单选题
A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()
A
perform a Disk Magic study
B
review eConfig with a technical specialist
C
confirm that the customer has enough ports available in the SAN infrastructure
D
submit configuration to IBM System Storage Interoperability Center for validation
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()A perform a Disk Magic study B review eConfig with a technical specialist C confirm that the customer has enough ports available in the SAN infrastructure D submit configuration to IBM System Storage Interoperability Center for validation” 相关考题
考题
A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()
A. verify configurationB. conduct pre-install TDAC. complete physical planningD. verify the solution meets requirements
考题
The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()
A. capacity above 500 TBB. first in customer locationC. a new model has been releasedD. sold without implementation service
考题
A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC, HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems. Which tool compares performance()A、Capacity MagicB、eConfigC、TPC for DiskD、Disk Magic
考题
The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service
考题
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A、IBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacityB、IBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacityC、IBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System pD、IBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p
考题
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A、IBM DS8700 with 600 GB drives for the System p, 300 GB/15k drives for Systemi; and advanced functions for System p capacityB、IBM DS8700 with LPAR, 300 GB/15k drives and RAID 10 for Systemi; and 600GB drives with RAID 5 and advanced functions for System p capacityC、IBM DS8700 with advanced functions, 300 GB/15k drives and RAID 10 for Systemi performance; and 600 GB drives and RAID 5 for System p capacityD、IBM DS5100 with Enhanced Remote Mirror, 600GB/15k drives and RAID 5 for System p; and 300GB/15k drives and RAID 10 for Systemi
考题
A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()A、Suggest to the customer to send their administrator to IBM System x training class to learn more about IBM Intel based servers.B、Propose a try and buy option and offer to help the customer in sizing the new Linux server. Engage the system Engineer on this opportunity.C、Introduce the IBM pSeries Unix product specialist to the account because IBM operating system (AIX) offers an open Unix solution.D、Direct the customer to the IBM Web site to help with sizing and System x server models and types. Follow-up with the customer to answer any sizing question.
考题
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()A、IBM System Storage DS8000: Host Systems Attachment GuideB、DS8000 Interoperability MatrixC、IBM System Storage DS8000: Introduction and Planning GuideD、IBM System Storage Solution Handbook
考题
A customer is interested in purchasing a new IBM System Storage DS8000 solution to consolidateolder ESS and F20 storage systems. What should be done first, prior to final proposaldevelopment?()A、perform a Disk Magic study B、review eConfig with a technical specialist C、confirm that the customer has enough ports available in the SAN infrastructure D、submit configuration to IBM System Storage Interoperability Center for validation
考题
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions. What is needed to read the exported system plan and design the new system?()A、e-ConfigB、System Planning Tool (SPT)C、IBM Workload Estimator (WLE)D、IBM Performance Monitor (PM)
考题
While installing a new IBM System Storage DS5100 into a customer’s data center, it is discoveredthat the customer does not have enough available Fibre Channel ports on their switches. Which ofthe following should have been used to avoid this situation?()A、IBM DS5000 Cabling ToolB、IBM e-Configurator ToolC、IBM Pre-Installation TDA ChecklistD、IBM Standalone Solutions Configuration Tool
考题
A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()A、TCOnowB、Disk Magic C、Capacity Magic D、System Storage Productivity Center (SSPC)
考题
A current N series customer has an IBM System Storage N3600. They are interested in futureexpansion. What is the minimum number of disk drives required to populate the expansion shelf?()A、0B、1C、4D、14
考题
A customer is purchasing an IBM System Storage DS8700. What is the most important first step for the installation?()A、verify configurationB、conduct pre-install TDAC、complete physical planningD、verify the solution meets requirements
考题
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()A、purchasing customerB、IBM Installation Readiness TeamC、IBM Customer EngineerD、IBM Business Partner
考题
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()A、Send the customer information on VMwareB、Send the customer information on IBM BladeCenter C、Call the customer to ask why they are consolidatingD、Send the customer information on IBM System P
考题
A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A、Verification of the expected performance of the new solution.B、A document used by IBM manufacturing to build and ship the system solution.C、An IBM Quality Assurance Certificate which is supplied to the customer with the system.D、A list of actions that are recommended to reduce risk and create a successful implementation.
考题
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
考题
A UNIX customer has a Symmetrix DMX that has crashed three times in the past six months, causing data loss. The customer is shopping for an enterprise storage solution to provide point-in- time copy functionality without a fixed relationship to its primaries. Which IBM solution best meets this customer’s requirements()A、IBM System Storage DS8700 andVolumeCopyB、IBM System Storage DS8700 andFlashCopyC、IBM System Storage DS8700 andFlashCopy with the NoCopy optionD、IBM System Storage DS8700 andFlashCopy with the Persistent option
考题
单选题A small bio-tech company is interested in implementing an IBM System Storage solution. Which ofthe following tools can be used to help justify the cost of our solution to a customer?()A
TCOnowB
Disk Magic C
Capacity Magic D
System Storage Productivity Center (SSPC)
考题
单选题A Technical and Delivery Assessment (TDA) is a structured technical inspection of a completed solution design. After the inspection is complete, what deliverable can the customer expect?()A
Verification of the expected performance of the new solution.B
A document used by IBM manufacturing to build and ship the system solution.C
An IBM Quality Assurance Certificate which is supplied to the customer with the system.D
A list of actions that are recommended to reduce risk and create a successful implementation.
考题
单选题A customer is currently using a Windows file server to share NFS storage (9 TB) to theirapplication server, and a small SAN to supply block I/O to their database servers (5 TB). As theircurrent hardware is aging they are looking for a new best of breed technology to combine file andblock I/O on a single storage unit. Which IBM solution would provide that capability at the lowestcost?()A
IBM XIV Storage System B
IBM System Storage DS8700 C
IBM System Storage N6070 D
IBM System Storage N6210
考题
单选题An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()A
IBM System Storage DS8000: Host Systems Attachment GuideB
DS8000 Interoperability MatrixC
IBM System Storage DS8000: Introduction and Planning GuideD
IBM System Storage Solution Handbook
考题
单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A
capacity above 500 TBB
first in customer locationC
a new model has been releasedD
sold without implementation service
考题
单选题A current N series customer has an IBM System Storage N3600. They are interested in futureexpansion. What is the minimum number of disk drives required to populate the expansion shelf?()A
0B
1C
4D
14
考题
单选题A pharmaceutical company has a requirement for 8.5 TB of usable storage for a new data center. The customer has multiple host applications running on Solaris, Windows 2003, HP-U/X, Linux, and IBM System i platforms. Which IBM System Storage DS8000 volume configuration providesthe best performance and highest availability for this customer()A
RAID 3B
RAID 5C
RAID 6D
RAID 10
考题
单选题The pSeries sales representative has done an excellent job in educating the customer on the benefits of working with IBM. The customer is planning to implement their first ERP application. This new application will be critical to running their business. The customer has only a competitor’s UNIX systemcurrently installed. They are interested in obtaining a proposal from IBM. In addition to the AIX hardware and HACMP software, what else should be included in the IBM proposal for the new ERP solution?()A
I/T services and education to help with the implementation of the hardware and softwareB
A Supportline specialist to work directly with the customer to manage any issues that ariseC
The services required to move the currently installed applications from the competitor’s systems to the IBM systemsD
A slimmed down solution to ensure that the IBM solution is less expensive than the competitor’s solution
考题
单选题A customer is interested in purchasing a new IBM System Storage TS3500 Tape Library. Which ofthe following documents should be used first to guide the Business Partner to verify theenvironment?()A
TS3500 RedbookB
TS3500 Operators ManualC
Solution Assurance Product Review (SAPR) GuideD
TS3500 Product Installation and Planning Guide
热门标签
最新试卷