网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
A

An additional switch for the new HMC

B

Asynchronous adapters on the new HMC

C

The two 570 servers are directly connected to the new HMC

D

One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC


参考答案

参考解析
解析: 暂无解析
更多 “单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC” 相关考题
考题 An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()A.An additional switch for the new HMCB.Asynchronous adapters on the new HMCC.The two 570 servers are directly connected to the new HMCD.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs.Which action will ensure the corrective service is correctly installed?() A.Select the option to automatically reboot the HMCB.Select the option to automatically reboot the HMC after each diskC.Shutdown all managed LPARs prior to beginning the install processD.Copy all disks into the SERVICE directory and select concurrent install

考题 An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc  B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc  D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、Asynchronous adapters on the new HMCC、The two 570 servers are directly connected to the new HMCD、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()A、CAT3 cableB、Serial cableC、Crossover cableD、Rollover cable

考题 Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A、An 8-port adapter to the HMCB、A hub for the private networkC、An additional Ethernet card to the HMCD、An additional Ethernet card for each partition

考题 The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()A、The hscroot user password.B、The CE password.C、The HMC password.D、The ASM admin password.

考题 Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

考题 A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

考题 A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A、The routes on the HMCB、The firewall setting of the LAN adapterC、The name resolution protocol on the p5 590 serverD、The subnet mask settings on the Ethernet adapters

考题 A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

考题 The IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ailedThe IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ailed Authentication The system administrator needs to enter a password. Which password is needed to restore connection for the POWER6 595 to the HMC?()  A、The hscroot user password.B、The CE password.C、The HMC password.D、The ASM admin password.

考题 A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A、Implement a proxy server to provide multiple sources to one destination B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C、Purchase a network hub or switch so both p5 570s can connect to the single HMC D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

考题 An administrator is applying a corrective service to their HMC. The corrective service has been shipped on 3 DVDs. Which action will ensure the corrective service is correctly installed?()A、Select the option to automatically reboot the HMCB、Select the option to automatically reboot the HMC after each diskC、Shutdown all managed LPARs prior to beginning the install processD、Copy all disks into the "SERVICE" directory and select concurrent install

考题 单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POWER5 HMCB Connect to the existing HMCC Install an 8-port asynchronous card in the managed server to connect to the existing HMCD Install an additional network card to the existing HMC and connect to the POWER5 service processor

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A An 8-port adapter to the HMCB A hub for the private networkC An additional Ethernet card to the HMCD An additional Ethernet card for each partition

考题 单选题A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A Implement a proxy server to provide multiple sources to one destination B Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C Purchase a network hub or switch so both p5 570s can connect to the single HMC D Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used

考题 单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A Purchase a second HMC and use this to manage the new servers.B Connect all of the new servers to the existing private HMC network.C Configure a second private network on their existing HMC for the new servers.D Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

考题 单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM

考题 单选题The IP address of POWER6 595 is showing up in the HMC instead of the server name.Next to the IP address is the status,which shows Failed Authentication.The system administrator needs to enter a password.  Which password is needed to restore connection for the POWER6 595 to the HMC?()A The hscroot user password.B The CE password.C The HMC password.D The ASM admin password.

考题 单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A Free up one HMC and update the software for use with the p5 570B Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

考题 单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A An 8-port adapter to the HMCB A hub for the private networkC An additional Ethernet card to the HMCD An additional Ethernet card for each partition

考题 单选题A network administrator needs to add an additional connection to a room. The administrator adds a new Ethernet switch and must connect it to an existing switch. Which cable type should be used to connect the two switches?()A CAT3 cableB Serial cableC Crossover cableD Rollover cable

考题 单选题A customer currently has five partitioned POWER4 systems and is adding new systems.  When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A Order a new HMC to support the p5 system.B Attach the new p5 system to the existing HMC.C Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D Do nothing.  This system does not require an HMC.

考题 单选题The IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ailedThe IP address of POWER6 595 is showing up in the HMC instead of the server name. Next to the IP address is the status, which shows ?ailed Authentication? The system administrator needs to enter a password. Which password is needed to restore connection for the POWER6 595 to the HMC?()A The hscroot user password.B The CE password.C The HMC password.D The ASM admin password.

考题 单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A Free up one HMC and update the software for use with the p5 570B Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc  B Asynchronous adapters on the new HMcC The two 570 servers are directly connected to the new HMc  D One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc