网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
问答题
如何把脚本和结果放到load generator的机器上?
参考答案
参考解析
解析:
暂无解析
更多 “问答题如何把脚本和结果放到load generator的机器上?” 相关考题
考题
The output voltage of a 440 volt, 60 hertz, AC generator is controlled by theA.prime mover speedB.exciter output voltageC.load on the alternatorD.number of poles
考题
下面关于“Load/SavePresets卷展栏”的说法正确的是()。A、把所有的结果保存到指定的位置B、把所有的结果保存到默认的位置C、保存所有的参数和结果D、只保存参数设置,不保存结果
考题
以下哪个操作会导致浮筒释放()A、把浮筒测试面板开关放到“TEST”位,头顶开关板开关放到“ARMED”位,按下总矩杆上的FLOATS开关B、把浮筒测试面板开关放到“NORM”位,头顶开关板开关放到“ARMED”位,按下周期杆上的FLOATS开关C、把浮筒测试面板开关放到“NORM”位,头顶开关板开关放到“OFF”位,按下总矩杆上的FLOATS开关D、把浮筒测试面板开关放到“TEST”位,头顶开关板开关放到“OFF”位,按下周期杆上的FLOATS开关
考题
用APU引气将发动机起动好后,如何才能”DUAL BLEED”灯灭()?A、把两个空调组件电门放到”AUTO”或”HIGH”位B、把空调”ISOLATION VALVE”电门放到”CLOSE”位C、把APU引气电门放到”OFF”位D、把左发引气电门关掉
考题
某飞行员准备对惯性基准系统进行快速校准,完成CDU输入后,不小心将惯导方式选择电门放到了姿态位,他应该如何处置?()A、他仍可以把方式电门放到导航位进行快速校准B、他应再次把方式电门放到校准位,再放到导航位进行快速校准C、他把方式电门放到关断位,再放到导航位仍可进行快速校准D、他应把方式电门放到关断位等校准灯灭,然后再进行全校准程序
考题
单选题The instantaneous reduction in voltage of an AC generator, resulting from an increase in load, and prior to the automatic voltage regulator correcting the situation, is called voltage ().A
droopB
dropC
dipD
regulation
考题
单选题Generators should have an excitation/voltage regulation system which will enable them to share the steady state reactive load () no machine exceeds its proportional share of reactive load by more than 10% of the rated reactive load of the largest generator.A
whenB
so asC
such thatD
though
考题
单选题When securing an AC generator, you should FIRST ().A
open the generator circuit breakerB
switch the voltage regulator to “manual”C
decrease the field excitation to minimumD
reduce the load on the unit
考题
单选题下面关于“Load/SavePresets卷展栏”的说法正确的是()。A
把所有的结果保存到指定的位置B
把所有的结果保存到默认的位置C
保存所有的参数和结果D
只保存参数设置,不保存结果
考题
单选题An emergency generator, driven by an internal combustion engine, shall be tested under load for a minimum of 2 hours at least once every ()A
weekB
2 weeksC
monthD
3 months
考题
单选题Emergency generator is installed on board mainly to ()A
connect to the busbar when the load increasingB
supply power specially to charging panelC
be put into operation during the ship arriving at or leaving portD
ensure the power supply to critical equipment after the main switchboard out of power
考题
单选题The load sharing characteristics of two diesel generator operating in parallel are mostly dependent on their governor ().A
load limit settingsB
idle speed settingsC
speed limit settingsD
speed droop settings
考题
单选题The alternating current generator supplying a load has a voltage drop resulted from the loadWhen the load has a lagging power factor this voltage drop ().A
is smallB
may be neglectedC
is usefulD
is considerable
考题
单选题A diesel generator has just been paralleled with an AC turbo-generator, but the load can not be properly divided.This could be caused by()A
an incorrect diesel generator governor speed droop adjustmentB
a faulty reverse power relay within the main circuit breaker assemblyC
unsynchronized isochronous load distribution adjustmentsD
a different speed setting on each unit
考题
单选题Which of the following statements is correct regarding a turbocharged four-stroke/cycle diesel generator?()A
At zero load the intake manifold pressure is greater than the exhaust manifold pressureB
At full load the intake manifold pressure and exhaust manifold pressure are equalC
At full load the intake manifold pressure is less than the exhaust manifold pressureD
At full load the intake manifold pressure is greater than the exhaust manifold pressure
考题
单选题Which of the following should be the FIRST step in removing a generator from parallel operation?()A
Trip the generator off the switchboardB
Turn off all electrical equipmentC
Remove the load from the off going generatorD
Increase the cycles of the generator staying on the line
考题
单选题The load rating of an AC generator is determined by the()A
internal heat it can withstandB
load it can carry continuouslyC
load it is capable of supplyingD
overload it can carry for a specified time only
考题
单选题A vessel is equipped with two ships service generatorsGenerator #1 is rated at 900kw and generator #2 is rated at 600kw.During parallel operation, with a hotel load of 1000kw, what should be the kw load on generator #2 ().A
100kwB
400kwC
500kwD
600kw
考题
单选题在Word编辑区中,要把一段已被选取的文字复制到同一篇文档的其他位置上,应()。A
把鼠标光标放到段文字上单击,再移动到目的位置上单击B
把鼠标光标放到该段文字上单击,再移动到目的位置上按下〈Ctrl〉键和鼠标左键单击C
把鼠标光标放到段文字上,按下〈Ctrl〉键和鼠标左键,并拖动到目的位置上再放开左键和〈Ctrl〉键D
把鼠标光标放到段文字上,按下鼠标左键,并拖动到目的位置上再放开左键
热门标签
最新试卷