During the process of loading,damages to cargo can be reduced to minimum by ______.
A.Shippers who deliver the cargo to the ship on time
B.Stevedores who handle the cargo with caution
C.Ship's crew members who check the cargo in regular intervals
D.Consignees who take good care of the cargo
参考答案
更多 “ During the process of loading,damages to cargo can be reduced to minimum by ______.A.Shippers who deliver the cargo to the ship on timeB.Stevedores who handle the cargo with cautionC.Ship's crew members who check the cargo in regular intervalsD.Consignees who take good care of the cargo ” 相关考题
考题
For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of ______.A.three barrelsB.four barrelsC.six barrelsD.eight barrels
考题
Please kindly arrange for shore workers to do ______ during loading the heavy cargo on deck as soon as possible.A.the work of using lines and chains to secure the cargo on boardB.the lash workC.the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD.the lashing work
考题
______ is known as a long hatch during loading operation.A.The largest hatch of a shipB.The hatch that is double riggedC.The hatch where a disproportionate amount of cargo is stowedD.The hatch where the most cargo is stowed
考题
In most cases,the mere reception or dumping down of the cargo on the ship ______ involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A.is notB.has notC.do notD.does not
考题
In accordance with Sinotime,the Charterers will not be responsible for the expenses of __________.A.all lubricating oil and waterB.insurance of the VesselC.losses of and damages to both vessel and cargo due to whatsoever reason occurred during the charter timeD.drydocking,repairs and other maintenance of the Vessel
考题
Where the cargo can be loaded in two different ways,one of which is more economical of space than the other,but each of which is a usual method of loading cargo of the relevant type,the Charterer ______ in whichever of these ways he pleases,unless he is expressly forbidden so to do by the charter-party.A.Has to loadB.Can loadC.LoadsD.Is loaded by
考题
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition
考题
During the planning stage of cargo operations,stress and displacement calculations should be carried out at incremental steps commensurate with the number of _____ and loading sequence of the proposed operation.A.coefficient of loadingB.stowage factorsC.ordersD.pours
考题
Bonding cables are used during cargo transfer to ______.A.provide safe electrical power connection to barge equipmentB.keep the vessel from surging excessivelyC.prevent an accidental discharge of static electricityD.secure the cargo hose to a hatch when loading overall
考题
单选题Petroleum cargo tanks should not be topped off at deck level when loading on a cold day because().A
a subsequent temperature rise will cause the cargo to overflowB
air pockets may cause the cargo to bubble out of the ullage holeC
the increased viscosity of the product requires higher loading pressure which increases the chances of a spillD
the tank valve may be stiff and a spill will occur before the valve can be closed
考题
单选题In most cases,the mere reception or dumping down of the cargo on the ship()involve completion of loading,because the operation of loading involves all that is required to put the cargo in a condition in which it can be carried.A
is notB
has notC
do notD
does not
考题
单选题During loading and discharging operations,in addition to when the cargo tanks have been properly filled,each inert gas system must be capable of maintaining a minimum gas pressure of().A
150 millimeters of water pressureB
125 millimeters of water pressureC
100 millimeters of water pressureD
75 millimeters of water pressure
考题
单选题When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().A
remove an existing list that would slow down cargo operationsB
initiate loading in conjunction with unloading at the hatchC
improve stability during cargo operationsD
allow longshoremen easy access to the hatch
考题
单选题During the process of loading, damages to cargo can be reduced to minimum by().A
shippers who deliver the cargo to the ship on timeB
stevedores who handle the cargo with cautionC
ship's crew members who check the cargo in regular intervalsD
consig ees who take goo care of the cargo
考题
单选题A ship is responsible for the cargo loaded or unloaded().A
only when the cargo is within its railB
after the cargo is checked by tallymenC
as soon as the cargo loading or unloading beginsD
during the time when loading or unloading is going on
考题
单选题Stress on the topping lift of a swinging boom can be reduced by().A
rigging a back stayB
raising the boomC
increasing the mechanical advantage of the cargo purchaseD
taking all slack out of the preventer
考题
单选题A cargo tank that is initially gas freed,can be inerted by introducing inert gas by a process known as().A
dilutionB
displacementC
precipitationD
Either A or B
考题
单选题()is known as a long hatch during loading operation.A
The largest hatch of a shipB
The hatch that is double riggedC
The hatch where a disproportionate amount of cargo is atowedD
The hatch where the most cargo is stowed
考题
单选题Please arrnge for the workers to do the()work during loading the trucks and heavy cargo on the ship, and also supply the necessary materials for the work.A
lashingB
shiftingC
liftingD
tallying
考题
单选题For the purposes of cargo oil containment,the fixed container under the manifold of an eight-inch loading line must hold a minimum of().A
three barrelsB
four barrelsC
six barrelsD
eight barrels
考题
单选题Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.A
the work of using lines and chains to secure the cargo on boardB
the lash workC
the work of putting dunnage,keeping the cargo in position and not move when the ship is rolling and pitchingD
the lashing work
考题
多选题Which two of these statements describe important aspects of performing a wireless site survey? (Choose two.) ()AAn 802.11 g access point with a variety of antennas can be used in all standard site surveys.BSite surveys can be performed manually or through assisted site survey.CChannel power during testing starts at the default minimum and gradually increases to the maximum.DOverlapping access points can create performance problems.ESurveys should be done after hours in an office building or during reduced inventory levels in warehouses.
考题
单选题Bonding cables are used during cargo transfer to().A
provide safe electrical power connection to barge equipmentB
keep the vessel from surging excessivelyC
prevent an accidental discharge of static electricityD
secure the cargo hose to a hatch when loading overall
考题
单选题According to regulations,a cargo hose used for transferring liquefied gases must have a bursting pressure of().A
5 times the maximum working pressure on the hose during cargo transferB
one half the designed working pressureC
4 times the pressure of the cargo pump used for transferringD
5 times the minimum working pressure on the hose during cargo transfer
考题
单选题The most important principle in the cargo stowage is().A
to avoid the rearrangement of the cargo loaded on boardB
to ensure the safety of the ship and cargoC
to reject the damaged cargo during loading operationD
to prevent the spontaneous combustion of the coal and grain
考题
单选题我们正在装危险货。()A
We are loading flammable cargo.B
We are loading dangerous cargo.C
We are discharging flammable cargo.D
We are discharging dangerous cargo.