网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in ______of operation are immediately implemented(执行).
A.ahead or astern
B.fore or aft
C.up or down
D.speed or direction
参考答案
更多 “ The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in ______of operation are immediately implemented(执行).A.ahead or asternB.fore or aftC.up or downD.speed or direction ” 相关考题
考题
At an unsheltered anchorage the chief engineer officer shall consult with_______whether or not to maintain an underway watchA.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate
考题
STCW78/95 Convention states that the officer in charge of the engineering watch is the representativeA.ship-owner'sB.master'sC.chief engineer'sD.manager's
考题
The engineer ______ the watch to the relieving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A.shall take overB.shall not take overC.shall hand overD.shall not hand over
考题
At an unsheltered(开放的) anchorage the chief engineer officer shall consult with ______whether or not to maintain an underway watch.A.the engineer officer in charge of watchB.the deck officer in charge of watchC.the masterD.the chief mate
考题
______ shall be conducted in a manner that minimizes the disturbance of rest periods and does not induce fatigue.A.All work on board the shipB.Engine watch-keepingC.Bridge watch-keepingD.Musters,fire-fighting and lifeboat drills
考题
If at any time the officer in charge of the navigational watch is to be relieved when a manoeuvre or other action to avoid any hazard is taking place,______.A.the relief of that officer shall be made prior to such action has been completedB.the relief of that officer shall never be madeC.the relief of that officer shall be deferred until such action has been completedD.the relief of that officer shall be made by the captain
考题
单选题Prior to taking over the deck watch in port,the relieving officer shall not be informed by the officer in charge of the deck watch as to().A
the depth of the water at the berthB
the ship‟s draughtC
the duty of the relieving officerD
the arrangement of anchor and the scope of the anchor chain
考题
单选题At an unsheltered anchorage the chief engineer officer shall consult with () whether or not to maintain an underway watch.A
the engineer officer in charge of watchB
the deck officer in charge of watchC
the masterD
the chief mate
考题
单选题The officer in charge of the deck watch in port shall not().A
make rounds to inspect the ship at appropriate interalsB
take every precaution to prevent pollution of the environment by the shipC
enter, in the bell book, all important events affecting the shipD
offer assistance to ships or person in distress
考题
单选题The officer in charge of the engineering ()the watch to the reliving officer if there is reason to believe that the latter is obviously not capable of carrying out the watch-keeping duties effectively.A
shall take overB
shall not take overC
shall hand overD
shall not hand over
考题
单选题The officer in charge of the engineering watch shall continue to be responsible for machinery operations, ()the presence of the chief engineer in the machinery space.A
as long asB
unlessC
despiteD
till
考题
单选题The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in () of operation are immediately implemented.A
ahead or asternB
fore or aftC
up or downD
speed or direction
考题
单选题The officer in charge of the engineering watch shall notify the chief engineer without delay ().A
in any emergency or if in any doubt as to what decision or measures to takeB
in the event of any impending action in machinery spaces that may cause reduction in ship’s speedC
when isolating and bypassing machinery to be worked onD
co-operating with any engineer in charge of maintenance work
考题
单选题The officer of the watch should use radar when appropriate and at all times in()waters.A
congestingB
congestedC
congestionD
congest
考题
单选题In determining that the()of the navigational watch is adequate to ensure that a proper look-out can continuously be maintained,the master shall take into account all relevant factors.A
dispositionB
compositionC
repositionD
position
考题
单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can immediately be placed in the () of operation when notified that the ship is in congested waters.A
manual modeB
automatic modeC
remote modeD
follow-up mode
考题
单选题All member of the engineering watch shall be familiar with assigned watch-keeping dutiesIn addition, every member shall, with respect to the ship they are serving in have knowledge of() Ⅰ.the use of appropriate internal communication systems Ⅱ.the use of GMDSS Ⅲ.the escape routes from machinery space Ⅳ.the number location and types of fire-fighting equipment in the machinery spacesA
Ⅰ+Ⅲ+ⅣB
Ⅱ+Ⅲ+ⅣC
Ⅲ+ⅣD
Ⅰ+Ⅱ+Ⅲ+Ⅳ
考题
单选题When the ship is in restricted visibility, the officer in charge of the engineering watch shall ensure that () Ⅰ.Bridge order relating to changes in speed or direction of operation areimmediately implemented Ⅱ.auxiliary machinery used for maneuvering is readily available Ⅲ.permanent air or steam pressure is available for sound signalsA
Ⅰ+ⅡB
Ⅰ+ⅢC
Ⅱ+ⅢD
Ⅰ+Ⅱ+Ⅲ
考题
单选题When the chief engineer is in the machinery spaces, the officer in charge of the engineering watch shall()A
continue to be responsible for machinery space operations despite the presence of the CEB
hand over the responsibility activelyC
be responsible for the watching together with the chief engineerD
assistant the chief engineer to control the machinery
考题
单选题When the machinery spaces are in the periodic unmanned condition, shall be immediately available and on call to attend the machinery space().A
the chief engineerB
the designated engineer from shipyardC
the designated duty officer in charge of the engineering watchD
the designated surveyor from classification society
考题
单选题The officer in charge of the navigational watch shall not hand over the watch to the relieving officer if().A
there is reason to believe that the latter is not capable of carrying out the watchkeeping duties effectivelyB
the ship is fitted with automatic steeringC
there is daylight or darknessD
at no time shall the bridge be left unattended
考题
单选题If in any doubt as to the pilot’s actions or intentions,the officer in charge of the navigational watch shall().A
notify the master immediatelyB
take whatever action is necessary before the master arrivesC
take necessary actions at his/her discretionD
seek clarification from the pilot
考题
单选题Which of the following shall not the officers in charge of the navigational watch do?()A
continue to be responsible for the safe navigation of the shipB
Leave the bridgeC
Keep the watch on the bridgeD
Use any available navigational aids necessary to ensure that the ship follows the planned course
考题
单选题The officer in charge of the engineering watch shall ensure that all machinery involved with the maneuvering of the ship can be immediately be placed in the manual mode of operation when notified that the ship is ()A
at anchorB
at unsheltered anchorageC
in congested watersD
in an open road-stead
考题
单选题The officer of the watch()a good lookout on the bridge.A
keepB
keepingC
keepsD
is keeping
考题
单选题The responsibilities of the engineer officer in charge of the watch do not include ()A
to ensure the main propulsion plant are kept under constant surveillanceB
to ensure the auxiliary systems are kept under constant surveillanceC
to inspect the steering gear spaces at suitable intervalsD
to inspect and overhaul the equipments in his charge
热门标签
最新试卷