网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The winch at Hatch No.3 is()trouble.
A
at
B
in
C
on
D
over
参考答案
参考解析
解析:
暂无解析
更多 “单选题The winch at Hatch No.3 is()trouble.A atB inC onD over” 相关考题
考题
______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed
考题
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.A.when the line pull reaches the rated winch capacityB.after the line pull exceeds the rated winch capacityC.after a short build-up of torqueD.immediately
考题
When a winch breaks down,or some similar occurrence makes only one winch available at a hatch,which alternate rig would provide a temporary solution while repairs are made ________.A.Frisco RigB.Split fall rigC.West Coast RigD.Yard and stay jury rig
考题
There is something wrong with the winch at hatch No.2.()A、二舱的起货机出故障了。B、一舱的起货机出故障了。C、二舱的重吊杆出故障了。D、一舱的中吊杆出故障了。
考题
2号舱口处的起货机出故障了。()A、There is something wrong with the derrick at hatch No.2.B、There is something wrong with the derrick at hatch No.1.C、There is something wrong with the winch at hatch No.2.D、There is something wrong with the winch at hatch No.1.
考题
头缆上车!()A、Put head line on winch!B、Put stern line on winch!C、Hold on head line!D、Heave in head line.
考题
翻译英文句子The item No.EE237402658 listed on line 5 enclosed nib bag No.3 is undeliverable due to the addressee’s address illegible.的中文意思是()。A、NO.3邮袋中5格的EE237402658邮件,请确认查核B、NO.3邮袋中5格的EE237402658邮件,请更正C、NO.3邮袋中5格的EE237402658邮件,因收件人地址不清无法投出D、早日答复NO.3邮袋中5格的EE237402658邮件,将不胜感激
考题
In Hatch No.3 lower hold there are a lot of materials for dunnaging,()paper,nets,planks and tapes.A、asB、likeC、such asD、such that
考题
单选题2号舱口处的起货机出故障了。()A
There is something wrong with the derrick at hatch No.2.B
There is something wrong with the derrick at hatch No.1.C
There is something wrong with the winch at hatch No.2.D
There is something wrong with the winch at hatch No.1.
考题
单选题A mechanical davit is designed to automatically().A
position the boat at the embarkation stationB
lift the boat off the inboard chocksC
energize the winch for the fallsD
set the brake on the winch
考题
单选题请把吊杆甩到舱口上方好吗?()A
Will you please swing the heavy derrick over the hatch?B
Will you please swing the derrick over the hatch?C
Will you please lower the derrick over the hatch?D
Will you please top the heavy derrick over the hatch?
考题
单选题Tell me(),please.A
which hatch will be loaded firstB
will which hatch be loaded firstC
will hatch of which be loaded firstD
first will which hatch be loaded
考题
单选题我船配有自动舱盖。()A
Our ship is equipped with automatic hatch covers.B
Our ship is equipped with folding-type hatch covers.C
Our ship is equipped with side-rolling hatch covers.D
Our ship is equipped with rolling-type hatch covers.
考题
单选题The limit switches on a ships survival-craft winch system().A
stop the winch just before the craft reaches the final stowage positionB
limit the amount of cable on the drumC
limit the ascent rateD
stop the winch in case the craft weighs too much
考题
单选题Tonnage openings must be closed by means of().A
Press boardB
Steel hatch boardsC
Steel platesD
Wooden hatch boards
考题
单选题The()(侧滚式舱盖) runs along the guide rail.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题The clutch band of a constant tensioning mooring winch must be set up tight enough to drive the winch drum and should slip only when ().A
excessive loads are placed on the winchB
minimum pull is being exerted by the winchC
automatic operation of the winch is desiredD
wire is being retrieved at the maximum rate
考题
单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().A
when the line pull reaches the rated winch capacityB
after the line pull exceeds the rated winch capacityC
after a short build-up of torqueD
immediately
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题每一个舱盖由两个或更多的盖板组成。()A
Each hatch consists of two panels.B
Each hatch cover consists of two panels.C
Each hatch consists of two or more panels.D
Each hatch cover consists of two or more panels.
考题
单选题()is known as a long hatch during loading operation.A
The largest hatch of a shipB
The hatch that is double riggedC
The hatch where a disproportionate amount of cargo is atowedD
The hatch where the most cargo is stowed
考题
单选题The()(折叠式舱盖) can fold slowly.A
rolling type hatch coverB
side-rolling hatch coverC
folding type hatch coverD
automatic hatch cover
考题
单选题There is something wrong with the winch at hatch No.2.()A
二舱的起货机出故障了。B
一舱的起货机出故障了。C
二舱的重吊杆出故障了。D
一舱的中吊杆出故障了。
热门标签
最新试卷