网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Shore power must be() during dock repair.
A

disconnected

B

switched off

C

cut off

D

connected


参考答案

参考解析
解析: 暂无解析
更多 “单选题Shore power must be() during dock repair.A disconnectedB switched offC cut offD connected” 相关考题
考题 If our captain is not in his cabin, he must be on the(驾驶台)_______.A.paint lockerB.engine roomC.bridgeD.shore

考题 A large basin cut into the shore,closed off by a caisson,and used for dry docking of ships is known as a ______.A.slipwayB.graving dockC.ground warpD.caisson dock

考题 If you must pump bilges while a vessel is in port,you should pump only ______.A.If discharge is led to a shore tank or bargeB.During the hours of darknessC.On the outgoing tideD.As much as is necessary

考题 The international shore connection required on a ship is designed to ______.A.Permit discharge of waste oilB.Allow hook up of fire fighting water from a dock or another vesselC.Satisfy pollution prevention requirementsD.Allow emergency use of the fire main for deballasting

考题 The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.A.on a tug standing byB.available by contract with the shore facilityC.kept at the shoreside hose connection during transferD.kept in a protected shoreside location readily accessible

考题 If our captain is not in his cabin, he must be on the ().A、paint lockerB、engine roomC、bridgeD、shore

考题 If our captain is not in his cabin, he must be on the(驾驶台)().A、paint lockerB、engine roomC、bridgeD、shore

考题 单选题A large basin cut into the shore,closed off by a caisson,and used for dry docking of ships is known as a().A slipwayB graving dockC ground warpD caisson dock

考题 单选题A vessel is()when she is not at anchor,made fast to the shore,or aground.A underwayB making wayC dead in the waterD a power driven vessel

考题 单选题If your vessel is equipped with a radiotelephone,what must also be aboard?()A Certificate of InspectionB List of ship stationsC Copy of ship to shore channelsD Radio station license

考题 单选题Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()A Open the intake valve to an adjacent tankB Set out drip pans and sawdust and begin to mop up the spillC Signal the shore control point to shut downD Close the valve on the tank vent line

考题 单选题A facility used for the discharge of a cargo of a particular hazard,such as chlorine,butane or ethane,must have what to warn water traffic of an immediate danger during fire or cargo release?()A An emergency boat and crewB A siren or rotating flashing lightC Flashing red lights located one-half mile upstream and downstream of the facilityD Buoys with flashing lights controlled from shore,located one-half mile upstream anddownstream of the facility

考题 单选题The ()(笨重货) must be handled by jumbo boom or shore crane.A awkward cargoB drummed cargoC cased cargoD heavy cargo

考题 单选题At night while the ship is tied up to the dock,a fire breaks out in a cargo hatch. After sounding the alarm,what should the person on watch do?()A Begin fighting the fire immediatelyB Await further orders from the MasterC Let go the lines to let the vessel drift to an anchorageD Send a person to summon the shore authorities

考题 单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()A igniting boilerB releasing air in sea water systemC starting generatorD cut off shore power

考题 单选题()are located on the road panel of main switchboard.A Megohm meter, insulation light and synchroscopeB Synchroscope, synchro light and megohm meterC Shore power switch, insulation light and synchroscopeD Megohm meter, insulation light and shore power switch

考题 单选题A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().A slipwayB graving dockC ground warpD caisson dock

考题 单选题The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().A on a tug standing byB available by contract with the shore facilityC kept at the shoreside hose connection during transferD kept in a protected shoreside location readily accessible

考题 单选题Inspection of a vessel’s propeller during dry-dock should include ()A noting the condition of the fairwaterB inspection of the keywayC logging inspection results in the official deck logD all of above

考题 单选题The range of a SSB transmission is MOST affected by().A atmospheric noise and radiated powerB the frequency band selected and time of day or nightC interference and position of the moonD radiated power and nearness to shore

考题 单选题You are docking a vessel starboard side to with the assistance of two tugs.You are attempting to hold the vessel off by operating both tugs at right angles to the vessel and at full power.You must ensure that().A steerageway is not taken offB the bow doesn't close the dock firstC the bow closes the dock firstD the ship has no headway at the time

考题 单选题When is dock survey carried out?()A During annual repairB Usually during dock repairC Before sea trialD After 5 years from last annual survey

考题 单选题Which of the following precautions must be taken if an electric immersion heater is used to keep the coolant in a diesel engine warm during the time the engine is secured?()A The coolant temperature must be maintained at 180℃B The thermostatic bypass valves must be manually opened before the engine is startedC The pressure cap must be removed while the engine is securedD Electrical power to the heater must be secured before the cooling system is drained

考题 单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()A chief engineerB the engineerC captainD any member of the engine department

考题 单选题An oceangoing ship of 400 gross tons and above must be fitted with a standard discharge shore connectionWhat is the size of the bolt circle diameter of the shore connection required to transfer oily ballast to a shore side reception facility?()A 125 mmB 183 mmC 215 mmD It depends on outside pipe diameter

考题 单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()A chief engineerB surveyorC the engineerD the technique personnel of the shipyard

考题 单选题Which statement correctly applies to a situation where a sailing vessel is overtaking a power-driven vessel().A The power-driven vessel must keep out of the way of the sailing vesselB A special circumstance situation existsC The sailing vessel must keep out of the way of the power- driven vesselD The vessel which has the other vessel to the right must keep out of the way