网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A technician is going to install a gigabit Ethernet adapter into a laptop for a customer. Which of the following technologies is MOST likely being used in this installation?()
- A、Express card 54
- B、USB 2.0
- C、PCIe
- D、Port replicator
参考答案
更多 “A technician is going to install a gigabit Ethernet adapter into a laptop for a customer. Which of the following technologies is MOST likely being used in this installation?()A、Express card 54B、USB 2.0C、PCIeD、Port replicator” 相关考题
考题
A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A. Backup power generatorB. Uninterruptable power supplyC. Power line conditionersD. Surge protectors
考题
A technician discovers that RAM modules are overheating. Which of following is best practice inthis situation?()
A. Install heatsinks on the RAM modules.B. Install additional CPU fans.C. Replace the RAM slots.D. Install a heatsink on the chipset driver
考题
Which of the following will allow a technician to extend a partition?()
A. Set the drive up as basicB. Format the drive to FAT32C. Install a second hard driveD. Set the drive as dynamic
考题
A technician at a small business goes into the server room to perform maintenance on a server and notices it is very hot and audible alarms are going off. The technician is unsure of how to remedy the situation. Which of the following should the technician do?()A、Turn off all the equipment in the server closetB、Install a fan in the server closetC、Turn off the power to the server closetD、Follow escalation procedures for emergencies
考题
A user wants to install an external hard drive using the fastest connection available. Which of the following should the technician recommend?()A、USB 1.1B、eSATAC、USB 2.0D、IEEE 1394
考题
A technician has just finished installing a new server into a server rack. Which of the following should the technician do NEXT to complete the installation documentation?()A、Update drivers, update operating system (e.g. Windows Update), create server baseline, createa new network diagram, update change management proceduresB、Create server baseline, label server, store vendor-specific documentation, update networkdiagrams, update asset tracking informationC、Create server baseline, assign server roles, install tape drive, delete network diagram, labelserver, update operating system (e.g. Windows Update)D、Install applications on server, install external drives, toss vendor-specific documentation,update network diagrams
考题
A technician purchases a new 120 GB IDE hard disk to use in an old server as a swap drive. After adding the drive to the server, the technician discovers that the operating system does not detect the drive. After rebooting the server, the technician notices the drive is missing from POST and comes to the conclusion that the BIOS needs to be updated. The technician downloads the latest version of the BIOS update from the manufacturer website. Which action should the technician take next?()A、 backup the BIOS configuration to use laterB、 install the BIOS update from a command promptC、 create a bootable floppy and copy the BIOS update tools to the floppyD、 read the manufacturer’s guidelines and recommendations on installing the update
考题
A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()A、Flash DriveB、DVD-RWC、CD-ROMD、SSD
考题
A technician receives a new printer for repair and the work order states that when powered on the printer makes a loud noise and will not print. Which of the following actions should the technician take? ()A、Install new drivers on the computer.B、Install a new ink cartridge.C、Install a print head on the printer.D、Remove the packing tape from the print head.
考题
If an external monitor is attached to a laptop and it does not work, which of the following actions should a technician take FIRST?()A、Re-install the operating system.B、Open and close the cover.C、Use the function key to activate the monitor.D、Install new software for the keyboard.
考题
A technician discovers that RAM modules are overheating. Which of following is best practice inthis situation?()A、Install heatsinks on the RAM modules.B、Install additional CPU fans.C、Replace the RAM slots.D、Install a heatsink on the chipset driver
考题
A technician installed a new application on a Windows XP desktop. After the application wasinstalled, the technician rebooted the desktop and received a bluescreen error. Which of thefollowing steps should the technician perform?() (Select TWO).A、Boot into Safe ModeB、Replace the motherboardC、Uninstall the applicationD、Replace the hard driveE、Install more RAM
考题
A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()A、 0B、 1C、 4D、 7
考题
A technician is dispatched to install additional RAM in a computer. The technician unplugs thesystem from the power source, and removes the cover of the PC. Which of the following shouldthe technician do NEXT?()A、Update the BIOS for compatibility.B、Put on an ESD strap.C、Use an anti-static bag to hold the RAM while installing.D、Clean out the PC with compressed air.
考题
A technician installed a new motherboard in a workstation. Which of the following describes theBEST steps for a proper installation?()A、Install the OS, the application software and then hardware drivers.B、Install the chipset driver, the OS and then the hardware drivers.C、Install the hardware drivers, the chipset driver and then the OS.D、Install the OS, the chipset driver and then the hardware drivers.
考题
A technician has replaced a video card with another manufacturer’s video card. The driverinstallation does not complete. Which of the following steps should the technician take FIRST?()A、Roll back the driver.B、Install the original video card and reboot.C、Delete the monitor.D、Remove the video card and reboot.
考题
A technician temporarily needs an additional network connection in their office to test a newworkstation. Which of the following is the BEST solution to add a temporary network connection?()A、Install a small network switchB、Use port mirroring on the switchC、Split the pairs of the existing jackD、Install a CSU/DSU
考题
A technician is responsible for overseeing twelve remote offices. There was a report of a power outage at one of the remote offices the night before, and now one of the servers there has not rebootedeven though it was shut down gracefully. The technician was forced to travel two hours just to turn theserver on. Which of the following is the MOST cost effective way to prevent future travel?()A、 Install a generator onsite.B、 Install a remote management card in the server.C、 Install an uninterruptible power supply (UPS) onsite.D、 Move the server to the main office.
考题
A client asks a technician to add a DVD+R burner to a computer system. The technician does this and successfully tests the drive. Three weeks later, the client calls and says that the burner is no longer working. The technician learns that the drive reads CDs and DVDs, but will no longer burn DVDs. When arriving on site, what is the FIRST action that the technician should take?()A、check for a faulty IDE cableB、be sure that the DVD+R is formatted before using itC、check for incompatible mediaD、re-install the DVD burning software
考题
Which of the following will allow a technician to extend a partition?()A、Set the drive up as basicB、Format the drive to FAT32C、Install a second hard driveD、Set the drive as dynamic
考题
单选题A client asks a technician to add a DVD+R burner to a computer system. The technician does this and successfully tests the drive. Three weeks later, the client calls and says that the burner is no longer working. The technician learns that the drive reads CDs and DVDs, but will no longer burn DVDs. When arriving on site, what is the FIRST action that the technician should take?()A
check for a faulty IDE cableB
be sure that the DVD+R is formatted before using itC
check for incompatible mediaD
re-install the DVD burning software
考题
单选题A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()A
0B
1C
4D
7
考题
单选题A technician at a small business goes into the server room to perform maintenance on a server and notices it is very hot and audible alarms are going off. The technician is unsure of how to remedy the situation. Which of the following should the technician do?()A
Turn off all the equipment in the server closetB
Install a fan in the server closetC
Turn off the power to the server closetD
Follow escalation procedures for emergencies
考题
单选题A technician with a Windows server would like to use Windows Software Update Services (WSUS)to deploy patches. Which of the following MUST the technician assign to the server to install WSUS?()A
DHCPB
IMAPC
DNSD
IIS
考题
单选题A customer requires a shock resistant mass storage device in their PC. Which of the following drives should the technician install?()A
Hard diskB
Solid stateC
FloppyD
Tape
考题
单选题A technician is building a Windows 2008 server and has installed a motherboard, processor, and power supply. Which of the following optical drives should the technician install?()A
Flash DriveB
DVD-RWC
CD-ROMD
SSD
考题
单选题A technician has been asked to ensure a PC is supplied with power for a short time, during apower failure. The technician should install which of the following devices to ensure thisrequirement is easily met?()A
Backup power generatorB
Uninterruptable power supplyC
Power line conditionersD
Surge protectors
热门标签
最新试卷