Zero stock is the best way for()
- A、lost control
- B、inventory control
- C、storage cost control
- D、warehouse cost control
参考答案
更多 “Zero stock is the best way for() A、lost controlB、inventory controlC、storage cost controlD、warehouse cost control” 相关考题
考题
The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost control, schedule, qualityB.Project objectives, dependencies, plan, cost controlC.Project scope, schedule, staffing, cost controlD.Project scope, quality, schedule, dependenciesE.Project budget, schedule, risk factors, work assignments.
考题
A(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight, storage and loss.A . Inventory control.B . Materials management.C . Procurement.D . All of the above.E . A and C only.
考题
VThe Pareto Principle is a technique used to determine which quality control problems in a particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?A . In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be correctedB . the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems.C . in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D . generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.E . A and D
考题
Standard of purchased material:A Simplifies inventory controlB reduces the risk of obsolescenceC reduces cost of purchasing and storageD All of the above.E A and C only.
考题
105 Standard of purchased material:A. Simplifies inventory controlB. reduces the risk of obsolescenceC. reduces cost of purchasing and storageD. All of the above.E. A and C only
考题
● The Work Breakdown Structure (WBS) is the basis for communicating:A Project scope, cost control, schedule, qualityB Project objectives, dependencies, plan, cost controlC Project scope, schedule, staffing, cost controlD Project scope, quality, schedule, dependenciesE Project budget, schedule, risk factors, work assignments.
考题
The report showed us very clearly how the plane got ________ and crashed in the end.
A.out of controlB.into controlC.under controlD.within control
考题
The crew couldn’t get the fire ________, causing a great loss to the shipA.to controlB.under controlC.in controlD.with control
考题
In the form. of ( ) the output is continuously fed back and compared with the reference input.
A.continuous controlB.discontinuous controlC.discrete-data controlD.sampled-data control
考题
PCRF具备以下哪些功能()。
A、Service Access ControlB、Bearer QoS ControlC、Fair Usage ControlD、Subscriber Location Management
考题
The mode of control employed by an alarm circuit is aA.two position controlB.single speed floating controlC.proportional speed floating controlD.reset control
考题
The meat box temperature control circuit, as used in the ship service refrigeration system, is an example of ______.A.two position controlB.single speed floating controlC.proportional(比例) controlD.reset control
考题
Much of the effort cost control involves analyzing the relationship between the consumption of project funds and the work being accomplished for such expenditures . The key to effective cost control is the management of the approved ( ) .A.Schedule baseline
B.Cost baseline
C.Cost output
D.Cost input
考题
The project management plan defines how the project is executed,monitored and controlled,and closed.It is progressively elaborated by updates,and controlled and approved through the perform integrated( )process.A.Cost control
B.Schedule control
C.Change control
D.Risk control
考题
()is the method to keep the best inventory level and position with the minimum cost to satisfy the demandA、Ware house managementB、Inventory controlC、Stock managementD、Storage management
考题
Generally speaking,logistics can be divided into direct cost and()。A、packing costB、cost of salesC、indirect costD、warehouse cost
考题
()is the method to keep the best inventory level and position with the minimum cost to satisfy the demand. A、warehouse managementB、Inventory controlC、stock managementD、storage management
考题
Zero stock is the best way for()A、cost controlB、inventory controlC、storage cost controlD、warehouse cost control
考题
Which version of a view would you use if you just want a quick, easy view within your XPage?()A、Data Table ControlB、View ControlC、Repeat ControlD、Filter by category View Control
考题
Which of the following is NOT one of the three details you need to fill in on the New Custom Control dialog?()A、Name of the custom controlB、Comments to describe the custom controlC、List of the controls that will make up this custom controlD、Application that will contain the custom control
考题
单选题Zero stock is the best way for()A
cost controlB
inventory controlC
storage cost controlD
warehouse cost control
考题
单选题()is the method to keep the best inventory level and position with the minimum cost to satisfy the demandA
Ware house managementB
Inventory controlC
Stock managementD
Storage management
考题
单选题()is the method to keep the best inventory level and position with the minimum cost to satisfy the demand.A
warehouse managementB
Inventory controlC
stock managementD
storage management