网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Sailors should know the ()(安全工作负荷量)of derricks.
A

safe working load

B

safety work load

C

safe work load

D

safe working loading


参考答案

参考解析
解析: 暂无解析
更多 “单选题Sailors should know the ()(安全工作负荷量)of derricks.A safe working loadB safety work loadC safe work loadD safe working loading” 相关考题
考题 What ________ the safe working load of the derrick?A.isB.beC.areD.has

考题 ______ in a charter-party are working days on which the weather allows loading work or discharging work to be done.A.Whether working daysB.Weather working daysC.Running daysD.Calendar days

考题 In terms of vessel manning,a watch is the ______.A.direct performance of deck or engine operations in a scheduled and fixed rotationB.performance of maintenance work necessary for the vessel's safe operation,on a daily basisC.performance of lookout dutiesD.direct performance of cargo loading and discharge operations only

考题 What is the best instrument for establishing a safe working area before welding in a confined space?A.An oxygen indicatorB.A combustible gas indicatorC.A combination combustible gas and oxygen indicatorD.A flame safety lamp

考题 ______ is not among the Safety management objectives of the Company.A.to provide for safe practices in ship operation and a safe working environmentB.to establish safeguards against all identified risksC.to continuously improve safety management skills of personnel ashore and aboard ships,including preparing for emergencies related both to safety and environmental protectionD.to avoid damage to the environment,in particular,to the marine environment,and to property

考题 In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load

考题 The safe working load of the derrick is 5 tons.()A、吊杆的安全工作负荷量是5吨B、龙门吊的安全工作负荷量是5吨C、起货机的安全工作负荷量是5吨D、重吊杆的安全工作负荷量是5吨

考题 英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t

考题 What are two uRPF working modes?()A、express modeB、safe modeC、loose modeD、strict modeE、tight mode

考题 The safe working load of the ()is 100 tons.A、single derrickB、derrickC、heavy derrickD、deck

考题 安全负荷量()A、the loadB、safe working loadC、safe workingD、safe loading work

考题 Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading

考题 “SWL” means ().A、safe working loadB、safe work loadC、safe worked loadD、safely working load

考题 单选题What is the best instrument for establishing a safe working area before welding in a confined space? ()A An oxygen indicatorB A combustible gas indicatorC A combination combustible gas and oxygen indicatorD A flame safety lamp

考题 单选题安全负荷量()A the loadB safe working loadC safe workingD safe loading work

考题 单选题In determining a safe speed()shall not be among those taken into account.A the characteristics,efficiency and limitation of the radar equipmentB any constraints imposed by the radar range scale in useC the effect on radar detection of the sea state,weather and other sources of interferenceD the safe working load of the cranes both on board and ashore

考题 单选题Before welding is permitted on a fuel tank, it must be certified or declared ()A safe for becoming roundedB safe for hot workC not safe for personnelD not safe for hot work

考题 单选题The safe working load of the derrick is ().A 5 tonsB 5 metresC 5 feetD 5 years

考题 单选题In terms of vessel manning,a watch is the().A direct performance of deck or engine operations in a scheduled and fixed rotationB performance of maintenance work necessary for the vessel's safe operation,on a daily basisC performance of lookout dutiesD direct performance of cargo loading and discharge operations only

考题 单选题()is not among the Safety management objectives of the Company.A to provide for safe practices in ship operation and a safe working environmentB to establish safeguards against all identified risksC to continuously improve safety management skills of personnel ashore and aboard ships,including preparing for emergencies related both to safety and environmental protectionD to avoid damage to the environment,in particular,to the marine environment,and to property

考题 单选题The safety management objectives of the ISM Code are ().A to provide for safe practices in ship operation and a safe working environmentB to establish safeguards against all identified risksC to continuously improve safety management skills of personnel, including preparing for emergenciesD all the above

考题 单选题The safe working load of each derrick is five ().A tonesB tonnagesC tonsD dunnage

考题 单选题The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().A deckB head of the boomC heel of the boomD mast or king post

考题 单选题The safe working load of the derrick is 5 tons.()A 吊杆的安全工作负荷量是5吨B 龙门吊的安全工作负荷量是5吨C 起货机的安全工作负荷量是5吨D 重吊杆的安全工作负荷量是5吨

考题 单选题The safe working load of the ()is 100 tons.A single derrickB derrickC heavy derrickD deck

考题 单选题()in a charter-party are working days on which the weather allows loading work or discharging work to be done.A Whether working daysB Weather working daysC Running daysD Calendar days

考题 单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().A yearB two yearsC four yearsD five years