网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The winch at Hatch No.3 is()trouble.
A

at

B

in

C

on

D

over


参考答案

参考解析
解析: 暂无解析
更多 “单选题The winch at Hatch No.3 is()trouble.A atB inC onD over” 相关考题
考题 Far from ____helpful, the machine has given us a lot of trouble.

考题 ______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

考题 If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.A.when the line pull reaches the rated winch capacityB.after the line pull exceeds the rated winch capacityC.after a short build-up of torqueD.immediately

考题 When a winch breaks down,or some similar occurrence makes only one winch available at a hatch,which alternate rig would provide a temporary solution while repairs are made ________.A.Frisco RigB.Split fall rigC.West Coast RigD.Yard and stay jury rig

考题 There is something wrong with the winch at hatch No.2.()A、二舱的起货机出故障了。B、一舱的起货机出故障了。C、二舱的重吊杆出故障了。D、一舱的中吊杆出故障了。

考题 2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.

考题 Close the (), please.A、hatch coamingsB、hatch coversC、hatch beamsD、hatch openings

考题 头缆上车!()A、Put head line on winch!B、Put stern line on winch!C、Hold on head line!D、Heave in head line.

考题 翻译英文句子The item No.EE237402658 listed on line 5 enclosed nib bag No.3 is undeliverable due to the addressee’s address illegible.的中文意思是()。A、NO.3邮袋中5格的EE237402658邮件,请确认查核B、NO.3邮袋中5格的EE237402658邮件,请更正C、NO.3邮袋中5格的EE237402658邮件,因收件人地址不清无法投出D、早日答复NO.3邮袋中5格的EE237402658邮件,将不胜感激

考题 In Hatch No.3 lower hold there are a lot of materials for dunnaging,()paper,nets,planks and tapes.A、asB、likeC、such asD、such that

考题 单选题2号舱口处的起货机出故障了。()A There is something wrong with the derrick at hatch No.2.B There is something wrong with the derrick at hatch No.1.C There is something wrong with the winch at hatch No.2.D There is something wrong with the winch at hatch No.1.

考题 单选题A mechanical davit is designed to automatically().A position the boat at the embarkation stationB lift the boat off the inboard chocksC energize the winch for the fallsD set the brake on the winch

考题 单选题请把吊杆甩到舱口上方好吗?()A Will you please swing the heavy derrick over the hatch?B Will you please swing the derrick over the hatch?C Will you please lower the derrick over the hatch?D Will you please top the heavy derrick over the hatch?

考题 单选题Tell me(),please.A which hatch will be loaded firstB will which hatch be loaded firstC will hatch of which be loaded firstD first will which hatch be loaded

考题 单选题我船配有自动舱盖。()A Our ship is equipped with automatic hatch covers.B Our ship is equipped with folding-type hatch covers.C Our ship is equipped with side-rolling hatch covers.D Our ship is equipped with rolling-type hatch covers.

考题 单选题The limit switches on a ships survival-craft winch system().A stop the winch just before the craft reaches the final stowage positionB limit the amount of cable on the drumC limit the ascent rateD stop the winch in case the craft weighs too much

考题 单选题The()(吊杆)at hatch No.3 is in trouble.A winchB craneC derrickD gantry

考题 单选题Tonnage openings must be closed by means of().A Press boardB Steel hatch boardsC Steel platesD Wooden hatch boards

考题 单选题The()(侧滚式舱盖) runs along the guide rail.A rolling type hatch coverB side-rolling hatch coverC folding type hatch coverD automatic hatch cover

考题 单选题The clutch band of a constant tensioning mooring winch must be set up tight enough to drive the winch drum and should slip only when ().A excessive loads are placed on the winchB minimum pull is being exerted by the winchC automatic operation of the winch is desiredD wire is being retrieved at the maximum rate

考题 单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().A when the line pull reaches the rated winch capacityB after the line pull exceeds the rated winch capacityC after a short build-up of torqueD immediately

考题 单选题装卸货之前,打开舱盖。()A After loading and discharging, hatch covers will be opened.B After loading and discharging, hatch covers will be closed.C Before loading and discharging, hatch covers will be opened.D Before loading and discharging, hatch covers will be closed.

考题 单选题每一个舱盖由两个或更多的盖板组成。()A Each hatch consists of two panels.B Each hatch cover consists of two panels.C Each hatch consists of two or more panels.D Each hatch cover consists of two or more panels.

考题 单选题()is known as a long hatch during loading operation.A The largest hatch of a shipB The hatch that is double riggedC The hatch where a disproportionate amount of cargo is atowedD The hatch where the most cargo is stowed

考题 单选题The()(折叠式舱盖) can fold slowly.A rolling type hatch coverB side-rolling hatch coverC folding type hatch coverD automatic hatch cover

考题 单选题In Hatch No.3 the cargo()bulk is peaked.A inB onC withD for

考题 单选题There is something wrong with the winch at hatch No.2.()A 二舱的起货机出故障了。B 一舱的起货机出故障了。C 二舱的重吊杆出故障了。D 一舱的中吊杆出故障了。