Zero stock is the best way for()

  • A、lost control 
  • B、inventory control 
  • C、storage cost control 
  • D、warehouse cost control

参考答案

更多 “Zero stock is the best way for() A、lost controlB、inventory controlC、storage cost controlD、warehouse cost control” 相关考题
考题 The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost control, schedule, qualityB.Project objectives, dependencies, plan, cost controlC.Project scope, schedule, staffing, cost controlD.Project scope, quality, schedule, dependenciesE.Project budget, schedule, risk factors, work assignments.

考题 A(n) _____ system is designed to ensure the timely availability of nonhuman resources, and includes the cost in procurement, shipping/freight, storage and loss.A . Inventory control.B . Materials management.C . Procurement.D . All of the above.E . A and C only.

考题 VThe Pareto Principle is a technique used to determine which quality control problems in a particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?A . In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be correctedB . the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems.C . in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D . generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.E . A and D

考题 Standard of purchased material:A Simplifies inventory controlB reduces the risk of obsolescenceC reduces cost of purchasing and storageD All of the above.E A and C only.

考题 105 Standard of purchased material:A. Simplifies inventory controlB. reduces the risk of obsolescenceC. reduces cost of purchasing and storageD. All of the above.E. A and C only

考题 ● The Work Breakdown Structure (WBS) is the basis for communicating:A Project scope, cost control, schedule, qualityB Project objectives, dependencies, plan, cost controlC Project scope, schedule, staffing, cost controlD Project scope, quality, schedule, dependenciesE Project budget, schedule, risk factors, work assignments.

考题 The report showed us very clearly how the plane got ________ and crashed in the end. A.out of controlB.into controlC.under controlD.within control

考题 The crew couldn’t get the fire ________, causing a great loss to the shipA.to controlB.under controlC.in controlD.with control

考题 In the form. of ( ) the output is continuously fed back and compared with the reference input. A.continuous controlB.discontinuous controlC.discrete-data controlD.sampled-data control

考题 PCRF具备以下哪些功能()。 A、Service Access ControlB、Bearer QoS ControlC、Fair Usage ControlD、Subscriber Location Management

考题 The mode of control employed by an alarm circuit is aA.two position controlB.single speed floating controlC.proportional speed floating controlD.reset control

考题 The meat box temperature control circuit, as used in the ship service refrigeration system, is an example of ______.A.two position controlB.single speed floating controlC.proportional(比例) controlD.reset control

考题 Much of the effort cost control involves analyzing the relationship between the consumption of project funds and the work being accomplished for such expenditures . The key to effective cost control is the management of the approved ( ) .A.Schedule baseline B.Cost baseline C.Cost output D.Cost input

考题 The project management plan defines how the project is executed,monitored and controlled,and closed.It is progressively elaborated by updates,and controlled and approved through the perform integrated( )process.A.Cost control B.Schedule control C.Change control D.Risk control

考题 低速控制()A、low-speed controlB、inching controlC、high-speed controlD、slow-speed control

考题 在窗体上建立多页面,需要首先建立的对象是() A、Tab ControlB、Page ControlC、Header ControlD、Page Scroller

考题 ()is the method to keep the best inventory level and position with the minimum cost to satisfy the demandA、Ware house managementB、Inventory controlC、Stock managementD、Storage management

考题 Generally speaking,logistics can be divided into direct cost and()。A、packing costB、cost of salesC、indirect costD、warehouse cost

考题 ()is the method to keep the best inventory level and position with the minimum cost to satisfy the demand. A、warehouse managementB、Inventory controlC、stock managementD、storage management

考题 “零库存”的英文是()A、zero inventoryB、zero stockC、zero warehouseD、zero inventory control

考题 Zero stock is the best way for()A、cost controlB、inventory controlC、storage cost controlD、warehouse cost control

考题 Which version of a view would you use if you just want a quick, easy view within your XPage?()A、Data Table ControlB、View ControlC、Repeat ControlD、Filter by category View Control

考题 Which of the following is NOT one of the three details you need to fill in on the New Custom Control dialog?()A、Name of the custom controlB、Comments to describe the custom controlC、List of the controls that will make up this custom controlD、Application that will contain the custom control

考题 安全技术检查用英语表示为()A、security controlB、passport controlC、security checkD、safety control

考题 单选题Zero stock is the best way for()A cost controlB inventory controlC storage cost controlD warehouse cost control

考题 单选题()is the method to keep the best inventory level and position with the minimum cost to satisfy the demandA Ware house managementB Inventory controlC Stock managementD Storage management

考题 单选题()is the method to keep the best inventory level and position with the minimum cost to satisfy the demand.A warehouse managementB Inventory controlC stock managementD storage management