网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Shore power must be() during dock repair.
A
disconnected
B
switched off
C
cut off
D
connected
参考答案
参考解析
解析:
暂无解析
更多 “单选题Shore power must be() during dock repair.A disconnectedB switched offC cut offD connected” 相关考题
考题
If our captain is not in his cabin, he must be on the(驾驶台)_______.A.paint lockerB.engine roomC.bridgeD.shore
考题
A large basin cut into the shore,closed off by a caisson,and used for dry docking of ships is known as a ______.A.slipwayB.graving dockC.ground warpD.caisson dock
考题
If you must pump bilges while a vessel is in port,you should pump only ______.A.If discharge is led to a shore tank or bargeB.During the hours of darknessC.On the outgoing tideD.As much as is necessary
考题
The international shore connection required on a ship is designed to ______.A.Permit discharge of waste oilB.Allow hook up of fire fighting water from a dock or another vesselC.Satisfy pollution prevention requirementsD.Allow emergency use of the fire main for deballasting
考题
The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.A.on a tug standing byB.available by contract with the shore facilityC.kept at the shoreside hose connection during transferD.kept in a protected shoreside location readily accessible
考题
If our captain is not in his cabin, he must be on the ().A、paint lockerB、engine roomC、bridgeD、shore
考题
If our captain is not in his cabin, he must be on the(驾驶台)().A、paint lockerB、engine roomC、bridgeD、shore
考题
单选题A large basin cut into the shore,closed off by a caisson,and used for dry docking of ships is known as a().A
slipwayB
graving dockC
ground warpD
caisson dock
考题
单选题A vessel is()when she is not at anchor,made fast to the shore,or aground.A
underwayB
making wayC
dead in the waterD
a power driven vessel
考题
单选题If your vessel is equipped with a radiotelephone,what must also be aboard?()A
Certificate of InspectionB
List of ship stationsC
Copy of ship to shore channelsD
Radio station license
考题
单选题Your vessel is at a dock taking bunkers through a pipe laid down on the dock. If oil begins to flow out of a tank vent,what should you do FIRST?()A
Open the intake valve to an adjacent tankB
Set out drip pans and sawdust and begin to mop up the spillC
Signal the shore control point to shut downD
Close the valve on the tank vent line
考题
单选题A facility used for the discharge of a cargo of a particular hazard,such as chlorine,butane or ethane,must have what to warn water traffic of an immediate danger during fire or cargo release?()A
An emergency boat and crewB
A siren or rotating flashing lightC
Flashing red lights located one-half mile upstream and downstream of the facilityD
Buoys with flashing lights controlled from shore,located one-half mile upstream anddownstream of the facility
考题
单选题The ()(笨重货) must be handled by jumbo boom or shore crane.A
awkward cargoB
drummed cargoC
cased cargoD
heavy cargo
考题
单选题At night while the ship is tied up to the dock,a fire breaks out in a cargo hatch. After sounding the alarm,what should the person on watch do?()A
Begin fighting the fire immediatelyB
Await further orders from the MasterC
Let go the lines to let the vessel drift to an anchorageD
Send a person to summon the shore authorities
考题
单选题When the dock is refilled with water after docking repair, the first work which should be done by engineers is ()A
igniting boilerB
releasing air in sea water systemC
starting generatorD
cut off shore power
考题
单选题()are located on the road panel of main switchboard.A
Megohm meter, insulation light and synchroscopeB
Synchroscope, synchro light and megohm meterC
Shore power switch, insulation light and synchroscopeD
Megohm meter, insulation light and shore power switch
考题
单选题A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().A
slipwayB
graving dockC
ground warpD
caisson dock
考题
单选题The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().A
on a tug standing byB
available by contract with the shore facilityC
kept at the shoreside hose connection during transferD
kept in a protected shoreside location readily accessible
考题
单选题Inspection of a vessel’s propeller during dry-dock should include ()A
noting the condition of the fairwaterB
inspection of the keywayC
logging inspection results in the official deck logD
all of above
考题
单选题The range of a SSB transmission is MOST affected by().A
atmospheric noise and radiated powerB
the frequency band selected and time of day or nightC
interference and position of the moonD
radiated power and nearness to shore
考题
单选题You are docking a vessel starboard side to with the assistance of two tugs.You are attempting to hold the vessel off by operating both tugs at right angles to the vessel and at full power.You must ensure that().A
steerageway is not taken offB
the bow doesn't close the dock firstC
the bow closes the dock firstD
the ship has no headway at the time
考题
单选题When is dock survey carried out?()A
During annual repairB
Usually during dock repairC
Before sea trialD
After 5 years from last annual survey
考题
单选题Which of the following precautions must be taken if an electric immersion heater is used to keep the coolant in a diesel engine warm during the time the engine is secured?()A
The coolant temperature must be maintained at 180℃B
The thermostatic bypass valves must be manually opened before the engine is startedC
The pressure cap must be removed while the engine is securedD
Electrical power to the heater must be secured before the cooling system is drained
考题
单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()A
chief engineerB
the engineerC
captainD
any member of the engine department
考题
单选题An oceangoing ship of 400 gross tons and above must be fitted with a standard discharge shore connectionWhat is the size of the bolt circle diameter of the shore connection required to transfer oily ballast to a shore side reception facility?()A
125 mmB
183 mmC
215 mmD
It depends on outside pipe diameter
考题
单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()A
chief engineerB
surveyorC
the engineerD
the technique personnel of the shipyard
考题
单选题Which statement correctly applies to a situation where a sailing vessel is overtaking a power-driven vessel().A
The power-driven vessel must keep out of the way of the sailing vesselB
A special circumstance situation existsC
The sailing vessel must keep out of the way of the power- driven vesselD
The vessel which has the other vessel to the right must keep out of the way
热门标签
最新试卷