网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).

A.You must set each end of the trunk line to IEEE 802.1e encapsulation.

B.You must set the same VTP management domain name on both switches.

C.You must set all ports on the two switches as access ports.

D.You must configure one of the switches as a VTP server.

E.You must use a rollover cable to connect the two switches.


参考答案

更多 “ A new switch is being installed in the Ezonexam network and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this? (Choose all that apply).A.You must set each end of the trunk line to IEEE 802.1e encapsulation.B.You must set the same VTP management domain name on both switches.C.You must set all ports on the two switches as access ports.D.You must configure one of the switches as a VTP server.E.You must use a rollover cable to connect the two switches. ” 相关考题
考题 You are an administrator of the Ezonexam switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in the Ezonexam network.However, you need to share the VLAN information across numerous switches. Which of the following would allow you accomplish this?A. STPB. GVRPC. SNMPD. VTPE. DHCPF. None of the above

考题 A new Ezonexam switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?A.All defined VLANs are allowed on the trunk by default.B.Each VLAN, or VLAN range, that is specified with the switchport mode command.C.Each VLAN, or VLAN range, that is specified with the vtp domain command.D.Each VLAN, or VLAN range, that is specified with the vlan database command.E.None of the above

考题 A new switch is installed in the Ezonexam network. This switch is to be configured so that VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network.Which of the conditions below have to be met in order for this to occur? (Choose all that apply).A. The switch that will share the VLAN information must be in the VTP Server mode.B. The switches must be in the same VTP domain.C. The switch that will share the VLAN information must be configured as the root bridge.D. The switches must be configured to use the same VTP version.E. The switches must be configured to use the same STP version.F. The switches must be configured to use the same type of ID tagging.G. The switches must be connected over VLAN trunks.

考题 You need to configure two Ezonexam switches to exchange VLAN information. Which protocol provides a method of sharing VLAN configuration information between these two switches?A. STPB. 802.1QC. VLSMD. ISLE. VTPF. HSRPG. None of the above

考题 You need to create a new VLAN on your Catalyst switch. This VLAN is to be named EZONEXAM. Which of the following need to be completed for the creation of this new VLAN? (Select all that apply)A. The EZONEXAM VLAN must be created.B. The desired ports must be added to the new EZONEXAM VLAN.C. The EZONEXAM VLAN must be added to all of the domains.D. The EZONEXAM VLAN must be named.E. An IP address must be configured for the EZONEXAM VLAN.F. None of the above. VLAN creations are automatic.

考题 The network administrator has just finished installing a new 10/100/1000 switch, but receives reports from the server administrator that servers connected to the new switch seem to be experiencing slow LAN connections. The network administrator checks the port connecting the new switch to the core switch and sees the following information:Which of the following is the MOST likely cause of the slow connections?()A. The servers have not had VLAN tagging enabled on their NICs.B. Speed and duplex have not been set.C. VLAN tagging was not set on the trunk.D. The servers have been connected with CAT5 cable.

考题 You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()A. The switch name must match the workgroup name of the local network.B. The switch must be configured with an IP address and default gateway.C. The remote workstations must have access to the management VLAN of the switch.D. CDP must be enabled on the switch so that it can be located by other devices on the network.

考题 In which of the following scenarios would the "show cdp neighbors detail"command be an appropriate troubleshooting tool?() A. Two switches are connected via a trunk. Both switches have been assigned an IP address, subnet mask, and default gateway. A ping is successful between the two switches. However, VLAN information is not passed from one switch to the other switch.B. A router and a switch have been assigned an IP address, a subnet mask, and a default gateway. They are directly connected, but a ping between the two devices fails.C. A router connects to another router through a serial interface. Both routers have been assigned an IP address, subnet mask, and default gateway. The routers are running RIP and the networks directly connected to the first router do not pass to the second router. However, a ping from one router to the serial interface of the directly connected neighboring router is successful.D. A router connects to another router via a switch. Both routers and the switch have been assigned an IP address, subnet mask, and default gateway. Neither the routers nor the switch are able to ping one of the hosts that is directly to the switch.

考题 A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?() A. All defined VLANs are allowed on the trunk by default.B. Each VLAN, or VLAN range, that is specified with the switchport mode command.C. Each VLAN, or VLAN range, that is specified with the vtp domain command.D. Each VLAN, or VLAN range, that is specified with the vlan database command.

考题 A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches.Which of the following must you do to accomplish this?()A. You must set each end of the trunk line to IEEE 802.1e encapsulation.B. You must set the same VTP management domain name on both switches.C. You must set all ports on the two switches as access ports.D. You must configure one of the switches as a VTP server.E. You must use a rollover cable to connect the two switches.

考题 You are using VTP version 2 in your network to transport VLAN information between switches. When adding a switch to the network that has been used in the lab previously, you notice that a lot of the existingVLANs have been deleted or replaced with other names. What can you do to prevent this from happeningin the future, without losing all VTP features that you are using today?()A、configure a hard-to-guess VTP domain nameB、use a hard-to-guess VTP passwordC、use VTP transparent modeD、implement VTP version 3

考题 You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()A、Verify that different native VLANs exist between two switches for security purposes.B、Verify that the switch is configured to allow for trunking on the switch ports.C、Verify that each switch port has the proper IP address space assigned to it for the new VLAN. D、Verify that the VLAN virtual interface has been correctly created and enabled.

考题 You work as a network technician at Company. Your boss, Mrs.   , is interested in   switch spoofing.  She asks you how an attacker would collect information with VLAN hoping  through switch spoofing. You should tell her that the attacking station... ()A、...uses VTP to collect VLAN information that is sent out and then tags itself with the domain  information in order to capture the data.B、...will generate frames with two 802.1Q headers to cause the switch to forward the frames to a  VLAN that would be inaccessible to the attacker through legitimate means.C、...uses DTP to negotiate trunking with a switch port and captures all traffic that is allowed on the  trunk.D、...tags itself with all usable VLANs to capture data that is passed through the switch, regardless  of the VLAN to which the data belongs.E、None of the other alternatives apply

考题 You have configured a Cisco Catalyst switch to perform Layer 3 routing via an SVI and have  assigned that interface to VLAN 20. To check the status of the SVI, you issue the show interfaces vlan 20 command at the CLI prompt. You see from the output display that the interface is in an "up/up" state.  What must be true in an SVI configuration to bring the VLAN and line protocol up?()A、The port must be physically connected to another Layer 3 device.B、At least one port in VLAN 20 must be active.C、The Layer 3 routing protocol must be operational and receiving routing updates from neighboring peer devices.D、Because this is a virtual interface, the operational status will always be in an "up/up" state.

考题 You have just created a new VLAN on your network.  What is one step that  you should include in your VLAN based implementation and verification plan? ()A、Verify that different native VLANs exist between two switches for security purposes.B、Verify that the VLAN was added on all switches with the use of the show vlan command. C、Verify that the switch is configured to allow for trunking on the switch ports.D、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.

考题 A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()A、All defined VLANs are allowed on the trunk by default.B、Each VLAN, or VLAN range, that is specified with the switchport mode command.C、Each VLAN, or VLAN range, that is specified with the vtp domain command.D、Each VLAN, or VLAN range, that is specified with the vlan database command.

考题 You have a trunk link operating between two switches and you’re experiencing problems withframes leaking between the two VLANs. Each switch has identical modules, software revisionsand VLAN configuration information. Spanning tree protocol is disabled on all VLANs. What isprobably causing this problem?()A、The link is using IEEE 802.1Q protocolB、The link is using IEEE 802.1E protocolC、Spanning tree is disabledD、Not enough information to determineE、The native VLAN information is identical at each end of the linkF、The native VLAN information is different at each end of the link

考题 ISL is being configured on a Company switch.  Which of the following choices are true regarding  the ISL protocol? ()A、 It can be used between Cisco and non-Cisco switch devices.B、 It calculates a new CRC field on top of the existing CRC field.C、 It adds 4 bytes of protocol-specific information to the original Ethernet frame.D、 It adds 30 bytes of protocol-specific information to the original Ethernet frame.

考题 You are planning a new VLAN-based network solution.  What is one item you should consider when creating your implementation plan as it concerns VLANs?()A、generic router and switch configuration parametersB、end-to-end test plan after all components have been installed and  configuredC、administrator assignmentsD、rollback plan

考题 You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()A、Verify that trunked links are configured to allow the VLAN traffic.B、Verify that the switch is configured to allow for trunking on the switch ports.C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.D、Verify that different native VLANs exist between two switches for security purposes.

考题 What network information do you need when you plan to implement a VLAN-based solution?()A、default VLAN information for all unused switch portsB、802.1x configuration parameters C、number of IP subnets neededD、IP routing protocol information

考题 What is the purpose of the cisco Vlan Trunking protocol?()A、to provide a mechanism to dynamically assign vlan membership to switch portsB、to allow traffic to be carried from multiple vlans over a single link between switchesC、to allow native vlan information to be carried over a trunk linkD、to provide a mechanism to manually assign vlan membership to switch portsE、to allow for managing the additions,deletions,and changes of vlans between switchs

考题 You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()A、The switch name must match the workgroup name of the local network.B、The switch must be configured with an IP address and default gateway.C、The remote workstations must have access to the management VLAN of the switch.D、CDP must be enabled on the switch so that it can be located by other devices on the network.

考题 单选题You have configured a Cisco Catalyst switch to perform Layer 3 routing via an SVI and have  assigned that interface to VLAN 20. To check the status of the SVI, you issue the show interfaces vlan 20 command at the CLI prompt. You see from the output display that the interface is in an "up/up" state.  What must be true in an SVI configuration to bring the VLAN and line protocol up?()A The port must be physically connected to another Layer 3 device.B At least one port in VLAN 20 must be active.C The Layer 3 routing protocol must be operational and receiving routing updates from neighboring peer devices.D Because this is a virtual interface, the operational status will always be in an up/up state.

考题 多选题A new switch is being installed and you have been assigned the task of connecting it to an existing switch. In doing this, you want to set up the VLAN Trunking Protocol so that VLAN information can be passed between the switches. Which of the following must you do to accomplish this?()AYou must set each end of the trunk line to IEEE 802.1e encapsulation.BYou must set the same VTP management domain name on both switches.CYou must set all ports on the two switches as access ports.DYou must configure one of the switches as a VTP server.EYou must use a rollover cable to connect the two switches.

考题 多选题ISL is being configured on a Company switch.  Which of the following choices are true regarding  the ISL protocol? ()AIt can be used between Cisco and non-Cisco switch devices.BIt calculates a new CRC field on top of the existing CRC field.CIt adds 4 bytes of protocol-specific information to the original Ethernet frame.DIt adds 30 bytes of protocol-specific information to the original Ethernet frame.

考题 单选题What network information do you need when you plan to implement a VLAN-based solution?()A default VLAN information for all unused switch portsB 802.1x configuration parameters C number of IP subnets neededD IP routing protocol information