网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()
- A、Verify the ISV application runs on AIX 5.2
- B、Power4 to POWER5 upgrades are not supported without a application recompile
- C、Check the placement and size of the boot logical volume and disk space requirements on the S85
- D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
参考答案
更多 “Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A、Verify the ISV application runs on AIX 5.2B、Power4 to POWER5 upgrades are not supported without a application recompileC、Check the placement and size of the boot logical volume and disk space requirements on the S85D、AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked” 相关考题
考题
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
考题
A solution for two batch applications was proposed in Companycom meeting. They are currently running in two LPARs on a p690. On a daily basis, both applications use 15% of the machine for their workload, and increase to 100% when their weekly reports are run. Since the reports are not run on the same day, what is the best solution?()A、CODB、DLPARC、One big LPARD、Two separate p690 machines
考题
Companycom has restored their mksysb. They notice that the external volume groups cannot be seen. What should be done to access the volume groups?()A、Run importvg commandB、Run synclvodm commandC、Recreate volume groupsD、Update /etc/filesystems
考题
Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization
考题
After rebooting the machine, Companycom notices that the machine is not performing as well as before. The applications are running slower, and their CPU utilization has increased. How can the customer check to see if a CPU was deallocated?()A、Run the vmstat commandB、Run the iostat commandC、Run the lparstat commandD、Check the logs in the /var/adm/ras directory
考题
Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A、128B、254C、320D、640
考题
Companycom has plans to deploy a large database solution. Their primary requirement is minimal user access downtime. They are comparing a single server implementation with a two server deployment. What solution would they use to avoid downtime for OS software maintenance?()A、Apply OS updates once a yearB、Utilize a GPFS cluster solutionC、Implement a two server deployment with HACMPD、Install a single server implementation with HACMP failover to a second LPAR
考题
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()A、LoadlevelerB、AIX Workload ManagerC、Partition Load ManagerD、Tivoli Provisioning Manager
考题
While planning the logical volume design of a new install, Companycom considered using a striped logical volume for performance. They want to be able to extend the logical volume in the future. Which of the following actions will provide this capability?()A、Add additional logical volumes two at a timeB、Add additional physical volumes two at a timeC、Create a columned striped logical volume using -C option of mklvD、Create an extendable striped logical volume using -E option of mklv
考题
单选题Companycom is planning for a 64-way p5 595. The plan is to use Virtual IO Servers and micropartitioning. What is the maximum number of partitions they can allocate?()A
128B
254C
320D
640
考题
单选题Companycom has a p5 595 with no DVD configured on this server. How can they install the Virtual IO Server code?()A
From the HMCB
From a NFS mountC
From a FTP serverD
From any CD or DVD drive on another server
考题
单选题Companycom purchased a p5 570 with no plans to partition. The customer plans to use the ASMI interface to power on and off the machine. How can ASMI be accessed without a HMC?()A
By typing diags and then going to the ASMI menusB
Through SSH from a TCP/IP connection on the serverC
Through WebSM which is connected to a system Ethernet portD
By connecting through a web browser to an HMC Ethernet port
考题
单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A
One single port Ethernet adapterB
Four dual port Ethernet adaptersC
Two single port Ethernet adaptersD
Eight single port Ethernet adapters
热门标签
最新试卷