An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()
- A、LPAR Planning Tool.
- B、System Planning Tool.
- C、LPAR Validation Tool.
- D、System Validation Tool.
参考答案
更多 “An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.” 相关考题
考题
An administrator wants to deploy a complex LPARenvironment on a 595.What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A.LPAR Planning Tool.B.System Planning Tool.C.LPAR Validation Tool.D.System Validation Tool.
考题
A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()A、DLPAR functions are not available for cloned partitionsB、The new partition has the same node number as the original LPARC、Additional filesets need to be reinstalled after the alt_disk_install cloningD、The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
考题
When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()A、Use the Workload Estimator capacity planning tool.B、Use prtconf output from legacy systems.C、Use the LPAR Validation Tool.D、Use Performance Management Services.
考题
Company.com wants to put two Micro-Partitions on a p5-570 and attach to a SAN. What is the best LPAR configuration to maximize SAN availability using four Host Bus Adapters (HBAs)?()A、Two HBAs assigned to each redundant VIOS which provides VSCSI access to LUNsB、Two HBAs assigned to each LPAR with each LPAR owning HBAs on the same PCI bussesC、Two HBAs assigned to each LPAR with each LPAR owning HBAs on separate PCI bussesD、One HBA assigned to each LPAR and two HBAs assigned to a VIOS providing VSCSI access to LUNs
考题
An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()A、 Maxperm% is set too low on LPAR 2B、 Insufficient paging space on LPAR 1C、 Service IBM.DRM is unavailable on LPAR 1D、 Insufficient pinnable memory frames available on LPAR 2
考题
Companycom has a p5 590 that has their production LPAR, their Tivoli Storage Manager (TSM) LPAR, and several other LPARs. What method would provide connectivity between the production LPAR, and the TSM LPAR, but be isolated from the other LPARs in the system without utilizing a Virtual IO Server or physical adapter resources?()A、Use shared memory and semaphores to transfer the data to the TSM LPARB、Provide gigabit Ethernet adapters in each LPAR and run a crossover cableC、Create a Virtual Ethernet between the production server and the TSM LPARsD、Create a Virtual Ethernet between the TSM server LPAR and the non-production LPARs
考题
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
考题
Which command should the administrator use to display the IPL progress/LED code of the partition?()A、lsled -m System -r lpar B、lsrefcode -m System -r lpar C、lshwinfo -m System -r led_code D、lssyscfg -m System -r sys -F lpar_name,led_code
考题
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C、Smallest partition one processor, as small 1% of a processor may be transferred.D、Smallest partition one core, as small 10% of a processor may be transferred.
考题
An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A、LPAR Planning Tool.B、System Planning Tool.C、LPAR Validation Tool.D、System Validation Tool.
考题
An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()A、The adapter must be taken offline prior to the firmware update.B、The system has not been rebooted since the adapter was added to the LPAR.C、The adapter must be assigned to the service partition prior to updating the firmware.D、The adapter must be dynamically removed from the LPAR prior to updating thefirmware.
考题
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()A、Add or remove the resources in the profile, click 'apply', then 'save'.B、Add or remove the resources using DLPAR and change the partition profile.C、Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.D、Add or remove the resources in the system profile and reboot the managed system.
考题
What type of configuration can provide the best availability in a Virtual IO Server environment?()A、Provide multiple paths to all resources through 2 or more Virtual IO ServersB、Mirror all disk resources on the Virtual IO Server to present to the client LPARC、Mirror all disk resources on the client LPAR to the shared SCSI on the Virtual IO ServerD、Trunk multiple Ethernet adapters on the Virtual IO Server to a single Shared Ethernet Adapter (SEA)
考题
A resource was dynamically assigned to an LPAR. The customer wants to make the assignment permanent. What does the technical specialist need to do to reconfigure the LPARs to make the assignment permanent?()A、Reboot the source LPAR.B、Remove the resource from the source LPAR.C、Rediscover the managed system from the HMC.D、Add the resource to the profile of the LPAR.
考题
During the pre-installation planning of a customer’s recently purchased IBM System Storage DS8700 the port configuration, cabling, and disk layout were discussed. What other topic should be discussed in this solution review()A、LPAR capacity planningB、logical volume configurationC、data migration processD、audit hosts for HBA worldwide port names
考题
Companycom LPAR that is using a Virtual IO Server needs to be more highly available. How can this be accomplished using APV features?()A、Reallocate the Virtual IO Server disks to the user LPARB、Create a stripe-group within the Virtual IO Server to protect against disk failureC、Reconfigure the user LPAR to use both locally owned disk and a Virtual SCSI diskD、Create a second Virtual IO Server and reconfigure the user LPAR to mirror across both Virtual IO Servers
考题
Companycom is planning a p5 595 running AIX 5L 5.3 LPARs. They would like to design the system using physical resources with maximum resource efficiency. One LPAR requires a peak load of 30 processors during the week with a low of 1 processor required on the weekend. The other LPAR requires only a single processor most of the time, but needs at least 24 processors at the beginning of the weekend to finish its weekly processing in the window allocated. Which of the following solutions is most appropriate to continuously maximize resource use for these two LPARs?()A、Dynamic LPARB、Workload ManagerC、Partition Load ManagerD、Shared Processor Pools
考题
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A、The LPAR Configuration backup is corruptB、The LPAR Configuration has been altered using DLPARC、The LPAR Configuration backup was performed on a different HMCD、The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
考题
单选题When planning for a logically partitioned system,which of the following should be used as part of a review to ensure that each partition has the required resources? ()A
Use the Workload Estimator capacity planning tool.B
Use prtconf output from legacy systems.C
Use the LPAR Validation Tool.D
Use Performance Management Services.
考题
单选题A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()A
DLPAR functions are not available for cloned partitionsB
The new partition has the same node number as the original LPARC
Additional filesets need to be reinstalled after the alt_disk_install cloningD
The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
考题
单选题An administrator has implemented the following LPARs on a Power 570 with 32 GB memory with 512 MB remaining for allocation: LPAR 1 memory : min = 10 GB des = 15 GB max = 24 GB LPAR 2memory : min = 10 GB des = 15 GB max = 24 GB The administrator receives a request to add 2 GB to LPAR 1. The only way to do this is by moving memory from LPAR 2 to LPAR 1. The administrator attempts to move the memory, but the operation fails. The administrator can however allocate 512 MB that is free to LPAR 1 on the 570. What is the most likely cause of this failure when dynamically moving memory?()A
Maxperm% is set too low on LPAR 2B
Insufficient paging space on LPAR 1C
Service IBM.DRM is unavailable on LPAR 1D
Insufficient pinnable memory frames available on LPAR 2
考题
单选题System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()A
The LPAR Configuration backup is corruptB
The LPAR Configuration has been altered using DLPARC
The LPAR Configuration backup was performed on a different HMCD
The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed
考题
单选题An administrator wants to deploy a complex LPAR environment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A
LPAR Planning Tool.B
System Planning Tool.C
LPAR Validation Tool.D
System Validation Tool.
考题
单选题An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system, but received an error. What is the most likely cause of the problem?()A
The adapter must be taken offline prior to the firmware update.B
The system has not been rebooted since the adapter was added to the LPAR.C
The adapter must be assigned to the service partition prior to updating the firmware.D
The adapter must be dynamically removed from the LPAR prior to updating thefirmware.
考题
单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
考题
单选题An administrator wants to deploy a complex LPARenvironment on a 595. What is the most current tool available for documenting the proposed LPAR configuration and determining if there are adequate IO resources?()A
LPAR Planning Tool.B
System Planning Tool.C
LPAR Validation Tool.D
System Validation Tool.