网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Which is not the maintenance work for shaft bearings in transmission system?()
A

check oil level in bearing sump

B

check them for leakagec through end seals

C

pump bilges in time

D

check temperature


参考答案

参考解析
解析: 暂无解析
更多 “单选题Which is not the maintenance work for shaft bearings in transmission system?()A check oil level in bearing sumpB check them for leakagec through end sealsC pump bilges in timeD check temperature” 相关考题
考题 Cleaning, painting and repair work is known as ______.A.maintenance workB.sailor’s workC.daily work

考题 When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB.The stern bearing alignment with the stern frame should be checkedC.The interior of the stern tube should be inspected for leaksD.The shaft liner should be removed and inspected for cracks

考题 Which of the following statements represents an advantage of an electromagnetic clutch?A.Large misalignments can be tolerated between the shaft and engine couplingB.Slip is held to a minimum when reversing shaft rotationC.Engine torsional vibrations to the driven shaft are eliminatedD.It aids in maintaining power factor

考题 In Western Australia,there are around 450 aircraft maintenance engineers,most of______work in the Perth metropolitan area.A.them B.whom C.which D.they

考题 The maintenance work for sailors includes ()(清洁), repairing and painting work on board a ship. 正确答案AA、cleaningB、cleanerC、cleanlyD、cleanness

考题 清洁,涂漆,修理工作称为船舶保养工作。()A、Cleaning, painting and repairing work are known as sailor’s work.B、Cleaning, painting and repairing work are known as maintenance work.C、Painting, repairing and cleaning work are known as maintenance work.D、Cleaning, painting and repairing work are known as daily work.

考题 Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()A、 elapsed time since the target start date or completion date of previous work generated by PM  B、 difference between completion date of previous work and system date is equal to Lead Time  C、 elapsed time since the target start date or completion date of the latest work orders for the assetD、 metered equipment usage since the target start date or completion date of previous work generated by PME、 metered equipment usage since the target start date or completion date of the latest work order for the asset

考题 Cleaning, painting and repairing work is known as ()work.A、sailors’B、motormen’sC、dailyD、maintenance

考题 属于事务控制的语句是()。A、Begin Tran、Commit、RollBackB、Begin、Continue、EndC、Create Tran、Commit、RollBackD、Begin Tran、Continue、End

考题 A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()A、All maintenance personnel have full access to all records.B、All maintenance personnel have read-only access to all data. C、Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.D、Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.

考题 A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work order, after a maintenance manager has approved the work order? ()A、 Approved (APPR)B、 Waiting on Materials (WMATL)C、 Waiting to be Scheduled (WSCH)D、 Waiting on Plant Condition (WPCOND)

考题 You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a stored procedure. The stored procedure implements a database maintenance process. A SQL Server Agent job should be created to that runs the stored procedure. Besides this, you must make sure that after it is completed successfully, the job is removed.  What should you do? ()A、You should create a job which is assigned to the Database Maintenance categoryB、You should create an Alert which will run another to delete the maintenance job.C、You should create a job. You schedule the job to run only once.D、You should create a job. The job uses the Automatically delete job option

考题 单选题The maintenance work for sailors includes ()(清洁), repairing and painting work on board a ship. 正确答案AA cleaningB cleanerC cleanlyD cleanness

考题 单选题The bearings used to support the crankshaft are generally called ()A line shaft bearingsB connecting rod beatingsC main bearingsD support bearings

考题 单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and  have to be ordered.  What is the status of the work order, after a maintenance manager has approved the work order? ()A  Approved (APPR)B  Waiting on Materials (WMATL)C  Waiting to be Scheduled (WSCH)D  Waiting on Plant Condition (WPCOND)

考题 单选题You are using a radar in which your own ship is shown at the center,and the heading flash always points to 0°. If bearings are measured in relation to the flash,what type of bearings are produced? ()A RelativeB TRUEC CompassD Magnetic

考题 单选题Which of the following statements represents an advantage of an electromagnetic clutch?()A Large misalignments can be tolerated between the shaft and engine couplingB Slip is held to a minimum when reversing shaft rotationC Engine torsion vibrations to the driven shaft are eliminatedD It aids in maintaining power factor

考题 单选题When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()A The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB The stern bearing alignment with the stern frame should be checkedC The interior of the stern tube should be inspected for leaksD The shaft liner should be removed and inspected

考题 单选题The main function of tie rods in the construction of large, low speed diesel engines is to().A stiffen the bedplate in way of the main bearings to increase the engines longitudinal strengthB accept most of the tensile loading that results from the firing forces developed during operationC mount the engine frame securely to the hull to prevent shaft coupling misalignmentD connect the crosshead solidly to the piston rod

考题 单选题Which of the following will take place if the clearance of the main bearings are excessive?()A bearing knocksB dropping of pressure of LOC noisesD all the above

考题 单选题Which of the following may take place if the clearance of the main bearings are excessive?()A bearing knocksB dropping of pressure of LOC noisesD all the above

考题 单选题The Chief Petty Officer employed in the repair and maintenance work shall such abilities as to prepare and apply().A primers and paintsB paintersC promisersD compromisers

考题 单选题To protect the rotor of a motor disassembled for maintenance or overhaul, it should be()A suspended by wire slings in one comer of the shopB wrapped in several layers of heavy paper or carboardC supported by flat wood blocks on the workbenchD returned to the frame as soon as the bearings are removed

考题 单选题With reference to a radial piston pump, which one of the following statements is false?()A Surrounding the fixed shaft is a hollow shaftB This hollow shaft carries radial boresC Each bore is fitted with a well-lapped plungerD There are always even numbers of bores

考题 单选题Which of the following actions should be taken if during a routine maintenance inspection of a centrifugal pump, localized scoring on a pump shaft sleeve is detected?()A Correct the cause of the scoring and repair the sleeve or replace with a new oneB Reassemble the unit and provide more water leak off for proper lubricationC Check for parallel alignment of the sleeve radial faces to the sleeve boresD Reassemble the unit and adjust the governor to obtain a slower speed

考题 多选题Based on which two conditions can master Preventive Maintenance (PM) schedules be created?()Aelapsed time since the target start date or completion date of previous work generated by PMBdifference between completion date of previous work and system date is equal to Lead TimeCelapsed time since the target start date or completion date of the latest work orders for the assetDmetered equipment usage since the target start date or completion date of previous work generated by PMEmetered equipment usage since the target start date or completion date of the latest work order for the asset

考题 单选题In some modern large diesel engines, which of the following is used as the support for the main bearings?()A BedplateB BlockC BaseD Sump