网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
To () , the power is supplied by main switchboard directly not though sub-board.
A
save network cost
B
improve the reliability of supplying power to important load
C
prevent sequence reverse
D
increase the power factor of important load
参考答案
参考解析
解析:
暂无解析
更多 “单选题To () , the power is supplied by main switchboard directly not though sub-board.A save network costB improve the reliability of supplying power to important loadC prevent sequence reverseD increase the power factor of important load” 相关考题
考题
Where could you monitor the correct instant for synchronizing without aid of synchroscope or synchronizing lamp?
A.Distribution boardB.Section boardC.Emergency switchboardD.Main switchboard
考题
请将下面程序补充完整。public class PowerCalc{public static void main(String[]args){double x=5.0;System. out. println(x+"to the power 4 is"+power(x, 4));System. out. println("7. 5 to the power 5 is"+power(7.5, 5));System. out. println("7.5 to the power 0 is"+power(7.5, 0));System. out. println("10 to the power -2 is"+power(10, -2));}static double【 】 (double x, int n){if(n>1)return x * power(x, n-1);else if(n<0)return 1.0/power(x, -n);elsereturn n==0 ? 1.0:x;}}
考题
________is supplied with electricity by main switchboard directly not through sub-board on boardA.Deck machineryB.Little power loadC.Some important load machineryD.Stationary submersible pump
考题
Lubrication for the main reduction gears used with diesel engines is usually supplied byA.oil from the main engine sumpB.an independent lube oil systemC.the stern bearing head tankD.the stem bearing sump tank
考题
For _______the power is supplied by main switchboard directly not through sub-boardA.saving network costB.improving the reliability of supplying power to important loadC.preventing sequence reversingD.increasing the power Factor of important load
考题
A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A. Backup power generatorB. Uninterruptable power supplyC. Power line conditionersD. Surge protectors
考题
You are on a tanker discharging oil.When all of the oil that the main cargo pumps can handle is pumped out of a tank,the remainder is ______.A.Stripped out and pumped directly ashore into the mainline as the remaining cargo tanks are pumped out with the main pumpsB.Stripped to one tank and then pumped out with the main pumpsC.Stripped out and pumped directly ashore after all the tanks have been emptied by the main pumpsD.Gravitated to the centers from the wings and pumped out with the main pumps
考题
A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A、Backup power generatorB、Uninterruptable power supplyC、Power line conditionersD、Surge protectors
考题
单选题()is not installed on the main switchboard.A
Ammeter and changeover switchB
Power factor meterC
SynchroscopeD
Reverse sequence relay
考题
单选题The frequency of an alternator is controlled from the main switchboard by adjusting the()A
frequency meterB
voltage regulatorC
governor controlD
sychroscope switch
考题
单选题The part of the shipboard electrical system used to control the distribution of power to the branch circuits, is the ().A
bridge control panelB
disconnect linksC
governor relay boxD
main switchboard
考题
单选题An indicator on the main switchboard should show () the emergency battery is in service or not.A
thatB
whenC
ifD
whether
考题
单选题()are located on the road panel of main switchboard.A
Megohm meter, insulation light and synchroscopeB
Synchroscope, synchro light and megohm meterC
Shore power switch, insulation light and synchroscopeD
Megohm meter, insulation light and shore power switch
考题
单选题()are supplied by main switchboard directly.A
Suez Canal searchlight, air compressor and air conditioning compressorB
Air compressor, boiler blower and refrigeration plantC
Boiler blower, Suez Canal searchlight and refrigeration plantD
Suez canal searchlight, air compressor and boiler blower
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMc B
Asynchronous adapters on the new HMcC
The two 570 servers are directly connected to the new HMc D
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
考题
单选题() is a machine by which electrical energy is transformed into mechanical energy.A
An alternatorB
An electric motorC
A diesel engineD
A main switchboard
考题
单选题()is not a part of the main switchboard.A
BusbarB
Load panel of main generatorC
Paralleling panelD
Shore connection box
考题
单选题Cooling the intake air supplied to a diesel engine will ().A
reduce mean effective pressureB
decrease average compression pressureC
decrease air charge densityD
increase power output
考题
单选题()is power supplied by main switchboard directly not through sub-board.A
Deck machineryB
Little power loadC
Some important loadD
stationary submersible pump
考题
单选题Emergency generator is installed on board mainly to ()A
connect to the busbar when the load increasingB
supply power specially to charging panelC
be put into operation during the ship arriving at or leaving portD
ensure the power supply to critical equipment after the main switchboard out of power
考题
单选题The purpose of a main switchboard circuit breakers reverse-power trip is to ().A
prevent main circuit overloadB
protect the circuit breaker blowout coilC
prevent alternator motorizationD
prevent low voltage tripout
考题
单选题A ground in an electrical circuit outside the engine room ().A
cannot be detected tinder normal conditionsB
is of no consequence to engineering personnelC
is indicated at the branch circuit breaker panelD
is indicated by the ground detecting lamps on the main switchboard
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMCB
Asynchronous adapters on the new HMCC
The two 570 servers are directly connected to the new HMCD
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
考题
单选题To () , the power is supplied by main switchboard directly not though sub-board.A
save network costB
improve the reliability of supplying power to important loadC
prevent sequence reverseD
increase the power factor of important load
考题
单选题() is (are) not power supplied by main switchboard directly.A
Steering gear and windlassB
Navigation light and radio power panelC
Navigation device power boxD
Daily fresh water pump
考题
单选题A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A
Backup power generatorB
Uninterruptable power supplyC
Power line conditionersD
Surge protectors
考题
单选题The crank chamber oil ().A
can be recoveredB
is only supplied to cylindersC
only feeds the main bearingD
is a kind of detergent
热门标签
最新试卷