网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The objective of shoring the damaged area of a ship is to ______.

A.force the warped,bulged,or deformed sections back into place

B.support and hold the area in the damaged position

C.withstand subsequent additional damage

D.make a watertight seal at the damaged area


参考答案

更多 “ The objective of shoring the damaged area of a ship is to ______.A.force the warped,bulged,or deformed sections back into placeB.support and hold the area in the damaged positionC.withstand subsequent additional damageD.make a watertight seal at the damaged area ” 相关考题
考题 If the Charterer nominates an unsafe port and the ship is damaged through going there, ________ will be liable for the damage, subject to that the master acts reasonably in going there.A.heB.herC.the ownerD.the shipper

考题 The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to ______.A.dewater the compartmentB.establish and maintain flooding boundariesC.secure power to the compartmentD.counter flood to maintain even keel

考题 When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ______.A.maximum possible areaB.minimum possible areaC.nearest watertight doorD.nearest longitudinal girder

考题 The flood has done_____to this area.A.damages B.many damages C.much damage D.damaging

考题 Topside paint is applied to the area of the ship’s ()which is out of water when the ship is loaded.A、hullB、cabinC、cargo holdD、deck

考题 单选题The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to().A dewater the compartmentB establish and maintain flooding boundariesC secure power to the compartmentD counter flood to maintain even keel

考题 单选题A note of protest is a declaration made by the Master of a vessel before a notary public.Its purpose is to().A Protest acts of violence or misconduct by the vessel's crewB State that damage to cargo or vessel was caused by improper loading or pilferage by others rather than ship's personnelC State that the damage to ship,cargo or both was due to the perils of the seaD State that the perishable cargo was damaged because of negligence by port authorities or other officials

考题 单选题Radiotelephony communication or radio telex communication or both will be carried out by terrestrial or satellite means,()the equipment fitted on ship and the area in which the incident occurs.A depend onB depending onC dependent onD depended on

考题 单选题The Shipowner cannot claim contribution from()if,after general average expenditure has been incurred,the ship and cargo are lost before the conclusion of the voyage.A the CharterersB the carriersC the cargo ownersD the persons of the property damaged

考题 单选题The harbor master ordered that foreign ship to()a safe area.A drift toB shift toC draft toD lift to

考题 单选题()is applied to the area of the ship’s hull which is out of water when the ship is loaded.A Boottopping paintB Topside paintC Bottom paintD Primer

考题 单选题Equipment requirement vary according to().A Ship owner‟s willB economic conditionC the area in which the ship operatesD different orders of all countries

考题 单选题The objective of ISPS Code is()A to protect the marine environmentB to provide a method to avoid an accidentC to protect the ship from collisionD to keep terrorism action away from ships

考题 单选题The procedure of strengthening damaged structures on a ship by using wood or steel is called().A bracingB batteningC blockingD shoring

考题 单选题Some lights used as aids to marine navigation have a red sector to indicate a danger area. The limits of a colored sector of a light are listed in the Light List in which of the following manners?()A Geographical positions outlining the area of the sectorB True bearings as observed from the ship toward the lightC An outline of the area of the sectorD True bearings as observed from the light toward the ship

考题 单选题Damaged bulkheads often take a permanent set which is independent of the panting or bulge caused by water pressure. To control this,you should().A install shoring so the shoring supports the damaged bulkheads without pushing on themB install shoring so that it pushes on the damaged bulkhead while supporting itC use jacks or chain falls to remove the set before installing shoresD place sandbags by the bulkhead without installing shores

考题 单选题How should signal flares be used after you have abandoned ship and are adrift in a liferaft?().A Immediately use all the signals at onceB Use all the signals during the first nightC Employ a signal every hour after abandoning ship until they are goneD Use them only when you are aware of a ship or plane in the area

考题 单选题Which system may be useful for messages,such as local storm warnings or a shore-to-ship distress alert,for which it is inappropriate to alert all ships in the satellite coverage area?()A NAVTEXB EGCC AMVERD DSC

考题 单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()A a watch which is kept with lower standardB a watch which is kept when the ship isnt sailingC a watch which is kept when the ship is sailingD a watch which is kept when the ship is in a restricted visibility area

考题 单选题On a ship,when may a work vest be substituted for a required life preserver?()A To replace a damaged life preserverB For use during fire drillsC For use during boat drillsD At no time

考题 单选题The most important principle in the stowage is().A to ensure the safety of the ship and protect the cargo from being damagedB to avoid the rearrangement of the cargo loaded on boardC to reject the damaged cargo during loadingD to prevent the spontaneous combustion of coal and grain

考题 单选题The objective of shoring the damaged area of a ship is to().A force the warped,bulged,or deformed sections back into placeB support and hold the area in the damaged positionC withstand subsequent additional damageD make a watertight seal at the damaged area

考题 单选题The most important principle in the cargo stowage is().A to avoid the rearrangement of the cargo loaded on boardB to ensure the safety of the ship and cargoC to reject the damaged cargo during loading operationD to prevent the spontaneous combustion of the coal and grain

考题 单选题When shoring a damaged bulkhead,effort should be taken to spread the pressure over the ().A maximum possible areaB minimum possible areaC nearest watertight doorD nearest longitudinal girder

考题 单选题The objective of shoring a damaged bulkhead is to().A force the warped, bulged, or deformed sections back into placeB support and hold the area in the damaged positionC withstand subaequent additional damagedD make a watertight seal at the damaged area

考题 单选题If the Charterer nominates an unsafe port and the ship is damaged through going there,()will be liable for the damage,subject to that the master acts reasonably in going there.A heB sheC the ownerD the shipper

考题 单选题The wooden plug inserted in the vent of a damaged tank of a ship should be removed in case it is decided to().A pump from the damaged tankB fight a fireC abandon the rigD use the crossover system