网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Dismantle and check the cargo runner.()

  • A、修理并检查吊货滑车。
  • B、拆卸并检查吊货滑车。
  • C、拆卸并检查吊杆。
  • D、修理并检查吊杆。

参考答案

更多 “Dismantle and check the cargo runner.()A、修理并检查吊货滑车。B、拆卸并检查吊货滑车。C、拆卸并检查吊杆。D、修理并检查吊杆。” 相关考题
考题 此时的交易策略应该为( )。A.单边买人Ru0809B.单边买入Ru0805 C.单边卖出Ru0809D.单边卖出Ru0805

考题 应变式传感器采用半桥差动等臂电桥转换电路时,若电源电压为U时,其输出电压Uo为( )。 A.(∆RU)/(2R)B.(∆RU)/(4R)C.(∆RU)/(R)D.(∆RU)/(8R)

考题 The valve on the discharge side of a cargo pump on a tank vessel will usually be a ______.A.butterfly valveB.spectacle valveC.check valveD.globe valve

考题 To determine which grades of cargo a tank vessel is permitted to carry you should ______.A.refer to the vessel's Certificate of InspectionB.examine the cargo tanks and fittingsC.ask the terminal supervisor or his representativeD.check the loading order

考题 In accordance with LOF,the owners of the vessel their Servants and Agents shall use their best endeavours to ensure that ______.A.the cargo owners provide their proportion of security before the cargo is releasedB.the cargo owners provide their proportion of security after the cargo is releasedC.the cargo owners dose not provide their proportion of security before the cargo is releasedD.the cargo owners does not provide their proportion of security after the cargo is released

考题 During the process of loading,damages to cargo can be reduced to minimum by ______.A.Shippers who deliver the cargo to the ship on timeB.Stevedores who handle the cargo with cautionC.Ship's crew members who check the cargo in regular intervalsD.Consignees who take good care of the cargo

考题 Bulk cargo refers to ______.A.cargo which occupies a large volume of spaceB.cargo which requires refrigerationC.cargo which is very denseD.homogeneous cargo not enclosed in a container

考题 Ru(人均旅游收入)与Rt(旅游总收入)之间关系的下列哪种情形可以直接推断出旅游总收入的增加主要来源于非基本旅游收入的大幅增长?()A、Rt与Ru同方向、同比例变化B、Rt与Ru同方向变化,但Rt增速超过RuC、Rt与Ru同方向变化,但Ru增速超过RtD、Rt与Ru反方向、同比例变化

考题 吊货网兜()A、cargo runnerB、cargo netC、cargo wireD、cargo chain

考题 Cargo may be divided into two basic types:().A、bulk cargo and container cargoB、bulk cargo and general cargoC、bulk cargo and liquid cargoD、dry cargo and liquid cargo

考题 Which of the following is not dangerous cargo?()A、Coal.B、Explosive cargo.C、Flammable cargo.D、Poisonous cargo.

考题 湿货要远离干货。()A、Wet cargo must be kept away from dry cargo.B、Heavy cargo must be kept away from dry cargo.C、Light cargo must be kept away from dry cargo.D、Wet cargo must be kept away from light cargo.

考题 The blocks and gooseneck of the jumbo need ().A、dismantling and inspectingB、dismantled and inspectedC、to dismantle and inspectD、dismantle and inspect

考题 货钩()A、cargo chainB、cargo trayC、cargo hookD、can hook

考题 Duty sailors will consider the conditions of (装卸货)().A、cargo handledB、cargo handlesC、cargo handleD、cargo handling

考题 导致RRUdisabled的原因可能有()A、光模块异常B、RU未加电C、DU到RU的物理连线异常D、RU硬件错误

考题 RU驻波比告警,通常是由下面()两种情况触发的?A、天馈连接问题B、RU不匹配C、BBU和RU光纤连接问题D、RU与CC板通信故障

考题 单选题When measuring the oxygen content of the cargo tanks prior to loading cargoes requiring vapor recovery,check it().A one meter from the tank bottom and one meter below the tank topB one half the ullage of the tank and one meter below the tank topC one half the ullage of the tank and one meter above the tank bottomD at three meter intervals from the tank top to the bottom

考题 单选题Ship’s officers should check every cargo compartment after it is filled with bulk grain to ensure().A all lighting circuits are energizedB all void spaces are filledC the correct grade of cargo has been loadedD the heavier grade is in the lower hold

考题 单选题“Stand by an engine” means ()A “prepare to stop the engine”B “assemble an engine on its bedplate”C “make an engine ready for starting”D “dismantle an engine”

考题 单选题During the process of loading, damages to cargo can be reduced to minimum by().A shippers who deliver the cargo to the ship on timeB stevedores who handle the cargo with cautionC ship's crew members who check the cargo in regular intervalsD consig ees who take goo care of the cargo

考题 单选题I am afraid you can’t dismantle the equipment in that way ().A in the caseB in any caseC in no caseD in case

考题 单选题The blocks and gooseneck of the jumbo need ().A dismantling and inspectingB dismantled and inspectedC to dismantle and inspectD dismantle and inspect

考题 单选题()cargo means to check all cargo loaded into or discharged from a vessel.A TallyingB ExaminingC WeighingD Handling

考题 单选题我们每航次拆卸一次吊杆。()A We dismantle the jumbo boom twice a voyage.B We dismantle the derricks once a voyage.C We examine the derricks once a voyage.D We dismantle the heavy derricks once a voyage.

考题 单选题Dismantle and check the cargo runner.()A 修理并检查吊货滑车。B 拆卸并检查吊货滑车。C 拆卸并检查吊杆。D 修理并检查吊杆。

考题 单选题The check under shipowner’s organization made at the loading port is to avoid accepting cargo()upon receipt.A in sufficient packingB in weak conditionC in correct numberD in good orde