网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
()during the last repair?
A
Did you have No.4 cylinder repair
B
Do you have No.4 cylinder repaired
C
Didn’t you have No.4 cylinder repairing
D
Didn’t you have No.4 cylinder repaired
参考答案
参考解析
解析:
暂无解析
更多 “单选题()during the last repair?A Did you have No.4 cylinder repairB Do you have No.4 cylinder repairedC Didn’t you have No.4 cylinder repairingD Didn’t you have No.4 cylinder repaired” 相关考题
考题
●During the last few years,it has been realized that maintenance of programs is more expensive than development,so reading of programs by humans is as important as (73) them.(73) A.editingB.writedC.writtenD.writing
考题
During his last lecture, the scientist______(觉得)easier to explain the theory to those with some background knowledge. (find)
考题
The Industrial () started during the last part of the 18th century, in the same period as the American and the French Revolutions.
A.MovementB.DriveC.ProcessD.Revolution
考题
— Is there some problem? — () .
A.I am sorry.The parts have been ordered, but they haven't come in yet.B.It was supposed to have been ready last week.C.I will call you as soon as the repair is finished.
考题
View the Exhibit to examine the error during the database startup.You open an RMAN session for the database instance. To repair the failure, you executed the following as the first command in the RMAN session:RMAN REPAIR FAILURE;Which statement describes the consequence of the command?()A. The command performs the recovery and closes the failures.B. The command only displays the advice and the RMAN script required for repair.C. The command produces an error because the ADVISE FAILURE command has not been executed before the REPAIR FAILURE command.D. The command executes the RMAN script to repair the failure and removes the entry from the Automatic Diagnostic Repository (ADR).
考题
What is NOT true about overhaul repair?( )
A.Overhaul repair is a major repair.B.Overhaul repair is carried out in a dock.C.Overhaul repair is carried out once a year.D.Overhaul repair is done for the purpose of rating.
考题
During the last few years ,it has been realized that maintenance of programs is more expensive than development, so reading of programs by humans is as important as(73)them.A.editingB.writedC.writtenD.writing
考题
During the dock repair,______should be measured firstly before tail shaft drawn out.A.the sinking of tail shaftB.the clearance of stern bearingC.the total flexure of shaftD.main engine crankshaft deflection
考题
during bunkering in the last vessel ,what were you assigned to do ?or what was your position during bunkering on your last vessel ?
考题
From the last paragraph we know that in Brazil______.A. it is important to arrive at the appointed timeB. it is rude for professors to be late for classC. it is normal for students to leave during lecturesD. it is natural to keep the professor staying after class
考题
Why should you soak an anchor ________.A.It can prevent the anchor from slipping during pretensioningB.It will lubricate all the moving parts of a stock anchorC.It will increase the maximum breaking strength of the anchor chainD.It will make it easier to disassemble the anchor for repair
考题
The last time I saw her was () my brother"s wedding ceremony three years ago.A、toB、atC、inD、during
考题
单选题During repair,lubrication lines and orifices must be ().A
taken awayB
engagedC
connectedD
sealed off
考题
单选题This used piston had been tested and approved as a spare part by the () during last annual repair.A
agentB
shipchandlerC
surveyorD
engineer
考题
单选题A seaman is reported missing in the morning and was last seen after coming off the mid-watch. Which type of turn would you use to return to the trackline steamed during the night?()A
WilliamsonB
RacetrackC
180°turnD
Anderson
考题
单选题During the dock repair, should be measured firstly before tail shaft drawn out()A
the sinking of tail shaftB
the clearance of stern bearingC
the total flexure of shaftD
main engine crankshaft deflection
考题
单选题—How did you play in the match?—Well, our team was ahead by two to zero during the first half, but we _____ in the last ten minutes.A
had lostB
have lostC
were losingD
lost
考题
单选题()refers to the repair during the voyage.A
Voyage repairB
Annual repairC
Periodical repairD
Survey check
考题
单选题Which command do you use to display the messages seen during the last system boot?()A
show system boot-messagesB
show chassis messagesC
show file system boot-messagesD
show boot-log messages
考题
单选题When is dock survey carried out?()A
During annual repairB
Usually during dock repairC
Before sea trialD
After 5 years from last annual survey
考题
单选题In accordance with SOLAS,the batteries that power interior lighting in inflatable liferafts can be made to last longer by().A
unscrewing the bulb during the daylightB
switching the light on only when necessaryC
taking no action as there is no way on saving powerD
taking no action as they shut off automatically in daylight
考题
单选题To ensure the quality of dock repair, C/E should know very well ()A
the repair standard of main docking repair itemB
the special tool for repair itemC
the skill of repairerD
the status of docking repair equipment
考题
单选题ou need additional storage space on your Windows 2000 Professional computer. You install a second SCSI controller and a second hard disk. During the installation of the SCSI driver, you receive a warning that the driver is unsigned. You complete the installation of the driver and restart Windows 2000 Professional. During startup, you receive a Stop error. You need to correct the error and start Windows 2000 as quickly as possible. What should you do?()A
Start the computer in Recovery Console. Delete the SCSI controller driver.B
Start the computer by using the last known good configuration.C
Start the computer by using the Windows 2000 startup floppy disks, and repair the system files.D
Start the computer by using the Windows 2000 startup floppy disks, and repair the registry.
考题
单选题During the dock repair, when installing the tail shaft and propeller, who should be on the spot to supervise?()A
chief engineerB
the engineerC
captainD
any member of the engine department
考题
单选题(), where minor repairs are carried out with a ship service, often during a stay in portThis may be remote from a ship repair site.A
voyage repairsB
routine dockingC
damage repairsD
conversion
考题
单选题During the deck repair,() should be measured firstly before tail shaft is drawn out.A
the sinking of tail shaftB
the clearance of stern bearingC
the total flexure of both end bearingD
main engine crankshaft deflection
考题
单选题During the dock repair, each sea valve must be disassembled, cleaned and ground well.Before it reassemble the sealing surface between the valve and the valve seat should be checked by ()A
chief engineerB
surveyorC
the engineerD
the technique personnel of the shipyard