网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()
A
12
B
10
C
8
D
6
参考答案
参考解析
解析:
暂无解析
更多 “单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A 12 B 10 C 8 D 6” 相关考题
考题
A customer has an EMC Symmetrix DMX3000 that is at the end of lease. The environment consists of IBM System p, IBM System i, and IBM System z. The customer is evaluating EMC, HDS, and IBM storage as possible replacements. They are interested in comparing the performance of all three disk subsystems. Which tool compares performance()A、Capacity MagicB、eConfigC、TPC for DiskD、Disk Magic
考题
A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A、12 B、10 C、8 D、6
考题
A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT
考题
A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request?()A、Brocade Enterprise 20-port 8Gb SAN switch module B、Brocade 20-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter share C、Brocade Enterprise 10-port 8Gb SAN switch module D、Brocade 10-port 8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter
考题
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
考题
You have a junior sales representative working with your largest customer, who needs to build an entry System x Server hardware solution. Which IBM resource should the junior sales representative use? ()A、IBM Sizing GuidesB、IBM System x and BladeCenter Business Partner GuidebookC、IBM Standalone Solutions Configuration Tool (SSCT) D、IBM ServerProven
考题
You have a request to put together IBM System x and blade servers attached to IBM DS4000 Storage: all in a rack. Your customer is also requesting services. What IBM resource will help you put these different products together?()A、IBM System x and BladeCenter Business Partner GuidebookB、IBM Sizing GuidesC、IBM Configuration Options Guide (COG)D、IBM Standalone Solutions Configuration Tool (SSCT)
考题
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch.Which of the following should be mentioned to the customer regarding the NPIV switch?()A、You can not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch B、Using blade servers with the NPIV switch will require more fibre ports on the external fibre switch C、Storage devices like Fibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switchD、The NPIV switch will count against the number of domains in a fabric
考题
A retail customer is looking at ways to reduce power requirements. They are considering deploying two hundred IBM HS22 blades running Red Hat Linux in the IBM BladeCenter E chassis. The customer has already chosen Intel L5640 CPUs to reduce power. Which on-board storage option allows the customer to reduce power consumption of each blade?()A、One 50 GB SATA 1.8 inch SSDB、Two 73GB 10K SAS HDD SFFC、Two 31 GB SATA 2.5 inch SSDD、Two 50GB SATA 1.8 inch SSD
考题
A Sales Specialist receives an email from a customer, requesting information on IBM’s best Server Consolidation solution. How should the Sales Specialist proceed? ()A、Send the customer information on VMwareB、Send the customer information on IBM BladeCenter C、Call the customer to ask why they are consolidatingD、Send the customer information on IBM System P
考题
A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which of the following is the minimum amount of rack space required to implement the solution?()A、32U B、25U C、22U D、21U
考题
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
考题
A customer has the following equipment installed in their data center: (1)an IBM BladeCenter H chassis (2)two power supplies (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5. Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5
考题
A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the internal fibre switches. Consequently. the customer wants to use the Optical Pass-Thru Module (OPM). What TRUE statement should be mentioned to the customer regarding the OPM?()A、You can not put the Optical Pass-Thru Module in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet Switch.B、Using blade servers with the Optical Pass-Thru Module will require more fibre ports on the external fibre switch.C、The Optical Pass-Thru Module does not provide the customer with an opportunity to reuse their fibre switch.D、The blade servers do not work with the Optical Pass-Thru Module.
考题
A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H. What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units
考题
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A
An IBM BladeCenter H chassis for the JS22 Blade serversB
A concurrent KVM daughter cardC
A pair of IBM BladeCenter Power SuppliesD
A second Management Module
考题
单选题A customer has a BladeCenter H chassis with a single AMM. The AMM is defective. Which of the following is the method to backup the existing AMM so the new AMM automaticlally picks up the configuration? ()A
Back up the AMM configuration to a file B
Back up the AMM configuration to the chassis C
Back up the AMM using IBM Systems Director D
Back up the AMM using Tivoli Storage Manager
考题
单选题A medical customer has a rack with four BladeCenter H chassis that have been operating normally for several months. After installing a new rack of servers in the data center, the system administrator notices the blowers in the BladeCenters have increased their speed. Which of the following caused this problem? ()A
The room temperature has reached 23C (73.4F). B
A Blade within the chassis has been shut down. C
The ambient temperature in the data center has increased D
One of the additional System X servers in the BladeCenter rack has failed.
考题
单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: (1)two Brocade 20-Port SAN Switch Modules (2)two Nortel Networks 1/10 GB Uplink ESM (3)a redundant AMM What is the minimum number of power supplies needed for this configuration to have full redundancy?()A
4B
3C
2D
8
考题
单选题A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A
Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB
Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC
Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD
Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
考题
单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A
Support for10Gb internal networkB
Support for SSDC
Support for integrated disk drivesD
Support for8Gb FC Switch Modules
考题
单选题A banking customer deployed an IBM BladeCenter chassis with one Brocade 8Gb SAN switch module. The customer requires an 8Gb uplink or higher. Which configuration will meet this request of the following?()A
Brocade Enterprise 20-port 8Gb SAN switch moduleB
Brocade 20-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenterC
Brocade Enterprise 10-port 8Gb SAN switch moduleD
Brocade 10-port8Gb SAN switch module and Brocade Advanced Performance Monitoring for IBM BladeCenter
考题
单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A
6B
8C
10D
12
考题
单选题A banking customer plans to implement a BladeCenter H chassis. They plan for seven HS22 blades, six HX5 blades with MAX5, one 1U external Fibre Channel switch, and two 3U Fibre Channel storage devices with fourteen 146GB drives. Which is the minimum amount of rack space required to implement the solution of the following?()A
32UB
21UC
25UD
22U
考题
单选题A customer wants to install an IBM BladeCenter infrastructure but is concerned about the cost of the full fabric internal fibre switches. Consequently, the customer is considering an N_Port ID Virtualization (NPIV) capable switch. Which of the following should be mentioned to the customer regarding the NPIV switch?()A
Youcan not use an NPIV switch in the same IBM BladeCenter chassis as a Cisco Intelligent Ethernet SwitchB
Using blade servers with the NPIV switch will require morefibre ports on the external fibre switchC
Storage devices likeFibre Channel Tape and Disk cannot be attached to the NPIV Switch but must connect to a core fabric switch.D
The NPIV switch will count against the number of domains in a fabric
考题
单选题A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack. Which IBM BladeCenter Chassis should be recommended? ()A
BladeCenter EB
BladeCenter HC
BladeCenter TD
BladeCenter HT