网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
safety load()
A
安全负载
B
安全货物
C
安全装货
D
安全性
参考答案
参考解析
解析:
暂无解析
更多 “单选题safety load()A 安全负载B 安全货物C 安全装货D 安全性” 相关考题
考题
简述Load,Init ,Activate 的前后顺序。()
A、Load,Init ,ActivateB、Init ,Load,ActivateC、Load,Activate ,InitD、Init ,Load,Activate
考题
Whichelement,definedasachildofaelementinthewebapplicationdeploymentdescriptor,guaranteesaservletwillbeinitializedatthetimetheapplicationisdeployed?()
A.load-on-startup/B.load-on-startup1/load-on-startupC.load-on-startup-1/load-on-startupD.load-on-startuptrue/load-on-startup
考题
Which certificate is always issued by the China Classification Society? ______.A.Loadline certificateB.Safety equipment certificateC.Safety construction certificateD.Safety cargo gear certificate
考题
______ should be presented to the Customs officers.A.Bonded Store ListB.Deratization CertificateC.Load line CertificateD.Radio Safety Certificate
考题
To determine the number of certificated lifeboatmen required on a vessel,you should check the ______.A.Load Line CertificateB.Certificate of InspectionC.Safety of Life at Sea CertificateD.operations manual
考题
To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the ______.A.load line certificateB.Operations ManualC.Safety of Life at Sea CertificateD.Certificate of Inspection
考题
The safest procedure used to rig a guy and preventer is to have the guy ______.A.and preventer have equal stressB.stronger than the preventer to minimize the danger of separationC.take a lighter load than the preventer as a safety factorD.take the stress in case the preventer parts
考题
If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor ______.A.when the line pull reaches the rated winch capacityB.after the line pull exceeds the rated winch capacityC.after a short build-up of torqueD.immediately
考题
As soon as the ship gets alongside the wharf, you should lower the gangway and put a ()below it.A、safety netB、safety beltC、safety lampD、safety device
考题
记住,安全第一。()A、Remember: safety first.B、Mind. Safe the first.C、Think of it. Safety is one.D、Think of it. Safety first.
考题
Which element, defined as a child of a element in the web application deployment descriptor, guarantees a servlet will be initialized at the time the application is deployed?() A、 load-on-startup/ B、 load-on-startup1/load-on-startup C、 load-on-startup-1/load-on-startup D、 load-on-startuptrue/load-on-startup
考题
单选题Which element, defined as a child of a element in the web application deployment descriptor, guarantees a servlet will be initialized at the time the application is deployed?()A
load-on-startup/ B
load-on-startup1/load-on-startup C
load-on-startup-1/load-on-startup D
load-on-startuptrue/load-on-startup
考题
单选题Deficiencies in the categories of Life-saving, Safety in General, Fire-fighting Appliances and Load Line () approximately 66% of all deficiencies.A
account asB
account forC
account toD
account of
考题
单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A
INTERNATIONAL LOAD LINE CERTIFICATEB
PASSENGER SHIP SAFETY CERTIFICATEC
CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED
GENERAL DECLARATION
考题
单选题The vessel’s Load Line Certificate is always issued by ().A
The Register of ShippingB
Customs HouseC
Cargo Survey BureauD
Maritime Safety Administration
考题
单选题If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().A
when the line pull reaches the rated winch capacityB
after the line pull exceeds the rated winch capacityC
after a short build-up of torqueD
immediately
考题
单选题Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().A
after torque causes line pull to exceed the rated capacity of the winchB
before the line pull reaches the rated capacity of the winchC
when the line pull reaches the breaking strength of the fallD
before the safe working load of the fall is reached
考题
单选题Blocks and falls used as lifeboat gear must be designed with a minimum safety factor of().A
4,based on the breaking strengthB
5,based on the maximum allowable stressC
6,based on the maximum working loadD
8,based on the normal working load
考题
单选题The safest procedure used to rig a guy and preventer is to have the guy().A
and preventer have equal stressB
stronger than the preventer to minimize the danger of separationC
take a lighter load than the preventer as a safety factorD
take the stress in case the preventer parts
考题
单选题What is the use of work assets on safety plans? ()A
The work asset determines to which assets and locations a safety plan can be applied.B
Only safety plans with associated work assets can be used in combination with job plans. C
The safety plan can only be applied to work orders with the same asset or location associated.D
The work assets combined with the work on a job plan dictate which safety information is required.
考题
单选题Which is the winter load waterline on the load waterline mark?().A
The line over the summer load waterlineB
The line above the tropical load waterlineC
The line below the tropical load waterlineD
The line between the summer and the winter north Atlantic load waterline
考题
单选题What does MBDD mean on the load waterline mark?().A
Timber tropical load waterlineB
Timber summer load waterlineC
Timber winter load waterlineD
Timber winter north Atlantic load waterline
热门标签
最新试卷