网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Upon the survey it is found the deck control valve of the fore peak tank could not be().
A
tighted formally
B
shut tightly
C
combined properly
D
closed suitably
参考答案
参考解析
解析:
暂无解析
更多 “单选题Upon the survey it is found the deck control valve of the fore peak tank could not be().A tighted formallyB shut tightlyC combined properlyD closed suitably” 相关考题
考题
The CO2 flooding system is actuated by a sequence of steps which are ______.A.break glass, pull valve, break glass, pull cylinder controlB.sound evacuation alarm, pull handleC.open bypass valve, break glass, pull handleD.open stop valve, open control valve, trip alarm
考题
The deck control valve to be ______ after being repaired.A.returned and attached againB.moved and fitted againC.removed and refittedD.reproduced and put on again
考题
What type of valve is used to direct the flow of hydraulic fluid?A.relief valveB.direction control valveC.stop valveD.pressure control valve
考题
The survey information upon which a chart is based is found ______.A.at the top center of the next lineB.near the chart titleC.at the lower left cornerD.at any convenient location
考题
What information is NOT found in the chart title?A.Survey informationB.ScaleC.Date of first editionD.Projection
考题
A complaint of unseaworthiness by a majority of crew members to the American Consul is found to be justified after a survey is completed.Who must pay the cost of the survey?A.Crew members requesting the surveyB.American ConsulC.MasterD.Vessel's owners
考题
In Cargo Survey,T.C.V.refers to ______.A.total calculated volumeB.terminal cargo volumeC.tank cargo valveD.tolerance of cargo valve
考题
Before discharge of cargo tank ballast is undertaken,______.A.the deck isolating valve is openB.flue gas isolating valveC.blower suction valveD.blower discharge valve
考题
Valves on steam-smothering lines to cargo tanks shall be set with ______.A.The master control valve shut and valves to individual cargo tanks shutB.The master control valve open and valves to individual cargo tanks shutC.The master control valve shut and valves to individual cargo tanks openD.All valves open
考题
单选题Each inert gas system gas main must have an automatic shut down valve at the outlet of the gas production plant. This valve must close automatically upon().A
cargo pump failureB
blower failureC
deck seal low water levelD
low inert gas temperature
考题
单选题() are used to limit the pressure in any particular portion and mainly control the pressure after the valve.A
Relief valvesB
Check valvesC
Safety valvesD
Reducing valve
考题
单选题The opening or closing of the cylinder starting valve is controlled by ().A
the starting air distributorB
the cut-off valve on the air mainC
the main starting valveD
the air bottle control valve
考题
单选题The deck control valve to be()after being repaired.A
moved and fitted againB
removed and refittedC
reproduced and put on againD
returned and attached again
考题
单选题Upon the survey it is found the deck control valve of the fore peak tank could not be().A
tighted formallyB
shut tightlyC
combined properlyD
closed suitably
考题
单选题Which of the valves listed is NOT considered to be a hydraulic system directional control valve?()A
Spring-centered valveB
Unloading valveC
Three-position valveD
Two-position valve
考题
单选题What type of valve is used to direct the flow of hydraulic fluid?()A
Relief valveB
Direction control valveC
Stop valveD
Pressure control valve
考题
单选题The() is fitted in pair one is the main valve, the other the auxiliary or standby.A
main stem stop valveB
auxiliary steam stop valveC
feed check or control valveD
blow down valve
考题
单选题The survey information upon which a chart is based is found ().A
at the top center of the next lineB
near the chart titleC
at the lower left cornerD
at any convenient location
考题
填空题Concerning the definition of clean food, the survey found it was varied among different regions.____
考题
单选题The C02 flooding system is actuated by a sequence of steps which are().A
break glass,pull valve,break glass,pull cylinder controlB
sound evacuation alarm,pull handleC
open bypass valve,break glass,pull handleD
open stop valve,open control valve,trip alarm
考题
单选题In order to release CO2 to the machinery spaces from a fixed fire extinguishing system, you must().A
actuate an alarm and open the engine room control valveB
actuate an alarm and open the engine room CO2 releasing valveC
open the engine room control valve and shut off engine room ventilation fansD
open the engine room control valve and then the CO2 releasing valve
考题
单选题The() is a smaller valve fitted in the auxiliary steam supply line, and is usually of the non-return type.A
main stem stop valveB
auxiliary steam stop valveC
feed check or control valveD
blow down valve
考题
单选题The temperature of the refrigerant in the evaporator coil depends mostly upon the ().A
refrigerant pressure in the evaporatorB
cooling water temperature to the condenserC
heat load in the refrigerator compartmentD
solenoid valve in the liquid line
考题
单选题If an air compressor is used to supply compressed air to outlets throughout the engine room and on deck of a vessel, the system is known as the ().A
combustion control air systemB
supply air systemC
ships service air systemD
low pressure deck air system
考题
单选题A complaint of unseaworthiness by a majority of crew members to the American Consul is found to be justified after a survey is completed. Who must pay the cost of the survey?()A
Crew members requesting the surveyB
American ConsulC
MasterD
Vessel's owners
考题
单选题A substance found in residual fuels which tends to cause exhaust valve corrosion and grooving, is()A
carbonB
vanadiumC
calciumD
hydrogen
考题
单选题Which of the listed design features is found in an exhaust valve and NOT in an intake valve?()A
Hard alloy steel constructionB
Beveled edges on the valve headC
Low alloy steel constructionD
Poppet type design
热门标签
最新试卷