A potential new customer needs servers and requests a response to their hardware specifications, which are all related to hardware speeds, disk, and memory configuration. The customer requests a quote within 48 hours.  Which of the following should the System x Sales Specialist do to MAXIMIZE the odds of winning this business? ()
A

Request an extension because 48 hours will not be enough time to propose an appropriate solution.

B

Ask the customer for a call to learn more about their needs and respond to their request with a complete solution.

C

Use the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.

D

Contact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A potential new customer needs servers and requests a response to their hardware specifications, which are all related to hardware speeds, disk, and memory configuration. The customer requests a quote within 48 hours.  Which of the following should the System x Sales Specialist do to MAXIMIZE the odds of winning this business? ()A Request an extension because 48 hours will not be enough time to propose an appropriate solution.B Ask the customer for a call to learn more about their needs and respond to their request with a complete solution.C Use the configuration guide or spreadsheet configurator to assemble server configurations that meet the specification, and then look for the lowest price.D Contact the IBM Client Representative for this account and ask for assistance in setting up a meeting with the technical decision maker of the prospective customer.” 相关考题
考题 A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment.What IBM solution should be recommended to this customer?()A. Metro MirrorB. Metro/Global MirrorC. Geographically Dispersed Open Servers (GDOS)D. Geographically Dispersed ParallelSysplex (GDPS)

考题 A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT

考题 A customer needs to achieve a very aggressive RTO of 30 minutes or less. A critical requirement is a continuous availability and disaster recovery solution for the mainframe environment. What IBM solution should be recommended to this customer?()A、Metro MirrorB、Metro/Global MirrorC、Geographically Dispersed Open Servers (GDOS)D、Geographically Dispersed ParallelSysplex (GDPS)

考题 A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

考题 A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()A、increase the buffer credits on the HBAsB、increase the number of device logins on the ESX serversC、additional paths will be required between the servers and storageD、multipath option on the ESX servers should be changed to round-robin

考题 A customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion.The customer is concerned about cost. Which of the following meets the customers needs? ()A、DS3500 with SAS Host Connection B、DS3500 with iSCSI Host Connection C、DS3500 with FC Host Connection D、DS5020

考题 A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700.  They would like to upgrade and plan for 40 TB capacity.  The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?

考题 The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()A、x3950B、x3850C、x3650D、LS41

考题 A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers

考题 A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()A、thereare no potential risksB、the FCIDs of the servers must be changedC、the SVC must be shut down during the migrationD、changing the FCIDs of storage resources will impact some servers

考题 A customer is evaluating the purchase of a new p570 8-way Express to replace their current set of ten 2-way database and application servers that are more than five years old.  In addition to savings potential in the areas of operating system and database charges, what other significant savings component should be highlighted?()A、Maintenance savings due to warranty on new machinesB、Reliability savings of using one machine versus tenC、Financial savings due to cash outlays now versus laterD、Power savings even if the current power usage is unknown

考题 A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new storage subsystems and a disaster recovery solution that provides consistent data in the event of a disaster at the local site.  Which IBM System Storage DS8000 solution should the storage  specialist propose to the client()A、Metro/Global MirrorB、Metro MirrorC、Global CopyD、Global Mirror

考题 A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

考题 The customer is consolidating their ten rack mount Windows servers into a VMware environment with four servers. The existing servers all have internal disk. The total amount of useable capacity is 5TB which is expected to increase to 10TB over the life of this asset. The customer will want to use the advanced features of VMware like VMotion. The customer is concerned about cost. Which of the following meets the customers needs?()A、DS3500 with SAS Host ConnectionB、DS3500 withiSCSI Host ConnectionC、DS3500 with FC ConnectionD、DS5020

考题 A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers.  They have four identical new applications each requiring a minimum of seven processors and 96GB of memory.  Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers

考题 A customer needs to share large files across three Power Systems servers to create and validate complex automotive designs. What IBM solution should be recommended?()A、PowerHA SystemMirrorB、Peer to Peer Remote CopyC、General Parallel File SystemsD、Parallel Operating Environment

考题 A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path.  From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.

考题 A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()A、A VIO server requires a dedicated LHEA port.B、There is a limit of 32 LPARs per virtual LAN.C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.

考题 A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs

考题 A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers.  The current environment is direct attached storage.  The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms.  The customer also needs a fibre attached backup solution.  Which of the following solutions has the best combination of price and performance?()A、A DS4300 Turbo with Fibre Attached Tape LibraryB、A DS4500 with EXP700’s and Fibre Attached Tape LibraryC、A DS4500 with EXP710’s and Fibre Attached Tape LibraryD、A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library

考题 单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A An IBM BladeCenter H chassis for the JS22 Blade serversB A concurrent KVM daughter cardC A pair of IBM BladeCenter Power SuppliesD A second Management Module

考题 单选题The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()A x3950B x3850C x3650D LS41

考题 单选题A customer plans to replace a McData 6140 core director with a Cisco MDS 9506. The storage is based on SVC with three DS5300 back-end storage systems. The storage resources are attached to the 6140 core while all servers are attached to edge switches. Linux, Windows and AIX servers use the SVC. Which of the following is a potential risk associated with this planned migration?()A thereare no potential risksB the FCIDs of the servers must be changedC the SVC must be shut down during the migrationD changing the FCIDs of storage resources will impact some servers

考题 单选题A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A A DCE domainB A Kerberos domainC A PPP tunnel between the serversD An IPSEC tunnel between the servers

考题 单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A Create capped partitions for the database servers.B Create workload partitions for the database servers.C Create a separate shared processor pool for the database servers.D Create virtual processors equal to the entitlement for database servers.

考题 单选题A customer wants to hold all enterprise data on their DS4000 system.  Several servers were added after they purchased another company.  The servers that have to be run are:       (1)An Oracle database running on a HP-UX server   (2)Several virtual machines running on VMWare ESX server       (3)A Microsoft cluster running Exchange 2000 server   Which of these new servers can be integrated with the DS4000?()A DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.B An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.C When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.D VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.

考题 单选题A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers.  The current environment is direct attached storage.  The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms.  The customer also needs a fibre attached backup solution.  Which of the following solutions has the best combination of price and performance?()A A DS4300 Turbo with Fibre Attached Tape LibraryB A DS4500 with EXP700’s and Fibre Attached Tape LibraryC A DS4500 with EXP710’s and Fibre Attached Tape LibraryD A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library