网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The recovery of funds of a commercial bank is ideally managed on a parallel with its expenditure.
A.Right
B.Wrong
C.Doesn't say
参考答案
更多 “ The recovery of funds of a commercial bank is ideally managed on a parallel with its expenditure.A.RightB.WrongC.Doesn't say ” 相关考题
考题
Thisyearouruniversitydoesnothaveany_______tocontinuetheinternationalstudentexchangeprogram.A.functionB.fundamentalC.funeralD.funds
考题
单句理解听力原文:The interest rates on these small deposits are usually floating rates, and they are usually 2%- 5% below the bank's current base rates.(1)A.Bank's current base rates are higher than those on small deposits.B.Bank's current base rates are lower than those on small deposits.C.Bank's current base rates are not floating rates.D.Bank's current base rates are usually floating rates.
考题
YoudecidetoenableFlashbackDatabaseinyourOracle10gdatabasesothatfuturerecoverieswilltakelesstimethantraditionalrecoveries.WhichofthefollowingparametersmustbeincludedinyourinitializationparameterfilebeforeenablingFlashbackDatabase?()A.DB_RECOVERY_FILE_DESTonlyB.DB_FLASHBACK_RETENTION_TARGETonlyC.DB_RECOVERY_FILE_DEST_SIZEandDB_RECOVERY_FILE_DESTonlyD.DB_RECOVERY_FILE_DESTandDB_FLASHBACK_RETENTION_TARGETonlyE.DB_RECOVERY_FILE_DEST_SIZE,DB_RECOVERY_FILE_DESTandF.DB_FLASHBACK_RETENTION_TARGET
考题
CMM(Capability Maturity Model)是由美国国防部DOD指定CMU的软件工程研究所SEI研究出来的一套过程规范,它将软件过程的成熟度分为(62)。A.Initial, Defined, Managed, Repeatable, OptimizingB.Initial, Repeatable, Managed, Defined, OptimizingC.Initial, Repeatable, Defined, Managed, OptimizingD.Initial, Managed, Defined, Repeatable, Optimizing
考题
Youneedtorecoverfivedatafilesthatarespreadacrossmultipledisks.Whichinitializationparametershouldyousettospeedupredoapplication?()
A.RECOVERY_PARALLELISMB.FAST_START_MTTR_TARGETC.LOG_CHECKPOINT_INTERVALD.FAST_START_PARALLEL_ROLLBACK
考题
下列有关中国银行的网址中正确的是()。
A.www.bank-of-chinA.com.cnB.www.bank-of-chinA.comC.www.bankofchinA.comD.www.bank_of_chinA.com
考题
Development is a structured design methodology that proceeds in a sequence from one phase to the next.A.Waterfall
B.Phased
C.Prototyping
D.Parallel
考题
MySQL 5.7中基于组提交的并行复制如何设置A.slave-parallel-type 设置为DATABASEB.slave-parallel-type 设置为LOGICAL_CLOCKC.master-parallel-type 设置为DATABASED.master-parallel-type 设置为LOGICAL_CLOCK
热门标签
最新试卷
![瑞牛题库 章节练习 历年真题 模拟试卷](http://assets.51tk.com/51_sidebar_right_index.jpg)