网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The valve on the discharge side of a cargo pump on a tank vessel will usually be a ______.
A.butterfly valve
B.spectacle valve
C.check valve
D.globe valve
参考答案
更多 “ The valve on the discharge side of a cargo pump on a tank vessel will usually be a ______.A.butterfly valveB.spectacle valveC.check valveD.globe valve ” 相关考题
考题
If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?A.Pump only if the discharge is led to a shore tank or bargeB.Pump only during the hours of darknessC.Pump only on the outgoing tideD.Pump only as much as is necessary
考题
Cargo transfer operations on a tank vessel need NOT be stopped when ______.A.a tug comes alongside while the tanker is loading grade D and E cargoesB.a large,fresh oil spill is discovered immediately adjacent to the side of the tankerC.there is an electrical storm in the vicinityD.there is a fire on the dock or on a nearby vessel
考题
You are carrying triethylamine,methyl methacrylate and isoprene in your multiple-product tanker. Which of the following statements is true?A.Isoprene may be carried in a cargo tank adjacent to either of the other two cargoesB.Methyl methacrylate may not be carried in a tank adjacent to a pump roomC.Methyl methacrylate must usually be heated to maintain its stabilityD.Portable thermometers are not permitted to be used to take the cargo temperature of triethylamine
考题
If you must pump bilges while a vessel is in port,you should pump only ______.A.If discharge is led to a shore tank or bargeB.During the hours of darknessC.On the outgoing tideD.As much as is necessary
考题
Which method should be used to warm up the pump turbines prior to discharge ________.A.Lock the turbine rotor and slowly bleed in steam until operating temperature is reachedB.Run the pump at high speed with the discharge valves closedC.Run the turbine at slow speed with the pump disconnectedD.Shut the discharge valve and run the pump at slow speed
考题
A bonding cable should be connected for cargo operations aboard a tank vessel as soon as the ______.A.Cargo has been loaded or dischargedB.Cargo hose is connectedC.Cargo pumps are startedD.Vessel is ready to handle cargo
考题
Before discharge of cargo tank ballast is undertaken,______.A.the deck isolating valve is openB.flue gas isolating valveC.blower suction valveD.blower discharge valve
考题
Cargo pump relief valves are piped to the ______.A.cargo pump pressure gaugesB.crossover lines interconnecting two pumpsC.suction side of pumpsD.atmosphere through pump vents
考题
What is the purpose of the relief valve of a cargo pump ________.A.Provides for the removal of vaporsB.Allows two or more tanks to be filled at the same timeC.Provides for the emergency shutdown of the pumpD.Permits the return of cargo to the suction side of the pump
考题
Which statement is TRUE concerning deep well self-priming pumps ________.A.When loading oil cargo,it is always loaded via the discharge line through to the pump until the tank is topped offB.Stripping systems are generally eliminated for the purposes of cargo handlingC.In recent years deep well pumps have become increasingly unpopular in product tankers and medium size crude shipsD.There is no danger of damaging the pump from overheating
考题
You start a centrifugal cargo pump to discharge cargo.The pump works for a while and then loses suction.This could be caused by ______.A.The pump running backwardsB.Incomplete primingC.The discharge head being too highD.All of the above
考题
单选题Your vessel is taking on bunkers from a shore side facility, if oil begins flowing from one tank vent, which of the following actions should be taken FIRST?()A
Open the intake valve to an adjacent tankB
Set out drip pans and sawdust and begin to mop up the spillC
Signal the shore control point to shutdownD
Close the valve on the tank vent line
考题
单选题When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()A
Trip the pump relief valveB
Order the dock man to shut downC
Call the owner,operator,or terminal supervisorD
Run out the vessel's or terminal's fire hose
考题
单选题You are carrying triethylamine,methyl methacrylate and isoprene in your multiple-product tanker. Which of the following statements is true? ()A
Isoprene may be carried in a cargo tank adjacent to either of the other two cargoesB
Methyl methacrylate may not be carried in a tank adjacent to a pump roomC
Methyl methacrylate must usually be heated to maintain its stabilityD
Portable thermometers are not permitted to be used to take the cargo temperature of triethylamine
考题
单选题Cargo transfer operations on a tank vessel need NOT be stopped when().A
a tug comes alongside while the tanker is loading gradeB
and E cargoes B. a large,fresh oil spill is discovered immediately adjacent to the side of the tankerC
there is an electrical storm in the vicinityD
there is a fire on the dock or on a nearby vessel
考题
单选题Which method should be used to warm up the pump turbines prior to discharge().A
Lock the turbine rotor and slowly bleed in steam until operating temperature is reachedB
Run the pump at high speed with the discharge valves closedC
Run the turbine at slow speed with the pump disconnectedD
Shut the discharge valve and run the pump at slow speed
考题
单选题In setting the valves on a steam-smothering system on a tank vessel,the master control valve to cargo tanks should be().A
open and individual tank valves openB
open and the individual tank valves closedC
closed and the individual tank valves closedD
closed and the individual tank valves open
考题
单选题What action must be taken when an individual cargo tank is closed off from the inert gas system by the tank isolation valve?()A
The tank must be gas freedB
The tank must be ballastedC
The tank must be vented to the atmosphereD
The bypass valve must also be closed
考题
单选题If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?()A
Pump only if the discharge is led to a shore tank or bargeB
Pump only during the hours of darknessC
Pump only on the outgoing tideD
Pump only as much as is necessary
考题
单选题A relief valve for a cargo pump is generally installed().A
after the discharge valveB
between the pump and discharge valveC
after the suction valveD
between the pump and suction valve
考题
单选题The valve on the discharge side of a cargo pump on a tanker will usually be a().A
butterfly valveB
spectacle valveC
check valveD
globe valve
考题
单选题The simplest method to use for determining if a centrifugal pump is operating as designed, is to ().A
closely observe the pump discharge temperatureB
close off the discharge valve, and watch for a rise in pressureC
momentarily close off the suction valve, and watch for a rise in pressureD
use a clamp on ammeter and compare the readings to past records
考题
单选题What is the purpose of a relief valve?()A
to fill 2 tanks at the same timeB
to use pump at a higher pressureC
to return liquid to suction side if discharge valve is closedD
All of the above are true
考题
单选题The relief valve is located on the()A
discharge side of condenserB
discharge side of compressorC
outlet of the evaporatorD
receiver tank
考题
单选题The combined fan discharge rate in an inert gas system is related to the().A
shoreside loading rateB
maximum cargo pump discharge rateC
boiler forced draft fan rateD
size of the largest cargo tank
考题
单选题The valve on the discharge side of a cargo pump on a tank vessel will usually be a().A
butterfly valveB
spectacle valveC
check valveD
globe valve
考题
单选题If the relief valve on the discharge side of a hydraulic pump lifts, the cause could be ().A
a low load on the unitB
a clogged pump suction strainerC
a blockage in the line between the pump and hydraulic motorD
the hydraulic motor turning too fast
热门标签
最新试卷