hornsD one of the lines is a breast line” 相关考题
考题 The best method for tying two lines of the same size together is by using a ______.A.becket bendB.two bowlinesC.single carrick bendD.square knot

考题 A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ______.A.fixB.running fixC.estimated positionD.dead-reckoning position

考题 A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines

考题 Tensile stress is a result of two forces acting in ______.A.opposite directions on the same line,tending to pull the material apartB.opposite directions on the same line,tending to compress the objectC.opposite directions along parallel linesD.the same direction along parallel lines

考题 If two mooring lines are to be placed on the same bollard,which method is BEST?______.A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB.It makes no difference how the lines are placedC.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch

考题 Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .A、bitB、guardC、quayD、bollard

考题 Would you please ()the mooring lines ?A、adjustedB、adjustingC、adjustD、adjusts

考题 You should (松)()the mooring lines at the same time when the wind is big.A、fastenB、slackC、fastD、slacken

考题 The ()(系泊缆绳)consist of a head line ,two breast lines, two spring lines and a stern line.A、moor linesB、mooring linesC、unmoor linesD、unmooring lines

考题 Each line has a large eye splice at the end. The eye is placed over a ().A、bitB、guardC、quayD、bollard

考题 A ship is made fast to the quayside ()mooring lines.A、byB、toC、withD、for

考题 及时调整缆绳。()A、Adjust the mooring lines on time.B、Adjust the mooring lines in time.C、Adjust the mooring lines quickly.D、Adjust the mooring lines slowly.

考题 单选题During storm conditions on a vessel,the mooring tensions should be adjusted so that().A all mooring lines have a different tensionB the leeward lines have higher tension than the windward linesC the maximum tension of the most heavily loaded line does not exceed the safe working loadD all horizontal tension forces on the windward lines are no greater than the vertical tension forces

考题 单选题Two mooring lines may be placed on the same bollard and either one cast off first if().A the eye of the second line is dippedB the mooring lines are doubledC the bollard has two hornsD one of the lines is a breast line

考题 单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()A The lines may jam and then jump off the gypsyheadB If there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadC The lines' surging may cause the vessel to surgeD The heat generated may cause the lines to temporarily fuse to the gypsyhead

考题 单选题Tensile stress is a result of two forces acting in().A opposite directions on the same line,tending to pull the material apartB opposite directions on the same line,tending to compress the objectC opposite directions along parallel linesD the same direction along parallel lines

考题 单选题A Chinese stopper (two lines) will hold best when you().A fasten the bitter ends to the mooring line with half hitchesB twist the ends together and hold them in the direction of the pullC twist the ends together and hold them in the direction opposite to the pullD twist the ends together and hold them at right angles to the mooring line

考题 单选题A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ().A fixB running fixC estimated positionD dead-reckoning position

考题 单选题You should slack the mooring lines ()when the wind is big.A at the same timeB on timeC in timeD at times

考题 单选题Get ready the mooring machinery, mooring lines and the gangway for ().A loading cargoB arrival in portC departure from portD unloading cargo

考题 单选题You should ()the mooring lines at the same time when the wind is big.A fastenB slackC fastD slacken

考题 单选题If two mooring lines are to be placed on the same bollard,which method is BEST?().A Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB It makes no difference how the lines are placedC Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch

考题 单选题The best method for tying two lines of the same size together is by using a().A becket bendB two bowlinesC single carrick bendD square knot

考题 单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().A more slack in the mooring linesB a strain on the mooring linesC chafing gear on the mooring linesD grease on the mooring lines

考题 单选题Mooring with two bow anchors has which major advantage over anchoring with one bow anchor? ().A The vessel will not reverse direction in a tidal currentB The radius of the vessel's swing will be shortenedC A mooring approach may be made from any directionD The vessel will not swing with a change in wind

考题 单选题Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()A Put one line at the low point and one at the high point of the bollard so they don't touchB Take the eye of the second line up through the eye of the first line before putting the second line on the bollardC Never put two mooring lines on the same bollardD The mooring line forward should be put on the bollard first

考题 单选题The ARPA may swap targets when automatically tracking if two targets().A are tracked on reciprocal bearingsB are tracked at the same rangeC are tracked on the same bearingD pass close together

考题 单选题In a storm,the leeward lines of a ship’s mooring system will().A pull the unit in the same direction that the weather is pushing itB pull the unit in the opposite direction that the weather is pushing itC tend to keep the unit on its original location over the well headD affect the unit's draft and inclination as maximum mooring tensions are reached