网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The ship’s centerline is the ()(龙骨).

  • A、frame
  • B、bulwark
  • C、keel
  • D、bulkhead

参考答案

更多 “The ship’s centerline is the ()(龙骨).A、frameB、bulwarkC、keelD、bulkhead” 相关考题
考题 “AMIDSHIPS ” refers to______.A.Back of the vesselB.The middle portion of a shipC.A backward movement of a vesselD.Across the ship, at right angles to the fore-and-aft centerline

考题 Transverse frames are more widely spaced on a ship that is designed with the ______.A.Centerline system of framingB.Isometric system of framingC.Longitudinal system of framingD.Transverse system of framing

考题 Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels ________.A.A centerline crane can never be operated in tandemB.One crane is able to work one end of two adjacent hatchesC.These cranes are more economical and weigh less than outboard-mounted cranesD.One crane is able to work both sides of the ship

考题 The keel is a ship’s centerline. ()A、船舶的中线是艉甲板。B、肋骨是船舶的中线。C、龙骨是船舶的中线。D、船舶的中线是正横。

考题 艏楼甲板位于船艏部。()A、Forecastle deck is located at the ship’s stern.B、Poop deck is located at the ship’s bow.C、Forecastle deck at located in the ship’s bow.D、Poop deck is located at the ship’s stern.

考题 从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.

考题 单选题The meaning of slacken her speed is().A increase ship's speedB slow down ship's speedC make up ship's speedD fix up shp's speed

考题 单选题The well preparation of stowage plan will().A increase the ship's officers' knowledgeB extend the ship's officers' knowledgeC improve the ship's cargo-handling equipmentD raise the working efficiency

考题 单选题Berthing means bringing a vessel to her berth until().A the ship is made fastB the ship‟s first line is sent ashoreC the ship is dredging anchorD the ship‟s pilot disembarks

考题 单选题Aboard a vessel,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A TCGB transverse momentC righting momentD transverse free surface moment

考题 单选题The shearing stresses on a ship’s structure are usually greatest at().A the bowB the sternC midshipsD the ship's quarter-length points

考题 单选题Aboard a vessel, multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in th eload’s().A TCGB transverse momentC righting momentD transverse free surface moment

考题 单选题Aboard a ship,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().A LCGB transverse momentC righting momentD inclining moment

考题 单选题The apparent wind can be zero when the true wind is from().A ahead and equal to the ship's speedB astern and equal to the ship's speedC ahead and equal to twice the ship's speedD astern and equal to twice the ship's speed

考题 单选题Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().A A centerline crane can never be operated in tandemB One crane is able to work one end of two adjacent hatchesC These cranes are more economical and weigh less than outboard-mounted cranesD One crane is able to work both sides of the ship

考题 单选题() are two vertical supports,usually steel,one each side of the centerline of the ship used to support booms.A ShroudsB King postsC StaysD Turnbuckles

考题 单选题A ship with the TCG off the longitudinal centerline inclines to an angle of().A listB heelC trimD loll

考题 单选题Those ship’s tanks that are particularly important for trimming the ship are the().A domesticsB settlersC deepsD peaks

考题 单选题当船舶停靠码头时,为了保证船货安全,有必要24小时值班。()A When a vessel is alongside the wharf, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.B When a vessel is alongside the wharf, t’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.C When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour deck watch to guarantee the safety of the ship and the cargo.D When a vessel is alongside the port, it’s necessary for the ship to keep a 24-hour gangway watch to guarantee the safety of the ship and the cargo.

考题 单选题The keel is a ship’s centerline. ()A 船舶的中线是艉甲板。B 肋骨是船舶的中线。C 龙骨是船舶的中线。D 船舶的中线是正横。

考题 单选题To ensure the ship’s general stability,().A she's loaded a little deeper forwardB she's loaded a little deeper aftC she has not any ballast at allD the cargo is properly distributed throughout the ship

考题 单选题The Plimsoll mark on a vessel is used to().A align the vessel's tailshaftB determine the vessel's trimC determine the vessel's freeboardD locate the vessel's centerline

考题 单选题从水线到船底是“吃水”。()A “From the centerline to the ship’s bottom” is “draft”.B “From the keel to the ship’s bottom” is “draft”.C The maximum distance from the waterline to the ship’s bottom is “draft”.D “From the centerline to the ship’s main deck” is “draft”.

考题 单选题According to the Sale Contract,it’s of FOB plus S.T.term.It’s quite obvious that().A our ship is not responsible for trimming and stowingB our ship is responsible for trimming and stowingC our ship is responsible for expensesD our ship is not responsible for expenses

考题 单选题“AMIDSHIPS” refers to ().A back of the vesselB the middle portion of a shipC a backward movement of a vesselD across the ship, at right angles to the fore-and-aft centerline

考题 单选题The loading of the ship must be done in accordance with().A the ship’s instructionsB the terminal’s instructionsC the port captain’s instructionsD the charterer’s instructions

考题 单选题The signal given to commence lowering the lifeboats is().A 3 short blasts of the ship's whistleB 1 short blast of the ship's whistleC 3 long blasts of the ship's whistleD 1 long blast of the ship's whistle