网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
A

effect

B

influence

C

affect

D

impress


参考答案

参考解析
解析: 暂无解析
更多 “单选题The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.A effectB influenceC affectD impress” 相关考题
考题 ()is not included in the main contents of the operation and maintenance of the information system.A.Daily operation and maintenanceB.System changeC.Security managementD.Business change

考题 A survey of refrigerated cargo,to certify that proper methods of stowage were utilized,can be conducted by the ______.A.CCSB.Occupational Safety and Health AdministrationC.MSA OF CHINAD.CCIC

考题 ______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed

考题 To "shore up" the main deck for the stowage of deck cargo means to ______.A.weld pad eyes on deck in proper position to secure the cargoB.strengthen the main deck by placing pillars underneath it in the tween-decksC.distribute the weight of the cargo by placing fore-and-aft planks on the main deckD.package the cargo in wooden crates so it will not damage the deck

考题 Which statement(s) is/are TRUE concerning crane cargo operations?A.Do not exceed rated load capacity of crane and container spreader or slingsB.During any cargo handling operation,the safety of personnel is paramountC.Cargo handlers must be outfitted with adequate protection from personal injuryD.All the above

考题 Which statement is FALSE regarding the operation of a crane ________.A.The crane jib is raised and lowered by the luffing winchB.The cargo block is raised and lowered by the hoisting winchC.The cargo block is raised and lowered by the luffing winchD.None of the above

考题 In Cargo Survey,O.B.Q.refers to ______.A.own bank quoteB.on board qualityC.on-delivery bank quoteD.on board quantity

考题 In Cargo Survey,T.C.V.refers to ______.A.total calculated volumeB.terminal cargo volumeC.tank cargo valveD.tolerance of cargo valve

考题 VESSEL’S EXPERIENCE FACTOR is likely used in ______ cargo survey report.A.generalB.liquidC.containerD.heavy

考题 WCF TB 11 is likely used in ______ cargo survey report.A.generalB.liquidC.containerD.heavy

考题 By regulation,cargo tank atmosphere must be inert before and during which operation ________.A.StrippingB.LoadingC.CleaningD.All of the above

考题 You are on a tanker discharging oil.When all of the oil that the main cargo pumps can handle is pumped out of a tank,the remainder is ______.A.Stripped out and pumped directly ashore into the mainline as the remaining cargo tanks are pumped out with the main pumpsB.Stripped to one tank and then pumped out with the main pumpsC.Stripped out and pumped directly ashore after all the tanks have been emptied by the main pumpsD.Gravitated to the centers from the wings and pumped out with the main pumps

考题 材料:A Passenger Ship Safety Certificate shall be issued for a period not exceeding 12 months.A Cargo Ship Safety Construction Certificate,Cargo Ship Safety Equipment Certificate and Cargo Ship Safety Radio Certificate shall be issued for a period specified by the Administration which shall not exceed five years.An Exemption Certificate shall not be valid for longer than the period of the certificate to which it refers.(i)When the renewal survey is completed within three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;(ii)When the renewal survey is completed after the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:(1)for a passenger ship,a date not exceeding 12 months from the date of expiry of the existing certificate;(2)for a cargo ship,a date not exceeding five years from the date of expiry of the existing certificate;(iii)when the renewal survey is completed more than three months before the expiry date of the existing certificate,the new certificate shall be valid from the date of completion of the renewal survey to:(1)for a passenger ship,a date not exceeding 12 months from the date of completion of the renewal survey;(2)for a cargo ship,a date not exceeding five years from the date of completion of the renewal survey.问题:The valid period of an Exemption Certificate for Cargo Ship Safety Equipment Certificate shall be ________.A.longer than five yearsB.shorter than five yearsC.longer than 12 monthsD.shorter than 12 monthsWhen the renewal survey is completed within one month before the expiry date of the existing Cargo Ship Safety Construction Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificateB.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificateC.from the date of expiry of the existing certificate to a date not exceeding 12 months from the dateD.from the date of expiry of the existing certificate to a date not exceeding five years from the dateIt can be concluded that the actual period of validity of a new Passenger Ship Safety Certificate is less than 12 months if the renewal survey is completed ________.A.4 months before its expiry dateB.3 months before its expiry dateC.2 months before its expiry dateD.after its expiry dateWhen the renewal survey is completed on a date which is 99 days before the expiry date of the existing Cargo Ship Safety Radio Certificate,the new certificate shall be valid ________.A.from the date of completion of the renewal survey to a date not exceeding 12 months from the date of expiry of the existing certificateB.from the date of completion of the renewal survey to a date not exceeding five years from the date of expiry of the existing certificateC.from the date of expiry of the existing certificate to a date not exceeding 12 months from the dateD.from the date of completion of the renewal survey to a date not exceeding five years from that date请帮忙给出每个问题的正确答案和分析,谢谢!

考题 单选题In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A is notB has notC do notD does not

考题 单选题Loading cargo operation in hold No.3 stopped owing to().A gangs employedB windlass troubleC gangs unavailableD shortage of navigational charts

考题 单选题Proper operation of the main engine reduction gear set requires the operation to monitor ()A the sump oil levelB oil flow sight glassesC bearing temperaturesD all of the above

考题 单选题Refrigeration machinery is often surveyed before loading reefer cargo. This survey is usually performed by the().A MSAB CCSC CCIQD local port authority

考题 单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().A Put all the remaining cargo on starboard sideB Put light cargo on starboardside and heavy cargo on port sideC Put light cargo on port side and heavy cargo on starboard sideD A,B,C are all correct

考题 单选题A survey of refrigerated cargo,to certify that proper methods of stowage were utilized,can be conducted by the().A CCSB Occupational Safety and Health AdministrationC MSA OF CHINAD CCIC

考题 单选题By regulation,cargo tank atmosphere must be inert before and during which operation?()A StrippingB LoadingC CleaningD All of the above

考题 单选题Statutory survey could be divided into two kinds, they are ()A first survey and certificate exchange surveyB first survey and operation surveyC first survey and periodic surveyD classification survey and certificate exchange survey

考题 单选题()is known as a long hatch during loading operation.A The largest hatch of a shipB The hatch that is double riggedC The hatch where a disproportionate amount of cargo is atowedD The hatch where the most cargo is stowed

考题 单选题To “shore up” the main deck for the stowage of deck cargo means to().A weld pad eyes on deck in proper position to secure the cargoB strengthen the main deck by placing pillars underneath it in the tween-decksC distribute the weight of the cargo by placing fore-and-aft planks on the main deckD package the cargo in wooden crates so it will not damage the deck

考题 单选题A survey of refrigerated cargo,to certify that proper methods of stowage were utilized,can be conducted by the().A ABSB Occupational Safety and Health AdministrationC MSAD National Cargo Bureau

考题 单选题For existing ships,()is not an improvement to safety.A the reinforcement of the aft transverse watertight bulkheadB the double bottom structure in way of the foremost cargo holdC the introduction of a more rigorous survey regime and greater attention to operating proceduresD introduction of new and improved designs

考题 单选题Which organization would conduct a survey of the insulation in a reefer compartment prior to loading cargo? ()A PRC Customs ServiceB OSHAC CCSD CCIQ

考题 单选题The follow-up survey’ of the result has shown that the ______ operation was a great success.A transitionB transplantC transportationD transference