网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The boat is stowed on the davit rather than on a cradle with which type of davit?()
A

Crescent

B

Sheath-screw boom

C

Quadrantal

D

Radial


参考答案

参考解析
解析: 暂无解析
更多 “单选题The boat is stowed on the davit rather than on a cradle with which type of davit?()A CrescentB Sheath-screw boomC QuadrantalD Radial” 相关考题
考题 ()_ trouble, I’m going to forget the whole affair. A.Then rather causeB.Rather causingC.Rather than causeD.Rather than caused

考题 Nowadays children in this area are taught at school()at home, but 60 years ago no children were taught at school()those from rich families. A、rather than; other thanB、other than; exceptC、other than; rather thanD、besides; except

考题 ____________ indoors watching TV, I prefer to go hunting in the forests. A.Rather than stayB.Rather than to stayC.Rather than stayingD.Rather staying

考题 A better than B other than C rather than D sooner than

考题 The reader is urged to be a leader, rather than a follower; to rely on his own power, rather than to (). A.informB.conformC.deformD.reform

考题 乘船比乘车更有趣。Taking a boat is_________ _________ than_________ a bus.

考题 [A] other than [B] rather than [C] more than [D] or rather

考题 The term Away From in the preparation of stowage plan for dangerous cargoes means that ________ .A.the cargoes shall be stowed in such positions that their vertical distances be greater than 3 metersB.the cargoes shall be stowed in different holds or compartmentsC.the cargoes shall be stowed in different holds or compartments between which there is at least a complete compartmentD.the cargoes shall be stowed in different holds or compartments between which there is at least a complete hold

考题 The term Longitudinally Separated From by a Complete Hold in the preparation of stowage plan for dangerous cargoes means that ________ .A.the cargoes shall be stowed in such positions that their vertical distances be greater than 3 metersB.the cargoes shall be stowed in different holds or compartmentsC.the cargoes shall be stowed in different holds or compartments between which there is at least a complete compartmentD.the cargoes shall be stowed in different holds or compartments between which there is at least a complete hold

考题 While cranking out a quadrantal davit,slippage of the quadrant due to excessive wear or failure of the teeth in the quadrant will cause the ______.A.Davit arm to pivot on the traveling nut and the head to fall outboardB.Traveling nut to lock up in place on the worm gearC.Limit switch to engage and hold the traveling nut in positionD.Winch brake to lock in position and prevent lowering the boat

考题 Frapping lines are fitted to lifeboat davits to ______.A.secure the lifeboat in the davits when in the stowed positionB.bring the life boat close along the rail in the embarkation positionC.give the occupants a safety line when the boat is being lowered from the embarkation levelD.reduce the swinging of the lifeboat at the embarkation level

考题 In launching a lifeboat, when should the tricing pendants be released?______.A.Before the boat is lowered from the stowage positionB.As soon as the boat-fall blocks clear the davit headC.After the limit switch is activatedD.After all people have been embarked

考题 Start the ()(艇机), drive the boat from the ship quickly.A、boat engineB、davit motorC、main engineD、fire boat

考题 单选题A mechanical davit is designed to automatically().A position the boat at the embarkation stationB lift the boat off the inboard chocksC energize the winch for the fallsD set the brake on the winch

考题 单选题After the boat is at the top of the davit heads,the davit arms begin moving up the tracks and are stopped by the().A hoist manB limit switchC brake handleD preventer bar

考题 单选题In launching a lifeboat,when should the tricing pendants be released?().A Before the boat is lowered from the stowage positionB As soon as the boat-fall blocks clear the davit headC After the limit switch is activatedD After all people have been embarked

考题 单选题When launching a lifeboat,the tricing pennants should be released().A before the boat is lowered from the stowed positionB as the boat-fall blocks break clear of the davit headC before the boat is lowered from the embarkation levelD after the boat is released into the water

考题 单选题Prior to entering a davit-launched liferaft,you should make sure that().A the liferaft is well ventilated of excess carbon dioxideB all personnel have removed their life preservers to facilitate boardingC the door flap has been cut away and stowed inside the raftD All of the above

考题 单选题Prior to entering a davit-launched life raft, you should make sure that().A the life raft is well ventilated of excess carbon dioxideB all personnel have removed their life preservers to facilitate boardingC the door flap has been cut away and stowed inside the raftD All of the above

考题 单选题The steering oar in a lifeboat is().A shorter than the othersB used for the stroke oarC used by the forward man in the boat to direct the bowD longer than the others and should be lashed to the stern

考题 单选题The lifeboats on your vessel are stowed on cradles on deck and are handled by sheath-screw boom davits. Which of the following statements about launching a boat is TRUE?()A The boat should be hoisted a few inches clear of the cradle before cranking out the davitsB The inboard gripes should be cast off before the outboard gripesC The outboard section of the cradle must be releasedD The tricing pendants will automatically bring the boat alongside at the embarkation deck

考题 单选题What is required to launch a boat stowed in a crescent davit?()A Hoist the boat clear of the cradleB Release the outboard part of the cradleC Rig the tricing linesD Crank the crescent out

考题 单选题On open lifeboats,the purpose of the wire stretched between the davit heads is to().A keep the movement of the davits at the same speedB keep the davits from slipping when they are in the stowed positionC prevent vibration during lowering of the boatD support the manropes

考题 单选题Limit switches().A control the descent rate of a lifeboatB control the ascent rate of a lifeboatC cut off power to the winch when the lifeboat nears the final stowed positionD cut off power to the winch when the lifeboat reaches the davit bumpers

考题 单选题When launching a lifeboat in the rough sea, the davit gears should be released().A before the boat is lowered from the stowed positionB as the boat fall blocks break clear of the davit headC before the boat is lowered from the embarkation levelD after the boat is released into the water

考题 单选题The pivot pin at the base of a sheath-screw boom davit must be().A inserted each time before the booms are cranked outB periodically removed for inspection and lubricatedC replaced at each inspection for certificationD in the locked position after the boat is cradled and griped down

考题 单选题Increasingly over the last few years, corporations involved in patent litigation have opted to settle the lawsuit rather than facing the protracted legal expenses of a court battle.A have opted to settle the lawsuit rather than facingB have opted settling the lawsuit instead of facingC have opted to settle the lawsuit rather than faceD had opted for settlement of the lawsuit instead of facingE had opted to settle the lawsuit rather than face