网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
All member of the engineering watch shall be familiar with assigned watch-keeping dutiesIn addition, every member shall, with respect to the ship they are serving in have knowledge of() Ⅰ.the use of appropriate internal communication systems Ⅱ.the use of GMDSS Ⅲ.the escape routes from machinery space Ⅳ.the number location and types of fire-fighting equipment in the machinery spaces
A

Ⅰ+Ⅲ+Ⅳ

B

Ⅱ+Ⅲ+Ⅳ

C

Ⅲ+Ⅳ

D

Ⅰ+Ⅱ+Ⅲ+Ⅳ


参考答案

参考解析
解析: 暂无解析
更多 “单选题All member of the engineering watch shall be familiar with assigned watch-keeping dutiesIn addition, every member shall, with respect to the ship they are serving in have knowledge of() Ⅰ.the use of appropriate internal communication systems Ⅱ.the use of GMDSS Ⅲ.the escape routes from machinery space Ⅳ.the number location and types of fire-fighting equipment in the machinery spacesA Ⅰ+Ⅲ+ⅣB Ⅱ+Ⅲ+ⅣC Ⅲ+ⅣD Ⅰ+Ⅱ+Ⅲ+Ⅳ” 相关考题
考题 When deciding the composition of the engineering watch, which may include____ appropriately, many factors shall be taken into account.A.satisfied engineersB.qualified ratingsC.satisfied chief engineerD.qualified chief' engineer

考题 The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in ______of operation are immediately implemented(执行).A.ahead or asternB.fore or aftC.up or downD.speed or direction

考题 The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A.shall take overB.shall not take overC.shall hand overD.shall not hand over

考题 The owner or Master of a towing vessel shall ensure that all tests and inspections of gear take place and are logged ______.A.when a new Master assumes commandB.daily,at 0800 local zone timeC.weekly,before 2400 SaturdayD.immediately after assuming the watch

考题 What time shall we {pass} the Suez Canal?A.reachB.bearC.transitD.watch

考题 That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that ______.A.any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB.the vessel should not be removedC.any and all lists on board the vessel should be taken offD.the inclination of the vessel should be corrected prior to ending his watch by the OOW

考题 ______ shall be conducted in a manner that minimizes the disturbance of rest periods and does not induce fatigue.A.All work on board the shipB.Engine watch-keepingC.Bridge watch-keepingD.Musters,fire-fighting and lifeboat drills

考题 Your tow includes a barge carrying chlorine.Which special requirements must be observed ________.A.The wing voids shall not be opened when underwayB.You must post a deckhand to keep a special watch on this bargeC.A cargo information card for chlorine must be in the pilothouseD.All of the above

考题 单选题The owner or Master of a towing vessel shall ensure that all tests and inspections of gear take place and are logged().A when a new Master assumes commandB daily,at 0800 local zone timeC weekly,before 2400 SaturdayD immediately after assuming the watch

考题 单选题The owner or Master of a towing vessel shall ensure that all tests and inspections of gear take place and are logged().A on each watch,immediately before being relievedB before embarking on a voyage of more than 24 hoursC daily,at 1200 local zone timeD weekly,before 0000 Sunday

考题 单选题The officer in charge of the deck watch in port shall not().A make rounds to inspect the ship at appropriate interalsB take every precaution to prevent pollution of the environment by the shipC enter, in the bell book, all important events affecting the shipD offer assistance to ships or person in distress

考题 单选题When deciding the composition of the engineering watch, which may include appropriately qualified ratings, following criteria shall be taken into account() Ⅰ.the type of ship Ⅱ.the type and condition of the machinery Ⅲ.the safety of life, ship, cargo and port Ⅳ.the observance of international, national and local regulationsA Ⅰ+ⅡB Ⅱ+ⅢC Ⅱ+Ⅲ+ⅣD Ⅰ+Ⅱ+Ⅲ+Ⅳ

考题 单选题When deciding the composition of the engineering watch, which may include appropriately, many factors shall be taken into account().A satisfied engineersB qualified ratingsC satisfied chief engineerD qualified chief engineer

考题 单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.A as long asB unlessC despiteD till

考题 单选题The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in () of operation are immediately implemented.A ahead or asternB fore or aftC up or downD speed or direction

考题 单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().A in any emergency or if in any doubt as to what decision or measures to takeB in the event of any impending action in machinery spaces that may cause reduction in ship’s speedC when isolating and bypassing machinery to be worked onD co-operating with any engineer in charge of maintenance work

考题 单选题In determining that the()of the navigational watch is adequate to ensure that a proper look-out can continuously be maintained,the master shall take into account all relevant factors.A dispositionB compositionC repositionD position

考题 单选题On all vessels equipped with refrigeration units of over 20 cubic foot capacity, ().A a gas mask suitable for protection against each refrigerant used, or a self contained breathing apparatus must be providedB it is the sole responsibility of the chief engineer to ascertain that all members of the engineering department are familiar with the use of gas masks or breathing apparatusC spare charges shall be carried for at least 50% of each size and variety of gas masks and/or self contained breathing apparatusD all of the above

考题 单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can immediately be placed in the () of operation when notified that the ship is in congested waters.A manual modeB automatic modeC remote modeD follow-up mode

考题 单选题When the ship is in restricted visibility, the officer in charge of the engineering watch shall ensure that () Ⅰ.Bridge order relating to changes in speed or direction of operation areimmediately implemented Ⅱ.auxiliary machinery used for maneuvering is readily available Ⅲ.permanent air or steam pressure is available for sound signalsA Ⅰ+ⅡB Ⅰ+ⅢC Ⅱ+ⅢD Ⅰ+Ⅱ+Ⅲ

考题 单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()A continue to be responsible for machinery space operations despite the presence of the CEB hand over the responsibility activelyC be responsible for the watching together with the chief engineerD assistant the chief engineer to control the machinery

考题 单选题The officer in charge of the navigational watch shall not hand over the watch to the relieving officer if().A there is reason to believe that the latter is not capable of carrying out the watchkeeping duties effectivelyB the ship is fitted with automatic steeringC there is daylight or darknessD at no time shall the bridge be left unattended

考题 单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()A a watch which is kept with lower standardB a watch which is kept when the ship isnt sailingC a watch which is kept when the ship is sailingD a watch which is kept when the ship is in a restricted visibility area

考题 单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can be immediately be placed in the manual mode of operation when notified that the ship is ()A at anchorB at unsheltered anchorageC in congested watersD in an open road-stead

考题 单选题All of the followings are the detainable deficiencies under the SOLAS Convention expert().A Failure of proper operation of propulsion and other essential machinery, as well as electrical installationB Failure of the proper operation of the main and auxiliary steering gearC Failure of engineering watch arrangements to confirm to the requirements specified for the ship by AdministrationD Failure of the proper operation of emergency generator, lighting, batteries and switches

考题 单选题Who may perform as a lookout().A A member of the engineering watchB A member of the navigational watchC A member of the Stewards DepartmentD All of the above

考题 单选题That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that().A any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB the vessel should not be removedC any and all lists on board the vessel should be taken offD the inclination of the vessel should be corrected prior to ending his watch by the OOW