单选题
A server has two PCI-X buses with four Active PCI-X slots. Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one. After the server has been installed and configured, the server must be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz. The customer’s priority is to have no downtime, and performance is secondary. Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()
A
Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3
B
Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2
C
Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3
D
Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4
参考答案
参考解析
解析:
暂无解析
更多 “单选题A server has two PCI-X buses with four Active PCI-X slots. Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one. After the server has been installed and configured, the server must be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz. The customer’s priority is to have no downtime, and performance is secondary. Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()A Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3B Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2C Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3D Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4” 相关考题
考题
A server has a single, half height, PCI-X 3.3v slot available. Which of the following cards can fit in this slot? ()
A. Half Height, Universally Keyed PCI cardB. Full Height, 3.3v PCI-X cardC. Half Height, x16 PCI Express CardD. Half Height, 3.3v PCI cardE. Half Height, Universally Keyed PCI-X cardF. Full Height, Universally Keyed PCI cardG. Half Height, x8 PCI Express Card
考题
A server has a single, half height, PCI-X 3.3v slot available. Which of the following cards can fit in 1 this slot?()A、 Half Height, Universally Keyed PCI cardB、 Full Height, 3.3v PCI-X cardC、 Half Height, x16 PCI Express CardD、 Half Height, 3.3v PCI cardE、 Half Height, Universally Keyed PCI-X cardF、 Full Height, Universally Keyed PCI cardG、 Half Height, x8 PCI Express Card
考题
When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()A、PCIe adapters are supported only in I/O drawersB、PCI-X adapters are supported in both the CEC and in I/O drawersC、PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawersD、PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers
考题
A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()A、 One, two, three or four processorsB、 One, two, or three processorsC、 One, three, or four processorsD、 One, two or four processors
考题
Which of the following is the benefit of installing two expandability cables to an RXE-100 from an x445?()A、Higher availability of the enclosureB、Access to both channels of the RXE-100C、Support for more PCI-X 133MHz I/O cardsD、Improved management of the Drawer Management Controller in the RXE-100
考题
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters
考题
Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()A、3 PCI-e I/O drawers and 1 PCI-X I/O drawerB、4 PCI-e I/O drawers and 4 RIO-2 I/O drawersC、2 PCI-e I/O drawers and 4 PCI-x I/O drawersD、4 PCI-e I/O drawers and 2 PCI-X I/O drawers
考题
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
考题
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.
考题
A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A、2 PCI-X drawers and 2 PCIe drawersB、3 PCI-X drawers and 4 PCIe drawersC、4 PCI-X drawers and 3 PCIe drawersD、4 PCI-X drawers and 2 PCIe drawers
考题
Your Windows Server 2003 environment consists of a single Active Directory directory service forest with multiple domains. The forest functional level is set to Windows 2000 Server. Your company has a main office and four branch offices. Each office has two domain controllers. The domain controllers in the main office are global catalog servers. In the branch offices, searches for some printers in Active Directory are slow. You need to improve the performance of Active Directory printer searches in the four branch offices. What should you do?() A、 Enable universal group membership caching in each branch office.B、 Increase the number of domain controllers in each branch office.C、 Add global catalog services to each branch office.D、 Upgrade the forest functional level to Windows Server 2003.
考题
Your company has a main office and a branch office that are configured as a single Active Directory forest. The functional level of the Active Directory forest is Windows Server 2003. There are four Windows Server 2003 domain controllers in the main office. You need to ensure that you are able to deploy a read-only domain controller (RODC) at the branch office. Which two actions should you perform()A、Run the adpreplrodcprep command.B、Raise the functional level of the forest to Windows Server 2008.C、Raise the functional level of the domain to Windows Server 2008.D、Deploy a Windows Server 2008 domain controller at the main office.
考题
Your company has an Active Directory forest that contains only Windows Server 2008 domain controllers. You need to prepare the Active Directory domain to install Windows Server 2008 R2 domain controllers. Which two tasks should you perform()A、Run the adprep /forestprep command.B、Run the adprep /domainprep command.C、Raise the forest functional level to Windows Server 2008.D、Raise the domain functional level to Windows Server 2008.
考题
You are designing the Windows Server 2003 Active Directory forest structure to meet the business and technical requirements. Which forest structure should you use?()A、 One Active Directory forest with one domain.B、 One Active Directory forest with three domains.C、 One Active Directory forest with four domains.D、 Two Active Directory forests with one domain in each forest.E、 Three Active Directory forests with one domain in each forest.
考题
Your network consists of a single Active Directory site. You plan to deploy Exchange Server 2010. You need to plan the deployment of Exchange Server 2010 servers to meet the following requirements:.All Mailbox servers must belong to a database availability group (DAG) .MAPI connections from Outlook clients must be load balanced by using a hardware load balancer .If a single server fails, users must continue to send and receive e-mail .The plan must minimize the number of servers deployed What should you include in the plan?()A、Deploy two servers. On the two servers,deploy the Mailbox server role,the Client Access server role,and the HubTransport server role. Configure a Client Access server array.B、Deploy two servers. On the two servers, deploy the Mailbox server role,the Client Access Server role,and the HubTransport server role. Enable Outlook Anywhere on both Client Access servers.C、Deploy four servers. On two of the servers,deploy the Mailbox server role and the Hub Transport server role. On the other two servers,deploy the Client Access server role. Configure a Client Access server array.D、Deploy four servers. On two of the servers,deploy the Mailbox server role. On the other two servers,deploy the Client Access server role and the Hub Transport server role. Enable Outlook Anywhere on both Client Access servers.
考题
单选题A customer is ready to place an order for a p5-570 Express. The external storage proposed for this solution is a 1TB FAStT600 storage server. The customer now wishes to attach a SCSI LTO-2 tape drive to the server to enable them to backup their data. Which of the following should the pSeries technical specialist recommend for the tape drive?()A
Add a PCI-X Dual Channel Ultra320 SCSI Adapter (FC 5712).B
Add a PCI-X Fibre Channel Adapter (FC 5716).C
Add the optional External SCSI Port Enablement Cable (FC 4273).D
Use the integrated external SCSI port on the p5-570 Express server.
考题
单选题When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()A
PCIe adapters are supported only in I/O drawersB
PCI-X adapters are supported in both the CEC and in I/O drawersC
PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawersD
PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers
考题
单选题You are designing the Windows Server 2003 Active Directory forest structure to meet the business and technical requirements. Which forest structure should you use?()A
One Active Directory forest with one domain.B
One Active Directory forest with three domains.C
One Active Directory forest with four domains.D
Two Active Directory forests with one domain in each forest.E
Three Active Directory forests with one domain in each forest.
考题
单选题Certkiller.com has servers on the main network that run Windows Server 2008. It also has two domain controllers. Active Directory services are running on a domain controller named CKDC1. You have to perform critical updates of Windows Server 2008 on CKDC1 without rebooting the server. What should you do to perform offline critical updates on CKDC1 without rebooting the server()A
Start the Active Directory Domain Services on CKDC1B
Disconnect from the network and start the Windows update featureC
Stop the Active Directory domain services and install the updates. Start the Active Directorydomain services after installing the updates.D
Stop Active Directory domain services and install updates. Disconnect from the network and then connect againE
None of the above
考题
单选题A recently ordered server came standard with one 3.0GHz processor. It is capable of handling fourtotal processors. Which of the following processor combinations can be used in this server?()A
One, two, three or four processorsB
One, two, or three processorsC
One, three, or four processorsD
One, two or four processors
考题
单选题Which of the following configuration is valid for expansion drawers on a Power 750 with 2 processor board sinstalled?()A
3 PCI-e I/O drawers and 1 PCI-X I/O drawerB
4 PCI-e I/O drawers and 4 RIO-2 I/O drawersC
2 PCI-e I/O drawers and 4 PCI-x I/O drawersD
4 PCI-e I/O drawers and 2 PCI-X I/O drawers
考题
多选题Your company has an Active Directory forest that contains only Windows Server 2003 domain controllers. You need to prepare the Active Directory domain to install Windows Server 2008 domain controllers. Which two tasks should you perform()ARun the adprep /forestprep command.BRun the adprep /domainprep command.CRaise the forest functional level to Windows Server 2008.DRaise the domain functional level to Windows Server 2008.
考题
多选题A server has a single, half height, PCI-X 3.3v slot available. Which of the following cards can fit in 1 this slot?()AHalf Height, Universally Keyed PCI cardBFull Height, 3.3v PCI-X cardCHalf Height, x16 PCI Express CardDHalf Height, 3.3v PCI cardEHalf Height, Universally Keyed PCI-X cardFFull Height, Universally Keyed PCI cardGHalf Height, x8 PCI Express Card
考题
单选题A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A
2 PCI-X drawers and 2 PCIe drawersB
3 PCI-X drawers and 4 PCIe drawersC
4 PCI-X drawers and 3 PCIe drawersD
4 PCI-X drawers and 2 PCIe drawers