网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
A
Include a new HMC in the order to connect to the p5 595
B
Include a pair of new HMCs in the order to connect to the p5 595
C
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
D
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A Include a new HMC in the order to connect to the p5 595B Include a pair of new HMCs in the order to connect to the p5 595C Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities” 相关考题
考题
An environment has a DC server and an Exchange server. The administrator needs to install a patch and restart both servers while minimizing downtime. Which of the following is the BEST way to restart the servers?()A. Restart both servers at the same time so the servers are down at the same time.B. DC server first, then the Exchange server second.C. The order in which the servers are restarted does not matter.D. Exchange server first, then the DC server second.
考题
Which three benefits are provided by the implementation of cisco c-series servers into A virtualized data center environment? ()
A.extended memory sipportB.storage-intensive platformC.enterprise-focused designD.infiniband networkingE.blade-based deploymentsF.cost-effiective server
考题
You work as the enterprise exchange administrator at Xxx .The Xxx network consists of a domain named xxx .Xxx currently makes use of Exchange 2000 Server and Exchange Server 2003 Service Pack 2 (SP2) in their messaging system.You receive instruction from Xxx to migrate the messaging system to Exchange Server 2010 with Client Access server, Mailbox server and Hub Transport servers. What actions must you take?()A、You should take away the Exchange 2000 Server servers in the environment.B、You should configure EdgeSync synchronization in the environment.C、You should run the setup /NewProvisionedServer in the environment.D、You should run the Migration Preparation Tool from the other servers in the environment.
考题
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition
考题
Which three benefits are provided by the implementation of cisco c-series servers into Avirtualized data center environment? ()A、extended memory sipportB、storage-intensive platformC、enterprise-focused designD、infiniband networkingE、blade-based deploymentsF、cost-effiective server
考题
A company has several legacy servers that upper management would like to move into a virtual environment. Which of the following is the FIRST step an administrator should take to evaluating whether the servers can be moved into the virtual environment?()A、 Compare the costs of maintenance between the physical and virtual servers.B、 Run SYSPREP on each legacy server.C、 Check the HCL on each legacy server.D、 Verify that all the latest OS service packs are installed on each server.
考题
An environment has a DC server and an Exchange server. The administrator needs to install apatch and restart both servers while minimizing downtime. Which of the following is the BEST way torestart the servers?()A、 Restart both servers at the same time so the servers are down at the same time.B、 DC server first, then the Exchange server second.C、 The order in which the servers are restarted does not matter.D、 Exchange server first, then the DC server second.
考题
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A、Have the PDU requirements been met?B、Are there sufficient KVM connections?C、Is there sufficient service clearance?D、Is there sufficient space in the existing rack?
考题
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
考题
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A、Include a new HMC in the order to connect to the p5 595B、Include a pair of new HMCs in the order to connect to the p5 595C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
考题
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers
考题
Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()A、The server must be installed into a location with a raised floor for optimum system cooling and cable management.B、The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.C、The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.D、The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.
考题
You work as the enterprise exchange administrator at TestKing.com. TestKing.com makes use of Microsoft Exchange Server messaging solution. The TestKing.com network consists of a single ActiveDirectory domain named testking.com. TestKing.com has its headquarters in Chicago and a branch office in Dallas. Both offices are an ActiveDirectory site that is connected via high speed WAN link. The employees in these offices connect locallyto the servers in these offices. You are planning to install Exchange Server 2010; however, you need to plan the installation of theMailbox servers with the following criteria: * It should maintain user access to mailboxes from a server in their site, if a Mailbox server fails. * Remote mailboxes should bei accessible if a site fails.* Use the minimum amount of serves. What should you do?()A、The best option is to install six Mailbox servers.B、The best option is to install four Mailbox servers.C、The best option is to install three Mailbox servers.D、The best option is to install two Mailbox servers.
考题
单选题Companycom is purchasing a 64-way p5 595. They have determined the location for the server is in a datacenter which does not have a raised floor. Which of the following would best meet the server requirements?()A
The server must be installed into a location with a raised floor for optimum system cooling and cable management.B
The server should be purchased as a p5 590 and then upgraded to a p5 595. This will eliminate the need for a raised floor environment.C
The server should be purchased as 32-way p5 595 and then upgraded to a 64-way. This will eliminate the need for a raised floor environment.D
The server can be installed into a location without a raised floor if an RPQ is obtained. It is a strong IBM recommendation for a raised floor, not a requirement.
考题
单选题A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()A
Two p670 serversB
Four p650 serversC
Two p5-570 serversD
Four p5-550 servers
考题
单选题You work as the enterprise exchange administrator at Xxx .The Xxx network consists of a domain named xxx .Xxx currently makes use of Exchange 2000 Server and Exchange Server 2003 Service Pack 2 (SP2) in their messaging system.You receive instruction from Xxx to migrate the messaging system to Exchange Server 2010 with Client Access server, Mailbox server and Hub Transport servers. What actions must you take?()A
You should take away the Exchange 2000 Server servers in the environment.B
You should configure EdgeSync synchronization in the environment.C
You should run the setup /NewProvisionedServer in the environment.D
You should run the Migration Preparation Tool from the other servers in the environment.
考题
单选题Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A
Include a new HMC in the order to connect to the p5 595B
Include a pair of new HMCs in the order to connect to the p5 595C
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
考题
单选题A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()A
Have the PDU requirements been met?B
Are there sufficient KVM connections?C
Is there sufficient service clearance?D
Is there sufficient space in the existing rack?
考题
单选题You work as the enterprise exchange administrator at TestKing.com. TestKing.com makes use of Microsoft Exchange Server messaging solution. The TestKing.com network consists of a single ActiveDirectory domain named testking.com. TestKing.com has its headquarters in Chicago and a branch office in Dallas. Both offices are an ActiveDirectory site that is connected to each other via WAN link. You receive an intruction from management toplan the installation of Exchange Server 2010 in both offices. You need to ensure that user access ismaintained in the event of a server failure as well as keepin the amount of Exchange servers in bothActive Directory sites to a minimum. What should you do?()A
The best option is to install four servers in every Active Directory site.B
The best option is to install three servers in every Active Directory site.C
The best option is to install two servers in every Active Directory site.D
The best option is to install one servers in every Active Directory site.
考题
单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A
PowerVM Lx86B
PowerVM Express EditionC
PowerVM Standard EditionD
PowerVM Enterprise Edition
考题
单选题An environment has a DC server and an Exchange server. The administrator needs to install a patch and restart both servers while minimizing downtime. Which of the following is the BEST way to restart the servers?()A
Restart both servers at the same time so the servers are down at the same time.B
DC server first, then the Exchange server second.C
The order in which the servers are restarted does not matter.D
Exchange server first, then the DC server second.
考题
单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A
Free up one HMC and update the software for use with the p5 570B
Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC
Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D
Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
单选题A company has several legacy servers that upper management would like to move into a virtual environment. Which of the following is the FIRST step an administrator should take to evaluating whether the servers can be moved into the virtual environment?()A
Compare the costs of maintenance between the physical and virtual servers.B
Run SYSPREP on each legacy server.C
Check the HCL on each legacy server.D
Verify that all the latest OS service packs are installed on each server.
考题
单选题You work as the enterprise exchange administrator at TestKing.com. TestKing.com makes use of Microsoft Exchange Server messaging solution. The TestKing.com network consists of a single ActiveDirectory domain named testking.com. TestKing.com has its headquarters in Chicago and a branch office in Dallas. Both offices are an ActiveDirectory site that is connected via high speed WAN link. The employees in these offices connect locallyto the servers in these offices. You are planning to install Exchange Server 2010; however, you need to plan the installation of theMailbox servers with the following criteria: * It should maintain user access to mailboxes from a server in their site, if a Mailbox server fails. * Remote mailboxes should bei accessible if a site fails.* Use the minimum amount of serves. What should you do?()A
The best option is to install six Mailbox servers.B
The best option is to install four Mailbox servers.C
The best option is to install three Mailbox servers.D
The best option is to install two Mailbox servers.
考题
单选题Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A
Run the test and dev LPARs in an uncapped modeB
Activate COD resources if a failover should occurC
Use DLPAR to move resources between the test and dev and the HACMP LPARD
Stop the test and dev environments, bring up new profile for HACMP failover
考题
单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A
New install of AIXB
Migrate the 7040-61DC
Utilize alt_disk_installD
Use the enterprise back up strategy
热门标签
最新试卷